B.01.01_ATTACHMENT 3 - PWS, EXHIBITS_W91QVN23R0064.pdf
PDF 1 MB Posted
- Attached to
- Telecommunications Infrastructure Support Services, USFK-Wide Federal contract opportunity
- Solicitation number
- W91QVN-23-R-0064
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.01_ATTACHMENT 2 - Schedule of Services (CLINs).xlsx | XLSX spreadsheet | |
| B.01.01_ATTACHMENT 1 - Past Performance Questionnaire (PPQ).pdf | ||
| B.01.01_Released_W91QVN23R0064.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 1 of 16
PERFORMANCE WORK STATEMENT (PWS)
FOR
TELECOMMUNICATIONS INFRASTRUCTURE SUPPORT SERVICE (TISS)
1. GENERAL: The Contractor shall supply all personnel, equipment, tools, materials, supervision, other items and non-personal services necessary to provide the Telecommunications Infrastructure Support Services (TISS) as defined in this Performance Work Statement (PWS).
1.1. Background: This document will identify the safety requirements, list of materials/specifications and performance work standards that will be required by the contractor. It is the vehicle that will allow the assignment of work to a contractor when the 1st Signal Brigade (1st SIG BDE) deems it necessary. This document is also synchronized with the Unified Facilities Criteria (UFC), which are mandated under Department of Defense (DOD) policy. The UFC system is prescribed by Military Standard (MIL-STD) 3007, UFC 1-300-02, Unified Facilities Guide Specifications (UFGS) Format Standard, Change 2, dated 01 April 2019 and provides planning, design, construction, sustainment, restoration, and modernization criteria. The standard applies to military departments, defense agencies, and DOD field activities in accordance with (IAW) the Under Secretary of Defense for Acquisition Technology and Logistics (AT&L) Memorandum dated 29 May 2002. The UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the continental United States (OCONUS) is also governed by the United States Forces Korea (USFK) Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA). Therefore, standard compliance is with the most stringent of the UFC, USFK SOFA, HNFA and/or BIA, as applicable. The United States Army Information Systems Engineering Command (USAISEC) Telecommunications Outside Plant Planning (OSP) and Design Criteria, Dated September 2021 and DISA Functional Requirements Specification (FRS) for Fiber, Facilities and Transport Specifications (FFTS) for Next Generation Optical Transmission document dated 10 April 2019 will be the governing documents for the contractor. These documents establish an implementation concept that can be used to shape architectural templates and to influence the design process for the USAISEC Telecommunications OSP Design Criteria.
It identifies proven infrastructure construction techniques, defines common practices, and serves as an authoritative implementation criterion.
1.2. Scope of Work: The contractor shall install, relocate, repair, or remove fiber optic and/or copper cable infrastructure in accordance with (IAW) Contract Line Item Numbers (CLINs) identified within project specific Engineering Design Plans (EDPs). The contractor shall provide emergency repairs/relocations for outside plant (OSP) (fiber optic and/or copper) cables and except those items specified in paragraph 3 as government furnished materials (GFM) for this contract. The contractor shall perform to the standards identified by paragraph 4 and associated attachments.
1.3. Quality Control Plan (QCP): The Contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
The Contractor shall provide the QCP to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within 30 calendar days after contract award. The contractor shall implement data collection methods to record data ensuring work accomplished meets acceptable performance and technical standards. The data shall identify trends, potential and actual problem areas, deficiencies, and any required corrective action. The contractor shall retain all records of inspections and corrective actions throughout the period of performance. Inspection documents shall be made available to the Government COR, Quality Assurance (QA) representative and the Contracting Office within 24 hours of written request by either party.
1.3.1. At a minimum the quality control plan should address:
Overall project management and administration.
Be a comprehensive program to plan and deliver quality services to the Government.
Cover and prioritize all services described in this contract.
Describe a method acceptable to the Government of identifying deficiencies in the quality of service performed under this contract before the level of performance becomes unacceptable and address processes for corrective actions without dependence upon Government direction.
