B.01.01_ATTACHMENT 2 - Schedule of Services (CLINs).xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Telecommunications Infrastructure Support Services, USFK-Wide Federal contract opportunity
Solicitation number
W91QVN-23-R-0064
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Telecommunications Infrastructure Support Services, USFK-Wide, newest first.
File Type Posted
B.01.01_ATTACHMENT 3 - PWS, EXHIBITS_W91QVN23R0064.pdf PDF
B.01.01_ATTACHMENT 1 - Past Performance Questionnaire (PPQ).pdf PDF
B.01.01_Released_W91QVN23R0064.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period

ATTACHMENT 2 - SCHEDULE OF SERVICES

Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide

Base Period: 1 July 2023 - 30 June 2024
CLINSupply & Services /DescriptionMax Qty for Each OYQtyUnitUnit PriceAmount
0001Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable100,00040,000FT
0002Install ground rod to include grounding of cable/terminal100100EA
0003Install Protected Entrance Terminal (PET) housing for copper cable5050EA
0004Install Splice case for copper cable5050EA
0005Provide CFM & install ¾-inch, fire-retardant plywood backboard4040EA
0006Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores)300,000160,000FT
0007Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores)1,000,000800,000FT
0008Install fiber optic termination panel (wall mount or rack)100100EA
0009Installation of fiber optic cable splice enclosure kit (12 to 144 cores)100100EA
0010Provide CFM & Install
Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present5,0005,000FT
0011Provide CFM & Install
Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit20,00020,000FT
0012Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct10,00010,000FT
0013Core drill 1/2 inch to 4 inch hole1,0001,000EA
0014Provide CFM & Install 2 to 4 inch building entrance conduit10050EA
0015Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation3025EA
0016Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation105EA
0017Provide CFM & Install strand and guy wires for aerial cable50,00050,000FT
0018Install cable on guy wires for aerial to include splicing, termination and testing of cable.65,00065,000FT
0019Install splice case on strand2020EA
0020Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building30,00025,000FT
0021Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building200100FT
0022Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides200200FT
0023Deinstall cable in conduits1,000,0001,000,000FT
0024Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)10,0006,000FT
0025Install outside pull-box (Various sizes)10040EA
0026Provide CFM & Install pulling wire in ducts1,000,0001,000,000FT
0027ESTIMATED COST FOR WAR HAZARD LOSSES

Estimated Cost for War Hazard Losses is Zero ($0.00).

1st Option Period

ATTACHMENT 2 - SCHEDULE OF SERVICES

Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide

1st Option Period: 1 July 2024 - 30 June 2025
CLINSupply & Services /DescriptionMax Qty for Each OYQtyUnitUnit PriceAmount
1001Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable100,00040,000FT
1002Install ground rod to include grounding of cable/terminal100100EA
1003Install Protected Entrance Terminal (PET) housing for copper cable5050EA
1004Install Splice case for copper cable5050EA
1005Provide CFM & install ¾-inch, fire-retardant plywood backboard4040EA
1006Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores)300,000160,000FT
1007Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores)1,000,000800,000FT
1008Install fiber optic termination panel (wall mount or rack)100100EA
1009Installation of fiber optic cable splice enclosure kit (12 to 144 cores)100100EA
1010Provide CFM & Install
Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present5,0005,000FT
1011Provide CFM & Install
Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit20,00020,000FT
1012Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct10,00010,000FT
1013Core drill 1/2 inch to 4 inch hole1,0001,000EA
1014Provide CFM & Install 2 to 4 inch building entrance conduit10050EA
1015Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation3025EA
1016Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation105EA
1017Provide CFM & Install strand and guy wires for aerial cable50,00050,000FT
1018Install cable on guy wires for aerial to include splicing, termination and testing of cable.65,00065,000FT
1019Install splice case on strand2020EA
1020Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building30,00025,000FT
1021Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building200100FT
1022Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides200200FT
1023Deinstall cable in conduits1,000,0001,000,000FT
1024Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)10,0006,000FT
1025Install outside pull-box (Various sizes)10040EA
1026Provide CFM & Install pulling wire in ducts1,000,0001,000,000FT
1027ESTIMATED COST FOR WAR HAZARD LOSSES

