B.01.01_ATTACHMENT 2 - Schedule of Services (CLINs).xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Telecommunications Infrastructure Support Services, USFK-Wide Federal contract opportunity
- Solicitation number
- W91QVN-23-R-0064
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.01_ATTACHMENT 3 - PWS, EXHIBITS_W91QVN23R0064.pdf | ||
| B.01.01_ATTACHMENT 1 - Past Performance Questionnaire (PPQ).pdf | ||
| B.01.01_Released_W91QVN23R0064.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| Base Period: 1 July 2023 - 30 June 2024 | |||||||
| CLIN | Supply & Services /Description | Max Qty for Each OY | Qty | Unit | Unit Price | Amount | |
| 0001 | Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable | 100,000 | 40,000 | FT | |||
| 0002 | Install ground rod to include grounding of cable/terminal | 100 | 100 | EA | |||
| 0003 | Install Protected Entrance Terminal (PET) housing for copper cable | 50 | 50 | EA | |||
| 0004 | Install Splice case for copper cable | 50 | 50 | EA | |||
| 0005 | Provide CFM & install ¾-inch, fire-retardant plywood backboard | 40 | 40 | EA | |||
| 0006 | Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores) | 300,000 | 160,000 | FT | |||
| 0007 | Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores) | 1,000,000 | 800,000 | FT | |||
| 0008 | Install fiber optic termination panel (wall mount or rack) | 100 | 100 | EA | |||
| 0009 | Installation of fiber optic cable splice enclosure kit (12 to 144 cores) | 100 | 100 | EA | |||
| 0010 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present | 5,000 | 5,000 | FT | ||||
| 0011 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit | 20,000 | 20,000 | FT | ||||
| 0012 | Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct | 10,000 | 10,000 | FT | |||
| 0013 | Core drill 1/2 inch to 4 inch hole | 1,000 | 1,000 | EA | |||
| 0014 | Provide CFM & Install 2 to 4 inch building entrance conduit | 100 | 50 | EA | |||
| 0015 | Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 30 | 25 | EA | |||
| 0016 | Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 10 | 5 | EA | |||
| 0017 | Provide CFM & Install strand and guy wires for aerial cable | 50,000 | 50,000 | FT | |||
| 0018 | Install cable on guy wires for aerial to include splicing, termination and testing of cable. | 65,000 | 65,000 | FT | |||
| 0019 | Install splice case on strand | 20 | 20 | EA | |||
| 0020 | Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building | 30,000 | 25,000 | FT | |||
| 0021 | Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building | 200 | 100 | FT | |||
| 0022 | Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides | 200 | 200 | FT | |||
| 0023 | Deinstall cable in conduits | 1,000,000 | 1,000,000 | FT | |||
| 0024 | Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green) | 10,000 | 6,000 | FT | |||
| 0025 | Install outside pull-box (Various sizes) | 100 | 40 | EA | |||
| 0026 | Provide CFM & Install pulling wire in ducts | 1,000,000 | 1,000,000 | FT | |||
| 0027 | ESTIMATED COST FOR WAR HAZARD LOSSES |
Estimated Cost for War Hazard Losses is Zero ($0.00).
1st Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 1st Option Period: 1 July 2024 - 30 June 2025 | |||||||
| CLIN | Supply & Services /Description | Max Qty for Each OY | Qty | Unit | Unit Price | Amount | |
| 1001 | Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable | 100,000 | 40,000 | FT | |||
| 1002 | Install ground rod to include grounding of cable/terminal | 100 | 100 | EA | |||
| 1003 | Install Protected Entrance Terminal (PET) housing for copper cable | 50 | 50 | EA | |||
| 1004 | Install Splice case for copper cable | 50 | 50 | EA | |||
| 1005 | Provide CFM & install ¾-inch, fire-retardant plywood backboard | 40 | 40 | EA | |||
| 1006 | Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores) | 300,000 | 160,000 | FT | |||
| 1007 | Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores) | 1,000,000 | 800,000 | FT | |||
| 1008 | Install fiber optic termination panel (wall mount or rack) | 100 | 100 | EA | |||
| 1009 | Installation of fiber optic cable splice enclosure kit (12 to 144 cores) | 100 | 100 | EA | |||
| 1010 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present | 5,000 | 5,000 | FT | ||||
| 1011 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit | 20,000 | 20,000 | FT | ||||
| 1012 | Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct | 10,000 | 10,000 | FT | |||
| 1013 | Core drill 1/2 inch to 4 inch hole | 1,000 | 1,000 | EA | |||
| 1014 | Provide CFM & Install 2 to 4 inch building entrance conduit | 100 | 50 | EA | |||
| 1015 | Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 30 | 25 | EA | |||
| 1016 | Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 10 | 5 | EA | |||
| 1017 | Provide CFM & Install strand and guy wires for aerial cable | 50,000 | 50,000 | FT | |||