Establish an inspection system covering all services required by this contract. This plan shall specify areas to be inspected on either a scheduled or an unscheduled basis and the title of the individual who will do the inspection.
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 2 of 16
Contain specific quality control techniques and standards for contract services identified in the Performance Requirements Summary (PRS) and Inspection of Services Clause list. The quality control methods shall be comprehensive and adaptable to the reporting systems of the QCP. Control measures must be specified and metrics developed to ensure accurate program monitoring.
Include a customer complaint feedback system for correction of validated complaints and to inform the Government of corrections. The QCP shall describe how the Government may identify problem areas or situations to the contractor. The customer complaint program shall be compatible with the reporting and communication systems of the QCP.
Require documentation of all contractor quality control inspections and corrective actions to be maintained by the contractor throughout the term of this contract. Inspection documents and the corrective action taken shall be made available to the KO or designated representative.
1.3.2. The Quality Control Plan will be used by the contractor to collect data, evaluate and document performance against standards associated with each specific requirement. Performance is measured by assessing the required workload quantity in terms of quality and timeliness. The contractor shall use the format measure each line item in the PRS table.
1.4. Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the maximum Contract File Index acceptable defect rate(s).
1.4.1. Deficiencies: The Government reserves the right to refuse final acceptance until all deficiencies have been resolved (per all stated requirements). The Government will review all results and prepare a list of deficiencies, if any.
The deficiency list shall include any problem(s) detected/identified during testing and/or inspections conducted by either the contractor or the government, or both.
1.5. Period of Performance (PoP): The period of performance shall be for one (1) Base Year, and Four (4) Option Years.
1.5.1. The Period of Performance reads as follows:
Base Period: 01 Jul 2023 – 30 Jun 2024 Option Period 1: 01 Jul 2024 – 30 Jun 2025 Option Period 2: 01 Jul 2025 – 30 Jun 2026 Option Period 3: 01 Jul 2026 – 30 Jun 2027 Option Period 4: 01 Jul 2027 – 30 Jun 2028
1.6. Recognized Holidays: The contractor is required to provide services on the Holidays listed below.
1.7. Hours of Operation: The contractor is responsible for provisioning, installation, coordination with Government Tech-Control Facilities (TCF), operation and maintenance of provided leased circuits, troubleshooting, routine maintenance (between the hours of 0730 - 1700, Monday through Friday, excluding ROK and American Legal Holidays and ROK executive order as a ROK and American Legal Holiday) and emergency maintenance (between the hours of 0600 - 2000, Monday thru Saturday, except when a government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings). The contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this performance work statement when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force is essential.
1.8. Place of Performance: The work to be performed under this contract will be in locations where all trunks, circuits, telephones, cables and cable routing are installed. Minimum locations include Camp Casey, Camp Hovey, Camp Bonifas, Warrior Base, Yongsan Garrison, K-16 Airfield, Command Post TANGO, Suwon Air Base (AB), Third Republic Of Korea Army (TROKA), First Republic Of Korea Army (FROKA), Osan AB, Camp Humphreys, Kunsan AB, Kwangju AB, Camp Mujuk, Camp Carroll, Camp Henry, Camp Walker, K2 AB, Second Republic Of Korea Army
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 3 of 16
(SROKA), Camp Carroll, Busan Storage Facility, Pier #8, Kwang-ju AB and Kimhae AB. Area of coverage may exceed what is currently documented – manned and unmanned mountain-top locations will be placed under this contract.
1.9. Security Requirements. All communication methods that includes analog/digital trunks, circuits, telephones, cables, duct and network or telecommunication long haul paths will be permitted the Authorized Service Interrupted (ASI) approved by Facility Control Office (FCO) properly protected to provide secure and uninterrupted services to the Government 24 hours a day 7 days a week. The secret-level security clearance is not required; however, the contractor is required to comply with the physical security as provided below.
1.9.1. Contractor and all associated sub-contractor's employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.9.2. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.9.3. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 90 calendar days of contract award and within 60 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.10. Contractor’s Qualification. The prime contractor shall have the following qualifications:
a. Communications License issued by the Korean Communications Commission (KCC) (정보통신공사업등록증).
