DOCUMENT NUMBER SOLICITATION NUMBER

W50S6L21Q0006 (Not Set)

CLAUSES INCORPORATED BY REFERENCE

CLAUSE

NO

ALT NO/

DEV NO

CLAUSE TITLE YEAR-

MO

SECTION

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09 SEC I

252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 SEC I

252.203-7005 Representation Relating to Compensation of Former DoD Officials.

2011-11 SEC K

252.204-7003 Control of Government Personnel Work Product. 1992-04 SEC I 252.204-7006 Billing Instructions. 2005-10 SEC G

252.204-7008 Compliance with Safeguarding Covered Defense Information Controls.

2016-10 SEC L

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

2019-12 SEC I

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support.

2016-05 SEC I

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2021-01 SEC I

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

2019-05 SEC I

252.215-7007 Notice of Intent to Resolicit. 2012-06 SEC L

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

2018-01 SEC L

252.219-7000 Advancing Small Business Growth 2016-09 SEC K

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.

2014-09 SEC I

252.225-7001 Buy American and Balance of Payments Program. 2017-12 SEC I 252.225-7002 Qualifying Country Sources as Subcontractors. 2017-12 SEC I 252.225-7048 Export-Controlled Items. 2013-06 SEC I

252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.

2019-04 SEC I

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12 SEC G

252.232-7010 Levies on Contract Payments. 2006-12 SEC I

252.232-7017 Accelerating Payments to Small Business Subcontractors- Prohibition on Fees and Consideration.

2020-04 SEC I

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.

2013-06 SEC I

252.243-7001 Pricing of Contract Modifications. 1991-12 SEC I 252.243-7002 Requests for Equitable Adjustment. 2012-12 SEC I 252.244-7000 Subcontracts for Commercial Items. 2020-10 SEC I

52.203-18 Prohibition on Contracting with Entities that Require Certain

Internal Confidentiality Agreements or Statements- Representation.

2017-01 SEC L

52.204-16 Commercial and Government Entity Code Reporting. 2020-08 SEC L 52.204-18 Commercial and Government Entity Code Maintenance. 2020-08 SEC I 52.204-7 System for Award Management. 2018-10 SEC K 52.212-4 Contract Terms and Conditions-Commercial Items. 2018-10 SEC I 52.217-2 Cancellation Under Multi-year Contracts. 1997-10 SEC I

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2013-12 SEC I

Protection of Government Buildings, Equipment, and

52.237-2 Vegetation. 1984-04 SEC I 52.212-1 Instructions to Offerors-Commercial Items. 2020-06 SEC L

252.239-7001 Information Assurance Contractor Training and Certification. 2008-01 SEC I 52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 SEC I 52.237-3 Continuity of Services. 1991-01 SEC I

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

2018-07 SEC I

52.246-4 Inspection of Services-Fixed-Price. 1996-08 SEC E

52.219-6 DEV 2020-O0008 Notice of Total Small Business Set-Aside (DEVIATION 2020- O0008) (Revision 2)

2020-10 SEC I

52.215-2 ALT I Audit and Records-Negotiation. (Alternate I) 2009-03 SEC I

52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009.

2010-06 SEC I

52.214-26 ALT I Audit and Records-Sealed Bidding. (Alternate I) 2009-03 SEC I

252.239-7098 DEV 2021-O0003

Prohibition on Contracting to Maintain or Establish a Computer Network Unless Such Network is Designed to Block Access to Certain Websites - Representation (Deviation 2021-

O0003)

2021-04 SEC L

CLAUSES IN FULL TEXT

CLAUSE

NO

ALT NO/

DEV NO

CLAUSE TITLE YEAR-

MO

CLAUSE TEXT

52.204-22 Alternative Line Item Proposal. 2017-01

As prescribed in , insert the following provision:4.1008

Alternative Line Item Proposal (JAN 2017)

The Government recognizes that the line items established in this solicitation may not conform (a) to the Offeror’s practices. Failure to correct these issues can result in difficulties in acceptance of deliverables and processing payments. Therefore, the Offeror is invited to propose alternative line items for which bids, proposals, or quotes are requested in this solicitation to ensure that the resulting contract is economically and administratively advantageous to the Government and the Offeror.