| 1018 | Install cable on guy wires for aerial to include splicing, termination and testing of cable. | 65,000 | 65,000 | FT | |||
| 1019 | Install splice case on strand | 20 | 20 | EA | |||
| 1020 | Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building | 30,000 | 25,000 | FT | |||
| 1021 | Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building | 200 | 100 | FT | |||
| 1022 | Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides | 200 | 200 | FT | |||
| 1023 | Deinstall cable in conduits | 1,000,000 | 1,000,000 | FT | |||
| 1024 | Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green) | 10,000 | 6,000 | FT | |||
| 1025 | Install outside pull-box (Various sizes) | 100 | 40 | EA | |||
| 1026 | Provide CFM & Install pulling wire in ducts | 1,000,000 | 1,000,000 | FT | |||
| 1027 | ESTIMATED COST FOR WAR HAZARD LOSSES |
2nd Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 2nd Option Period: 1 July 2025 - 30 June 2026 | |||||||
| CLIN | Supply & Services /Description | Max Qty for Each OY | Qty | Unit | Unit Price | Amount | |
| 2001 | Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable | 100,000 | 40,000 | FT | |||
| 2002 | Install ground rod to include grounding of cable/terminal | 100 | 100 | EA | |||
| 2003 | Install Protected Entrance Terminal (PET) housing for copper cable | 50 | 50 | EA | |||
| 2004 | Install Splice case for copper cable | 50 | 50 | EA | |||
| 2005 | Provide CFM & install ¾-inch, fire-retardant plywood backboard | 40 | 40 | EA | |||
| 2006 | Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores) | 300,000 | 160,000 | FT | |||
| 2007 | Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores) | 1,000,000 | 800,000 | FT | |||
| 2008 | Install fiber optic termination panel (wall mount or rack) | 100 | 100 | EA | |||
| 2009 | Installation of fiber optic cable splice enclosure kit (12 to 144 cores) | 100 | 100 | EA | |||
| 2010 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present | 5,000 | 5,000 | FT | ||||
| 2011 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit | 20,000 | 20,000 | FT | ||||
| 2012 | Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct | 10,000 | 10,000 | FT | |||
| 2013 | Core drill 1/2 inch to 4 inch hole | 1,000 | 1,000 | EA | |||
| 2014 | Provide CFM & Install 2 to 4 inch building entrance conduit | 100 | 50 | EA | |||
| 2015 | Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 30 | 25 | EA | |||
| 2016 | Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 10 | 5 | EA | |||
| 2017 | Provide CFM & Install strand and guy wires for aerial cable | 50,000 | 50,000 | FT | |||
| 2018 | Install cable on guy wires for aerial to include splicing, termination and testing of cable. | 65,000 | 65,000 | FT | |||
| 2019 | Install splice case on strand | 20 | 20 | EA | |||
| 2020 | Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building | 30,000 | 25,000 | FT | |||
| 2021 | Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building | 200 | 100 | FT | |||
| 2022 | Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides | 200 | 200 | FT | |||
| 2023 | Deinstall cable in conduits | 1,000,000 | 1,000,000 | FT | |||
| 2024 | Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green) | 10,000 | 6,000 | FT | |||
| 2025 | Install outside pull-box (Various sizes) | 100 | 40 | EA | |||
| 2026 | Provide CFM & Install pulling wire in ducts | 1,000,000 | 1,000,000 | FT | |||
| 2027 | ESTIMATED COST FOR WAR HAZARD LOSSES |
3rd Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 3rd Option Period: 1 July 2026 - 30 June 2027 | |||||||
| CLIN | Supply & Services /Description | Max Qty for Each OY | Qty | Unit | Unit Price | Amount | |
| 3001 | Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable | 100,000 | 40,000 | FT | |||
| 3002 | Install ground rod to include grounding of cable/terminal | 100 | 100 | EA | |||
| 3003 | Install Protected Entrance Terminal (PET) housing for copper cable | 50 | 50 | EA | |||
| 3004 | Install Splice case for copper cable | 50 | 50 | EA | |||
| 3005 | Provide CFM & install ¾-inch, fire-retardant plywood backboard | 40 | 40 | EA | |||
| 3006 | Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores) | 300,000 | 160,000 | FT | |||
| 3007 | Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores) | 1,000,000 | 800,000 | FT | |||
| 3008 | Install fiber optic termination panel (wall mount or rack) | 100 | 100 | EA | |||
| 3009 | Installation of fiber optic cable splice enclosure kit (12 to 144 cores) | 100 | 100 | EA | |||
| 3010 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present | 5,000 | 5,000 | FT | ||||
| 3011 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit | 20,000 | 20,000 | FT | ||||
| 3012 | Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct | 10,000 | 10,000 | FT | |||