1.10.1. Personnel:
1.10.1.1 Key Personnel: The contractor shall provide a Contract Manager (CM) who shall be responsible for the performance of the work. The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager shall be available between the hours of 0600 - 2000, Monday thru Saturday, except when a government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. Qualifications for all key personnel are listed below:
1.10.1.2 Contract Manager (CM) and Project Manager (PM): The contractor shall provide both CM and PM validating resume with the following qualifications:
a. Minimum Bachelors of Science (BS) degree in Information Technology or related field.
b. Demonstrating a minimum of three (3) years of experience within the last five (5) years in contract management or project management with satisfactory prior experience relating to telecommunications support (installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network).
c. CM and PM shall be able to communicate and fully be able to carry a coherent conversation in English without constant stoppage due to inadequate English language skills or understanding.
CM and PM’s resume must clearly identify the qualifications above in the following format:
a. Position title held.
b. A clear description of qualifying work experience.
c. Length of work experience (year/month/date – year/month/date).
d. Complete point of contract of employer (business name, point of contact information [name, phone number, email address]).
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 4 of 16
1.10.1.3 The Contractor shall ensure that the professional and technical personnel working on this contract have sufficient qualifications to perform the work in accordance with all requirements of this contract.
1.10.1.4 When working with non-1st Theater Signal Brigade stakeholders, contractors shall provide technical advice or information only. Contractor employees shall clearly indicate that they do not represent the Government. The contractor shall not exercise any Governmental discretion by obligating Government by entering into agreements with stakeholders.
1.10.2. Identification of Contractor Personnel Requirements: In accordance with FAR subpart 37.114, l Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials.
Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee’s name, the Contractor’s name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents or reports they produce are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall identify the contractor employee as such and identify the employing contractor. All e-mail address lines shall include CTR in the address line.
1.10.3. Safety Requirements: In performing work under this contract, the contractor shall:
1.10.3.1 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
1.10.3.2 Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910) and Korea Environmental Governing Standards by U.S. Forces Korea.
1.10.3.3 Develop and deliver a safety plan within 30 calendar days of contract award for the protection of government facilities and property and to provide a safe work environment for the contractor personnel.
1.10.3.4 Provide protection to government property in preventing damage during the period of time the property is under the control or in possession of the contractor.
1.10.3.5 Include a clause in all sub-contractors contracts to require sub-contractors to comply with the Safety provisions of this contract as applicable.
1.10.3.6 Report promptly (within one hour), 24 hours a day, 7 days a week, 365 days a year, to the Contracting Officer or Contracting Officer's Representative, all available facts relating to each instance of damage to government property and/or injury to either contractor or government personnel.
1.10.3.7 In the event of an accident/mishap, take reasonable and prudent actions to establish control of the accident/mishap scene, prevent further injury to persons or property, and preserve evidence until released by the accident/mishap investigative authority with the verbal and/or written concurrence of the Contract Officer.
1.10.3.8 If the government elects to conduct an investigation of the accident/mishap, cooperate fully and assist any government representative in the conduct of the investigation until the investigation is completed.
1.10.3.9 Include a clause in each applicable subcontract requiring the sub-contractor’s cooperation and assistance with the accident reporting and investigation.
1.10.3.10 DA form 285, US Army Accident Report, shall be completed and submitted to HQs, 1st Theater Signal Brigade, and ATTN: NETC-SKC-SA, Unit #15271, and APO AP 96271-5271 within five (5) working days after the occurrence of the accident. All blocks of the report shall be completed to include the descriptive narrative. Cost of
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 5 of 16 damage and/or injuries shall be included in the report.
1.10.4. Enforcing Safety Regulations.
1.10.4.1 Providing annual training to all personnel on the safe practices and skills to include First Aid and Cardiopulmonary Resuscitation (CPR). Establishing a fire prevention program at each work site location and ensure each employee is familiar with operating fire suppression equipment.