The Offeror may submit one or more additional proposals with alternative line items, provided (b) that alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation.

However, acceptance of an alternative proposal is a unilateral decision made solely at the discretion of the Government. Offers that do not comply with the line items specified in this solicitation may be determined to be nonresponsive or unacceptable.

(End of provision)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

2020-08

As prescribed in , insert the following clause:4.2105(b)

Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020)

As used in this clause-(a) Definitions.

means intermediate links between the core network, or backbone network, and the small Backhaul subnetworks at the edge of the network ( , connecting cell phones/towers to the core telephone e.g.

network). Backhaul can be wireless (e.g., microwave) or wired ( , fiber optic, coaxial cable, Ethernet).e.g.

means The People’s Republic of China.Covered foreign country means–Covered telecommunications equipment or services

Telecommunications equipment produced by Huawei Technologies Company or ZTE (1) Corporation (or any subsidiary or affiliate of such entities);

For the purpose of public safety, security of Government facilities, physical security (2) surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

Telecommunications or video surveillance services provided by such entities or using such (3) equipment; or

Telecommunications or video surveillance equipment or services produced or provided by (4) an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

means–Critical technology

Defense articles or defense services included on the United States Munitions List set forth (1) in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of (2) the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-

Pursuant to multilateral regimes, including for reasons relating to national security, (i) chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

For reasons relating to regional stability or surreptitious listening;(ii)

Specially designed and prepared nuclear equipment, parts and components, materials, (3) software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal (4) Regulations (relating to export and import of nuclear equipment and material);

Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part (5) 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

Emerging and foundational technologies controlled pursuant to section 1758 of the Export (6) Control Reform Act of 2018 (50 U.S.C. 4817).

means arrangements governing the physical connection of two or Interconnection arrangements more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.

, connection of a customer of telephone provider A to a customer of telephone company B) or sharing g.

data and other information resources.

means an inquiry designed to uncover any information in the entity's Reasonable inquiry possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.

means cellular communications services ( , voice, video, data) received from a visited Roaming e.g.

network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

means any component necessary for the proper function or Substantial or essential component performance of a piece of equipment, system, or service.

. (b) Prohibition Section 889(a)(1)(A) of the John S. McCain National Defense Authorization (1) Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in

FAR 4.2104.

Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal (2) Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.

This clause does not prohibit contractors from providing-(c) Exceptions.

A service that connects to the facilities of a third-party, such as backhaul, roaming, or (1) interconnection arrangements; or

Telecommunications equipment that cannot route or redirect user data traffic or permit (2) visibility into any user data or packets that such equipment transmits or otherwise handles.

Reporting requirement. (d) In the event the Contractor identifies covered telecommunications (1) equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

The Contractor shall report the following information pursuant to paragraph (d)(1) of this (2) clause

Within one business day from the date of such identification or notification: the contract (i) number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known);

supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description;

and any readily available information about mitigation actions undertaken or recommended.

Within 10 business days of submitting the information in paragraph (d)(2)(i) of this (ii) clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

The Contractor shall insert the substance of this clause, including this paragraph (e) Subcontracts.

(e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.

(End of clause)

52.225-22 ALT I

Notice of Required Use of American Iron, Steel, and

Manufactured Goods-Buy American Statute-Construction Materials. - (Alternate I)

2014-05

As prescribed in , insert the following provision:25.1102(e)

Notice of Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute- Construction Materials (Jan 2021)

. "Construction material," "domestic construction material," "foreign construction (a) Definitions material," "manufacturedconstructionmaterial," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Manufactured Goods-Buy American statute-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).