| 3013 | Core drill 1/2 inch to 4 inch hole | 1,000 | 1,000 | EA | |||
| 3014 | Provide CFM & Install 2 to 4 inch building entrance conduit | 100 | 50 | EA | |||
| 3015 | Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 30 | 25 | EA | |||
| 3016 | Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 10 | 5 | EA | |||
| 3017 | Provide CFM & Install strand and guy wires for aerial cable | 50,000 | 50,000 | FT | |||
| 3018 | Install cable on guy wires for aerial to include splicing, termination and testing of cable. | 65,000 | 65,000 | FT | |||
| 3019 | Install splice case on strand | 20 | 20 | EA | |||
| 3020 | Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building | 30,000 | 25,000 | FT | |||
| 3021 | Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building | 200 | 100 | FT | |||
| 3022 | Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides | 200 | 200 | FT | |||
| 3023 | Deinstall cable in conduits | 1,000,000 | 1,000,000 | FT | |||
| 3024 | Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green) | 10,000 | 6,000 | FT | |||
| 3025 | Install outside pull-box (Various sizes) | 100 | 40 | EA | |||
| 3026 | Provide CFM & Install pulling wire in ducts | 1,000,000 | 1,000,000 | FT | |||
| 3027 | ESTIMATED COST FOR WAR HAZARD LOSSES |
4th Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-23-R-0064 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 4th Option Period: 1 July 2027 - 30 June 2028 | |||||||
| CLIN | Supply & Services /Description | Max Qty for Each OY | Qty | Unit | Unit Price | Amount | |
| 4001 | Install, splice, terminate and test (25 Pr to 1200 Pr) copper cable | 100,000 | 40,000 | FT | |||
| 4002 | Install ground rod to include grounding of cable/terminal | 100 | 100 | EA | |||
| 4003 | Install Protected Entrance Terminal (PET) housing for copper cable | 50 | 50 | EA | |||
| 4004 | Install Splice case for copper cable | 50 | 50 | EA | |||
| 4005 | Provide CFM & install ¾-inch, fire-retardant plywood backboard | 40 | 40 | EA | |||
| 4006 | Install, terminate, splice and test fiber optic cable in duct (2 to 144 fiber cores) | 300,000 | 160,000 | FT | |||
| 4007 | Install, terminate, splice and test LEAF fiber optic cable in duct. (12 to 96 Fiber Cores) | 1,000,000 | 800,000 | FT | |||
| 4008 | Install fiber optic termination panel (wall mount or rack) | 100 | 100 | EA | |||
| 4009 | Installation of fiber optic cable splice enclosure kit (12 to 144 cores) | 100 | 100 | EA | |||
| 4010 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, restoration of paved and concrete surfaces, concrete encasing, spacers, markers and warning tape(paved area). Provide CFM & Install 4" (1 to 4 ducts) Encased Buried (EB)-20 conduit where vehicular traffic (i.e., automotive, railway) is present | 5,000 | 5,000 | FT | ||||
| 4011 | Provide CFM & Install | ||||||
| Duct installation to include excavation, backfill, markers and warning tape. CFM Install 4" (1 to 4 ducts) Rigid Nonmetallic Conduit Schedule 40 PVC conduit | 20,000 | 20,000 | FT | ||||
| 4012 | Install Sub-duct/Innerduct/Multi-duct/Fabricmesh Innerduct | 10,000 | 10,000 | FT | |||
| 4013 | Core drill 1/2 inch to 4 inch hole | 1,000 | 1,000 | EA | |||
| 4014 | Provide CFM & Install 2 to 4 inch building entrance conduit | 100 | 50 | EA | |||
| 4015 | Provide CFM & Install Multidirectional 1220mm by 1220mm by 1220mm Handhole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 30 | 25 | EA | |||
| 4016 | Provide CFM & Install Multidirectional W1850mm by L3700mm by H2150mm Maintenance hole to include excavation, restoration, backfill, plugging ducts, all hardware and grounding installation | 10 | 5 | EA | |||
| 4017 | Provide CFM & Install strand and guy wires for aerial cable | 50,000 | 50,000 | FT | |||
| 4018 | Install cable on guy wires for aerial to include splicing, termination and testing of cable. | 65,000 | 65,000 | FT | |||
| 4019 | Install splice case on strand | 20 | 20 | EA | |||
| 4020 | Installation of 1/2-inch to 2-inch Electrical Metallic Tubing (EMT) conduit inside a building | 30,000 | 25,000 | FT | |||
| 4021 | Provide CFM & Installation of Galvanized (GIP) 4-inch conduit with couplings inside of building | 200 | 100 | FT | |||
| 4022 | Provide CFM & Install Galvanized (GIP) 4-inch conduit with couplings buried at a minimum of 1 meter below the surface, encased within a minimum of 20cm of concrete on all sides | 200 | 200 | FT | |||
| 4023 | Deinstall cable in conduits | 1,000,000 | 1,000,000 | FT | |||
| 4024 | Provide CFM & Install Combined Innerduct System (CIS); CIS Type 25mm x 4ea, 25A (Black/Yellow/Red/Green) | 10,000 | 6,000 | FT | |||
| 4025 | Install outside pull-box (Various sizes) | 100 | 40 | EA | |||
| 4026 | Provide CFM & Install pulling wire in ducts | 1,000,000 | 1,000,000 | FT | |||
| 4027 | ESTIMATED COST FOR WAR HAZARD LOSSES |