1.10.4.2 Ensuring a bilingual (Korean and English) Safety Standard Operating Procedures (SOP) is available at all operational work sites. Contract supervisors shall ensure that all personnel read and understand the Safety SOP.
1.10.4.3 Posting bilingual (Korean and English) accident prevention signs and symbols at designated and known physical hazard areas. Reference DA PAM 385-10 for design specifications and safety color-coding.
1.10.4.4 All contractor personnel working in maintenance holes shall have a U.S or ROK certificate of training for confined space entry and confined space rescue.
1.10.4.5 All contractor personnel performing direct labor for any delivery order shall have a valid U.S or ROK Cardiopulmonary Resuscitation (CPR) and First Aid certificate.
1.10.5. Emergency Repairs/Relocations.
1.10.5.1 Emergency services are work that is required outside of normal duty hours for restoration of communications circuits or system identified by the 1st Theater Signal Brigade, the COR, or their designated representatives. The initiation of emergency work after normal duty hours shall be directed by the Contracting Officer. The KO will give a verbal authorization for work to proceed and an order will be accomplished after the work has been completed. No other Government representative is authorized to order emergency repair and maintenance services. Emergency services ordered by anyone other than the KO will not be reimbursed.
1.10.5.2 The Contractor will be notified by the COR of the malfunction, location(s), and type of work required to include any special instructions or date deemed necessary for the required emergency work.
1.10.5.3 Emergency services shall be provided outside of normal duty hours, seven (7) days per week, on an on-call basis. Within ten (10) working days after contract award, the Contractor shall provide the Contracting Officer/Contracting Officer's Representative with a point of contact where notification of emergency requirements can be made at any time. The Contractor roving team for emergency services shall be at the suspected trouble area within four (4) hours after notification by the Contracting Officer.
1.10.5.4 It is anticipated that emergency services work would occur no more than three times per year.
1.11. DEBRIS REMOVAL DISPOSAL INFORMATION.
1.11.1. The Contractor shall be responsible for removal of cable, equipment and material from job site to the government designated area. The Contractor shall be responsible for coordinating delivery of unused GFM for turn-in to the Government. The Contractor shall be responsible for removing and disposing any waste materials generated from the PWS that are not transferred to the 1st Theater Signal Brigade.
1.11.2. The contractor shall be responsible for the removal and proper disposal of all service debris and industrial waste materials to an appropriate disposal location outside the compound in accordance with ROK Ministry of Environmental (MOE) laws and regulations and it is the offeror's responsibility regarding the preparation of their proposal to reflect these additional costs in the offeror's proposal.
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 6 of 16
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. Contractor. A supplier or vendor having a contract to provide specific supplies or service to the government.
2.1.2. Contracting Officer (KO). An employee of the U.S. Government with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. Ordering Officer (OO). An individual authorized by FAR to place orders against indefinite delivery contracts.
2.1.4. Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5. Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
2.1.6. Deliverable. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.7. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8. Physical Security. Actions that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11. Quality Control. All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. Sub-contractor. One that enters into a contract with a prime contractor. The Government does not have privates of contract with the sub-contractor.