. An offeror requesting a determination (b) Requests for determinations of inapplicability regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The Offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.

Evaluation of offers. (c) If the Government determines that an exception based on unreasonable (1) cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract-

25 percent of the offered price of the contract, if foreign manufactured construction (i) material is incorporated in the offer based on an exception for unreasonable cost of comparable manufactured domestic construction material; and

20 percent of the cost of foreign unmanufactured construction material included in the (ii) offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.

If the solicitation specifies award on the basis of factors in addition to cost or price, the (2) Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated price in determining the offer that represents the best value to the Government.

Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, (3) the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the Offeror on the basis of unreasonable cost of comparable domestic construction material.

Alternate offers. (d) When an offer includes foreign construction material not listed by the (1) Government in this solicitation in paragraph (b)(3) of the clause at FAR 52.225-21, the Offeror also may submit an alternate offer based on use of equivalent domestic construction material.

If an alternate offer is submitted, the Offeror shall submit a separate Standard Form 1442 (2) for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

If the Government determines that a particular exception requested in accordance with (3) paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the Offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or(i)

May be accepted if revised during negotiations.(ii)

(End of Provision)

. As prescribed in 25.1102(e), substitute the following paragraph (b) for Alternate I ( 2014)May paragraph (b) of the basic provision:

(b) . An offeror requesting a determination regarding the Requests for determinations of inapplicability inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21.

52.225-23 ALT I

Required Use of American Iron, Steel, and Manufactured

Goods-Buy American Statute-Construction Materials under Trade Agreements. - (Alternate I)

2014-05

As prescribed in , insert the following clause:25.1102(e)

Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials under Trade Agreements (Jan 2021)

. As used in this clause-(a) Definitions means an article, material, or supply incorporated directly into a construction material.Component means an article, material, or supply brought to the construction site by the Construction material Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency lifes afety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

means any of the following countries:Designated country

A World Trade Organization Government Procurement Agreement (WTO GPA) country (1) (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, (2) Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina (3) Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, (4) Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

means a construction material that is a WTO GPA Designated country construction material country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

means the following:Domestic construction material

An unmanufactured construction material mined or produced in the United States. (The (1) Buy American statute applies.)

A manufactured construction material that is manufactured in the United States and, if the (2) construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States. (Section 1605 of the Recovery Act applies.)

means a construction material other than a domestic construction Foreign construction material material.

means a construction material that-Free trade agreement (FTA) country construction material

Is wholly the growth, product, or manufacture of an FTA country; or(1)

In the case of a construction material that consists in whole or in part of materials from (2) another country, has been substantially transformed in an FTA country into a new and different construction material distinct from the materials from which it was transformed.

means a construction material that-Least developed country construction material

Is wholly the growth, product, or manufacture of a least developed country; or(1)

In the case of a construction material that consists in whole or in part of materials from (2) another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

means any construction material that is not unmanufactured Manufactured construction material construction material.

means a country other than the United States or a designated country.Nondesignated country means any of the following countries:Recovery Act designated country

A World Trade Organization Government Procurement Agreement (WTO GPA) country (1) (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

A Free Trade Agreement country (FTA) (Australia, Bahrain, Canada, Chile, Colombia, (2) Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore); or

A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina (3) Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).

means a construction material that is a Recovery Act designated country construction material WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.

means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and Steel may include other elements.

means the 50 States, the District of Columbia, and outlying areas.United States means raw material brought to the construction site for Unmanufactured construction material incorporation into the building or work that has not been-

Processed into a specific form and shape; or(1)

Combined with other raw material to create a material that has different properties than the (2) properties of the individual raw materials.

means a construction material that-WTO GPA country construction material

Is wholly the growth, product, or manufacture of a WTO GPA country; or(1)

In the case of a construction material that consists in whole or in part of materials from (2) another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials. The restrictions of section 1605 of the American Recovery and (1) Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements-

Section 1605 of the Recovery Act by requiring, unless an exception applies, that all (i) manufactured construction material in the project is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives); and.