2nd Option Period

ATTACHMENT 2 - SCHEDULE OF SERVICES

Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide

2nd Option Period: 1 July 2025 - 30 June 2026
CLINSupply & Services /DescriptionMax Qty for Each OYQtyUnitUnit PriceAmount
2001Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable100,00040,000FT
2002Install ground rod to include grounding of cable/terminal100100EA
2003Install Protected Entrance Terminal (PET) housing for copper cable5050EA
2004Install Splice case for copper cable5050EA
2005Provide CFM & install ¾-inch, fire-retardant plywood backboard4040EA
2006Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores)300,000160,000FT
2007Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores)1,000,000800,000FT
2008Install fiber optic termination panel (wall mount or rack)100100EA
2009Installation of fiber optic cable splice enclosure kit (12 to 144 cores)100100EA
2010Provide CFM & Install
Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present5,0005,000FT
2011Provide CFM & Install
Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit20,00020,000FT
2012Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct10,00010,000FT
2013Core drill 1/2 inch to 4 inch hole1,0001,000EA
2014Provide CFM & Install 2 to 4 inch building entrance conduit10050EA
2015Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation3025EA
2016Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation105EA
2017Provide CFM & Install strand and guy wires for aerial cable50,00050,000FT
2018Install cable on guy wires for aerial to include splicing, termination and testing of cable.65,00065,000FT
2019Install splice case on strand2020EA
2020Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building30,00025,000FT
2021Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building200100FT
2022Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides200200FT
2023Deinstall cable in conduits1,000,0001,000,000FT
2024Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)10,0006,000FT
2025Install outside pull-box (Various sizes)10040EA
2026Provide CFM & Install pulling wire in ducts1,000,0001,000,000FT
2027ESTIMATED COST FOR WAR HAZARD LOSSES

3rd Option Period

ATTACHMENT 2 - SCHEDULE OF SERVICES

Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide

3rd Option Period: 1 July 2026 - 30 June 2027
CLINSupply & Services /DescriptionMax Qty for Each OYQtyUnitUnit PriceAmount
3001Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable100,00040,000FT
3002Install ground rod to include grounding of cable/terminal100100EA
3003Install Protected Entrance Terminal (PET) housing for copper cable5050EA
3004Install Splice case for copper cable5050EA
3005Provide CFM & install ¾-inch, fire-retardant plywood backboard4040EA
3006Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores)300,000160,000FT
3007Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores)1,000,000800,000FT
3008Install fiber optic termination panel (wall mount or rack)100100EA
3009Installation of fiber optic cable splice enclosure kit (12 to 144 cores)100100EA
3010Provide CFM & Install
Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present5,0005,000FT
3011Provide CFM & Install
Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit20,00020,000FT
3012Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct10,00010,000FT
3013Core drill 1/2 inch to 4 inch hole1,0001,000EA
3014Provide CFM & Install 2 to 4 inch building entrance conduit10050EA
3015Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation3025EA
3016Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation105EA
3017Provide CFM & Install strand and guy wires for aerial cable50,00050,000FT
3018Install cable on guy wires for aerial to include splicing, termination and testing of cable.65,00065,000FT
3019Install splice case on strand2020EA
3020Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building30,00025,000FT
3021Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building200100FT
3022Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides200200FT
3023Deinstall cable in conduits1,000,0001,000,000FT
3024Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)10,0006,000FT
3025Install outside pull-box (Various sizes)10040EA
3026Provide CFM & Install pulling wire in ducts1,000,0001,000,000FT
3027ESTIMATED COST FOR WAR HAZARD LOSSES

4th Option Period

ATTACHMENT 2 - SCHEDULE OF SERVICES

Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide

4th Option Period: 1 July 2027 - 30 June 2028
CLINSupply & Services /DescriptionMax Qty for Each OYQtyUnitUnit PriceAmount
4001Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable100,00040,000FT
4002Install ground rod to include grounding of cable/terminal100100EA
4003Install Protected Entrance Terminal (PET) housing for copper cable5050EA
4004Install Splice case for copper cable5050EA
4005Provide CFM & install ¾-inch, fire-retardant plywood backboard4040EA
4006Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores)300,000160,000FT
4007Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores)1,000,000800,000FT
4008Install fiber optic termination panel (wall mount or rack)100100EA
4009Installation of fiber optic cable splice enclosure kit (12 to 144 cores)100100EA
4010Provide CFM & Install
Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present5,0005,000FT
4011Provide CFM & Install
Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit20,00020,000FT
4012Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct10,00010,000FT
4013Core drill 1/2 inch to 4 inch hole1,0001,000EA
4014Provide CFM & Install 2 to 4 inch building entrance conduit10050EA
4015Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation3025EA
4016Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation105EA
4017Provide CFM & Install strand and guy wires for aerial cable50,00050,000FT
4018Install cable on guy wires for aerial to include splicing, termination and testing of cable.65,00065,000FT
4019Install splice case on strand2020EA
4020Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building30,00025,000FT
4021Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building200100FT
4022Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides200200FT
4023Deinstall cable in conduits1,000,0001,000,000FT
4024Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green)10,0006,000FT
4025Install outside pull-box (Various sizes)10040EA
4026Provide CFM & Install pulling wire in ducts1,000,0001,000,000FT
4027ESTIMATED COST FOR WAR HAZARD LOSSES