2.1.13. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.14. Work Week. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 7 of 16
CFM Contractor Furnished Material CFR Code of Federal Regulations COR Contracting Officer’s Representative CSA Communications Services Agreement DID Direct Inward Dialing DOD Direct Outward Dialing FAR Federal Acquisition Regulation FSC Federal Service Code GFM Government Furnished Material IDIQ Indefinite delivery indefinite quantity KO Contracting Officer OCI Organizational Conflict of Interest OSHA Occupational Safety and Health Act PWS Performance Work Statement ROK Republic of Korea QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TCF Technical Control Facility UIC Unit Identification Code XML Extensible Markup Language
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, SERVICES, AND FACILITY
3. GOVERNMENT FURNISHED ITEMS AND SERVICES: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND PARTS
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: N/A
PART 5
SPECIFIC REQUIREMENTS AND DELIVERABLES
5. SPECIFIC REQUIREMENTS: The contractor shall perform the tasks identified below to provide telecommunications infrastructure to support 1st Theater Signal Brigade and USFK communications requirements within the Republic of Korea (ROK). These tasks shall be performed both on U.S. military installations and at new or existing cable pathways which provide communications connectivity between U.S. military installations throughout the ROK. The contractor shall provide telecommunications infrastructure to support USFK requirements on ROK military
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 8 of 16 installations. The contractor shall perform the tasks to provide telecommunications infrastructure to support 1st Theater Signal Brigade and USFK communications requirements within the Republic of Korea (ROK). The specific tasks to be performed for each project will be delineated in the Government’s Engineering Design Plan (EDP) for that specific project with appropriate CLINs identified. The EDP will provide basic information needed to complete the delivery order. As a minimum, it will show a diagram identifying specific locations where the work will take place, maintenance or hand holes affected, splice locations, termination locations, routing of new cable, if appropriate and for inside plant work such as installing Cat 6 cable, floor plans showing drop locations, termination points, and any additional information needed to complete the delivery order. The GFM will be identified and applicable CLINs and quantities will be identified.
5.1. Specific Requirements:
5.1.1. The contractor shall provide services for trenching, refer to Technical Exhibit 1.
5.1.2. The contractor shall provide services for installation of underground conduit systems and cable, refer to Technical Exhibit 2.
5.1.3. The contractor shall provide services for installation of aerial systems and cable, refer to Technical Exhibit 3.
5.1.4. The contractor shall provide services for installation of maintenance holes and hand holes, refer to Technical Exhibit 4.
5.1.5. The contractor shall provide services for installation and splicing of fiber optic cables refer to Technical Exhibit 5.
5.1.6. The contractor shall provide services for installation, splicing and termination of copper cables, refer to Technical Exhibit 6.
5.1.7. The contractor shall provide services for installation of grounding and bonding, refer to Technical Exhibit 7.
5.1.8. The contractor shall provide services for testing copper, fiber cables refer to Technical Exhibit 8.
5.1.9. The contractor shall provide services for removing cable from conduits, refer to Technical Exhibit 9.
5.1.10. The contractor shall provide services for installation and use of innerduct and subdividing conduit refer to Technical Exhibit 10.
5.1.11. The contractor shall provide services for installation of outside pull boxes, refer to Technical Exhibit 11.
5.1.12. The contractor shall provide updated Plant-in-Place drawings, refer to Technical Exhibit 12.
5.2. Periodic Contractor Progress, Status, and Management Reports: The Contractor shall meet with the contracting officer representative (COR) to provide project status on a periodic basis. The Contractor shall provide a comprehensive progress, status, and management report to the COR when 50 and 75 percent of the work has been completed. The report shall include a narrative description of what was accomplished during the reporting period, fiscal data (cost and manpower by labor category) for the reporting period, cumulative fiscal data, and an overview of activities planned for the following period. The report shall identify problems encountered which impact the cost, scope, or schedule.
5.3. Implementation Plan: The Contractor shall deliver an Implementation Plan to the Contracting Officer's Representative prior to starting performance of each task order issued that will include a basic plan that provides the implementation schedule and describes the implementation approach to accomplishing each task order.
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 9 of 16
PART 6
PERFORMANCE REQUIREMENTS SUMMARY
6.1. The contract performance requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement.
6.2. The PRS and the contractor’s QCP provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. The COR or designated representative will conduct the inspections, and any deficiencies are to be provided to the contractor in writing.
Objective Performance Standard erformance Threshold
Method of Surveillance
Discrepancy Remedy
Installation of Maintenance Holes (MH) and Hand Holes (HH) PWS para, 5.1.4 (See para 7.4.TE 4)
Ground rods in newly installed MH and HH should have a resistance reading of 10 ohms or less.
100% Contractor shall measure the resistance, COR/Inspector validate 100%
Contractor shall correct the non-conformed requirement at no added cost to the government within five (5) business days.
Installation of Maintenance Holes and Hand Holes, PWS para, 5.1.4 (See para 7.4.TE 4)
All MH and HH will have a locking mechanism for the cover.
100% COR/Inspector will validate 100% on every MH and HH
Contractor shall correct the non-conformed requirement at no added cost to the government within five (5) business days.
Testing of Fiber, Cables, PWS para 5.1.8 (See para 7.8.TE 8)
Fusion splices on the Korea Optical Backbone Replacement (KOBR) and Multiprotocol Label Switching (MPLS) System fibers shall have a bi-directional insertion loss averaged value of <0.05 dB.
100% COR/Inspector will validate100% of the requirement.
Contractor shall correct the non- conformed requirement at no added cost to the government within five (5) business days.
ATTACHMENT3‐PWS/EXHIBITS (W91QVN23R0064) Page 10 of 16
Testing of Fiber, Cables, PWS para 5.1.8 (See para 7.8.TE 8)
The Polarization Mode Dispersion (PMD) for all currently installed fibers on the Korea Optical Backbone Replacement (KOBR) and Multiprotocol Label Switching (MPLS) System fibers shall have a value of <0.1 ps/km1/2 on the span when measured 1550 nm.
100% COR/Inspector will validate100% of the requirement.
Contractor shall correct the non- conformed requirement at no added cost to the government within five (5) business days.
Testing of Fiber, Cables, PWS para 5.1.8 (See para 7.8.TE 8)
The Chromatic Dispersion (CD) for all currently installed fibers on the Korea Optical Backbone Replacement (KOBR) and Multiprotocol Label Switching (MPLS) System fibers shall have value of <2.0 ps/km nm on the span when measured 1550 nm.
100% COR/Inspector will validate100% of the requirement.
Contractor shall correct the non- conformed requirement at no added cost to the government within five (5) business days.
Testing of Fiber Cables PWS para 5.1.8 (See para 7.8.TE 8)
Fusion Splicing for all other fiber Optic cables shall have a bi-directional insertion loss averaged value of <0.1dB.
Not greater than
0.15 dB
COR/Inspector will validate 100% of the test results and requirement
Contractor shall correct the non-conformed requirement at no added cost to the government within five (5) business days.
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 11 of 16
PART 7
ATTACHMENT/TECHNICAL EXHIBITS
7. TECHNICAL EXHIBITS
7.1. TECHNICAL EXHIBIT 1
7.1.1. Guidance on Excavation
7.1.1.1. All excavations shall be accomplished IAW the following documents listed in Priority order:
7.1.1.1.1. United States Army Information Systems Engineering Command (USAISEC) Telecommunications Outside Plant Design (OSP) Criteria, dated September 2021, Section 3.0.
7.1.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Part 3
7.1.1.1.3. UFGS 33 71 02 Underground Electrical Distribution, Sections 3.7 and 3.18
7.1.1.1.4. Engineering Design Plan (EDP)
7.1.1.1.5. Korea Occupational Safety and Health Agency Standards.
7.2. TECHNICAL EXHIBIT 2
7.2.1. Installation of Underground Systems
7.2.1.1. All Installations of Underground Systems shall be accomplished IAW the following documents listed in Priority Order:
7.2.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021
7.2.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Part 3
7.2.1.1.3. UFGS 33 71 02 Underground Electrical Distribution, Section 3
7.2.1.1.4. USDA Rural Utilities Service (RUS) Bulletin 1751F-643, Underground Plant Design, dated August 28, 2002, available online at https://www.rd.usda.gov/
7.2.1.1.5. Article 100 Definitions Ground of the 2021 Edition National Fire Protection Association 70E-Standard for Electrical Safety in the Workplace (2021 NFPA 70E)
7.2.1.1.6. ANSI/TIA-758-B, Customer-Owned Outside Plant Telecommunications Infrastructure Standard, dated 27 March 2012.
7.2.1.1.7. Engineering Design Plan (EDP)
7.2.1.1.8. Korea Occupational Safety and Health Agency Standards.
7.3. TECHNICAL EXHIBIT 3
7.3.1. Aerial Installations
7.3.1.1. All Aerial Installation shall be accomplished IAW the following documents listed in Priority Order:
7.3.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021, Section 3.5
7.3.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Sections, 2.3.1.1, 2.3.2.1, 2.8.1.2 and 3.1.9
7.3.1.1.3. USDA RUS Bulletins 1751F-630, Design of Aerial Plant and 1753F-152, Specifications & Drawings for Construction of Aerial Plant, dated September 2001, available online at https://www.rd.usda.gov/
7.3.1.1.4. Engineering Design Plan (EDP).
7.3.1.1.5. Korea Occupational Safety and Health Agency Standards
7.4. TECHNICAL EXHIBIT 4
7.4.1. Installation of Maintenance Holes and Hand Holes
7.4.1.1. All Installation of Maintenance Holes and Hand Holes shall be accomplished IAW the following documents
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 12 of 16 listed in priority order:
7.4.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021, paragraphs 2.1.2 and 2.1.3
7.4.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Sections, 2.11 and 3.1.8.3
7.4.1.1.3. USDA RUS Bulletin 1751F-643, Underground Plant Design, dated August 28, 2002, available online at https://www.rd.usda.gov/
7.4.1.1.4. UFGS 33 71 02 Underground Electrical Distribution, Section 3.1
7.4.1.1.5. Article 100 Definitions Ground. of the 2021 Edition National Fire Protection Association 70E-Standard for Electrical Safety in the Workplace (2021 NFPA 70E)
7.4.1.1.6. Engineering Design Plan (EDP)
7.4.1.1.7. Korea Occupational Safety and Health Agency Standards.
7.5. TECHNICAL EXHIBIT 5
7.5.1. Installation and Splicing Fiber Optic Cables
7.5.1.1. All Installation and splicing of Fiber Optic Cable shall be accomplished IAW the following documents listed in priority order:
7.5.1.2. USAISEC Telecommunications OSP Criteria, dated September 2021, Section 4.3
7.5.1.3. DISA FRS FFTS for Next Generation Optical Transmission document dated 10 April 2019, Section 1.2.6
7.5.1.4. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Section 3.1.10.2
7.5.1.5. Telecommunications Industry Association TIA/EIA 606.
7.5.1.6. USDA RUS Bulletin 1753F-401, Splicing Copper and Fiber Optic Cables, dated February 1995, available online at https://www.rd.usda.gov/
7.5.1.7. Engineering Design Plan (EDP)
7.5.1.8. Korea Occupational Safety and Health Agency Standards.
7.6. TECHNICAL EXHIBIT 6
7.6.1. Installation, Splicing and Termination of Copper Cables
7.6.1.1. All Installation, Splicing and Termination of Copper Cables shall be accomplished IAW the following documents listed in priority order:
7.6.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021, Section 4.2
7.6.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Section 3.1.10.2
7.6.1.1.3. Article 100 Definitions Ground. of the 2021 Edition National Fire Protection Association 70E-Standard for Electrical Safety in the Workplace (2021 NFPA 70E)
7.6.1.1.4. USDA RUS Bulletin 1753F-401, Splicing Copper and Fiber Optic Cables, dated February 1995, available online at https://www.rd.usda.gov/
7.6.1.1.5. Engineering Design Plan (EDP)
7.6.1.1.6. Korea Occupational Safety and Health Agency Standards.
7.7. TECHNICAL EXHIBIT 7
7.7.1. Installation of Grounding and Bonding
7.7.1.1. All Grounding shall be accomplished IAW the following documents listed in priority order:
7.7.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021, Section 2.2.5 and 5.2
7.7.1.1.2. Article 100 Definitions Ground of the 2021 Edition National Fire Protection Association 70E-Standard for Electrical Safety in the Workplace (2021 NFPA 70E).
7.7.1.1.3. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Section 2.8.3, 2.13, 3.1.12
7.7.1.1.4. Military Handbook 419A – Grounding, Bonding and Shielding for Electronic Equipment and Facilities, available online at https://www.wbdg.org/ffc/navy-navfac/criteria-manuals
7.7.1.1.5. Military Standard 188-124B- Grounding, Bonding and Shielding for Common Long Haul/Tactical
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 13 of 16
Communication Systems Including Ground Based Communications- Electronics Facilities and Equipment, available online at https://quicksearch.dla.mil
7.7.1.1.6. TIA-607-D, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
7.7.1.1.7. Engineering Design Plan (EDP)
7.7.1.1.8. Korea Occupational Safety and Health Agency Standards.
7.8. TECHNICAL EXHIBIT 8
7.8.1. Testing of Copper and Fiber Cables
7.8.1.1. All Testing of Copper and Fiber cables shall be accomplished IAW the following documents listed in priority order:
7.8.1.1.1. USAISEC Telecommunications OSP Criteria, dated September 2021, Section 4.2.9
7.8.1.1.2. UFGS 33 82 00 Telecommunications Outside Plant (OSP), Section 3.5.2
7.8.1.1.3. DISA FRS FFTS for Next Generation Optical Transmission document dated 10 April 2019, Section 1.2.11 and 1.2.12
7.8.1.1.4. Engineering Design Plan (EDP)
7.8.1.1.5. Korea Occupational Safety and Health Agency Standards
7.9. TECHNICAL EXHIBIT 9
7.9.1. Instructions for Removing Cable from Conduits
7.9.1.1. The contract shall coordinate with the COR to verify which cables are to be removed from a specific conduit.
7.9.1.2. The contractor shall clean each maintenance hole after removing cable from the conduit.
7.9.1.3. The contractor shall remove all non-copper cable from the worksite and dispose of IAW Korea Environmental standards.
7.9.1.4. The contractor shall remove all copper cable from the worksite and coordinate with the COR for disposition.
7.10. TECHNICAL EXHIBIT 10
7.10.1. Installation and use Innerduct and Subdividing Conduit
7.10.1.1. IAW USAISEC Telecommunications OSP Criteria, dated September 2021, paragraph 3.3.2.2, 3.3.2.12-13
7.10.1.2. The contractor shall ensure that all inner ducts are aligned by matching colors.
7.10.1.3. The contractor shall install pull strings in each vacant conduit and secure the pull string to the cable ladder rack within each maintenance hole.
7.11. TECHNICAL EXHIBIT 11
7.11.1. Installation of Outside Pull Boxes
7.11.1.1. IAW USAISEC Telecommunications OSP Criteria, dated September 2021, paragraph 5.1.2.1
7.11.1.2. The size of the pull box will be determined by the Engineer and be called out in the EDP.
7.11.1.3. The contractor shall verify with the COR that approval has been given to mount the pull box on the outside of a building.
7.12. TECHNICAL EXHIBIT 12
7.12.1. Updating Plant-In-Place (PIP) Drawings
7.12.1.1. The Contractor shall compare the existing cable systems with drawings provided by the 1st SIG BDE, S-3 Engineering Branch. Red line corrections, notes, sketches, and general narrative description shall be made of the discrepancies noted. The Contractor shall discuss the proposed corrected drawings with the COR or designated Quality Assurance Evaluator (QAE) for submission to EO, and where necessary, corrections shall be incorporated
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 14 of 16 into the drawings.
7.12.1.2. All engineered project drawings will be given to the contractor in a .DWG format.
7.12.1.3. All As-Built drawings will be accomplished and handed over to the COR in an electronic form using the Autodesk software.
7.12.1.4. All drawings will be validated by the COR as correct and a hard copy will bear the signature and date of the contractor and the COR upon completion and will become a part of the deliverables.
USAISEC System Diagram Conduit Placement and Cut and Resurface
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 15 of 16
USAISEC Standard Diagram Double Stepped Tee-Cut and Resurface Details
USAISEC Standard Diagram Large Maintenance Hole Detail Typical
W91QVN‐23‐R‐0064, ATTACHMENT 3 – PWS/EXHIBITS Page 16 of 16
USAISEC Standard Diagram Splay Maintenance Hole Detail Typical
USAISEC Pedestals and Building Entrance Detail