The Buy American statute by providing a preference for unmanufactured construction (ii) material mined or produced in the United States over unmanufactured construction material mined or produced in a nondesignated country.

The Contractor shall use only domestic construction material, Recovery Act designated (2) country manufactured construction material, or designated country unmanufactured construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

The requirement in paragraph (b)(2) of this clause does not apply to the construction (3) materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate "none".]____

The Contracting Officer may add other construction material to the list in paragraph (b)(3) (4) of this clause if the Government determines that-

The cost of domestic construction material would be unreasonable;(i)

The cost of domestic manufactured construction material is unreasonable when the (A) cumulative cost of such material, when compared to the cost of comparable foreign manufactured construction material, other than Recovery Act designated country construction material, will increase the overall cost of the contract by more than 25 percent;

The cost of domestic unmanufactured construction material is unreasonable when (B) the cost of such material exceeds the cost of comparable foreign unmanufactured construction material, other than designated country construction material, by more than 20 percent;

The construction material is not mined, produced, or manufactured in the United States (ii) in sufficient and reasonably available commercial quantities of a satisfactory quality; or

The application of the restriction of section 1605 of the Recovery Act to a particular (iii) manufactured construction material would be inconsistent with the public interest or the application of the Buy American statute to a particular unmanufactured construction material would be impracticable or inconsistent with the public interest.

(c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy .American statute

(1) Any Contractor request to use foreign construction material in accordance with paragraph (i) (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-

A description of the foreign and domestic construction materials;(A)

Unit of measure;(B)

Quantity;(C)

Cost;(D)

Time of delivery or availability;(E)

Location of the construction project;(F)

Name and address of the proposed supplier; and(G)

A detailed justification of the reason for use of foreign construction materials cited (H) in accordance with paragraph (b)(4) of this clause.

A request based on unreasonable cost shall include a reasonable survey of the market (ii) and a completed cost comparison table in the format in paragraph (d) of this clause.

The cost of construction material shall include all delivery costs to the construction site (iii) and any applicable duty.

Any Contractor request for a determination submitted after contract award shall explain (iv) why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

If the Government determines after contract award that an exception to section 1605 of the (2) Recovery Act or the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

Unless the Government determines that an exception to section 1605 of the Recovery Act (3) or the Buy American statute applies, use of foreign construction material other than manufactured construction material from a Recovery Act designated country or unmanufactured construction material from a designated country is noncompliant with the applicable statute.

. To permit evaluation of requests under paragraph (c) of this clause based on (d) Data unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign (Nondesignated Country) and Domestic Construction Materials Cost Comparison

Construction Material Description Unit of Measure Quantity Cost (Dollars)*

:Item 1

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

:Item 2

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

[ List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response;

]if oral, attach summary.

[ .]Include other applicable supporting information

[* .]Include all delivery costs to the construction site

(End of clause)

. As prescribed in 25.1102(e), add the following definition of "Bahrainian, Alternate I ( 2014)May Mexican, or Omani construction material" to paragraph (a) of the basic clause, and substitute the following paragraphs (b)(1) and (b)(2) for paragraphs (b)(1) and (b)(2) of the basic clause:

means a construction material that-Bahrainian, Mexican, or Omani construction material

Is wholly the growth, product, or manufacture of Bahrain, Mexico, or Oman; or(1)

In the case of a construction material that consists in whole or in part of materials from (2) another country, has been substantially transformed in Bahrain, Mexico, or Oman into a new and different construction material distinct from the materials from which it was transformed.

(b) (1) The restrictions of section 1605 of the American Recovery and Construction materials.

Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements-

(i) Section 1605 of the Recovery Act, by requiring, unless an exception applies, that all manufactured construction material in the project is manufactured in the United States and, if the construction material consists wholly or predominantly of iron or steel, the iron or steel was produced in the United States (produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives); and

(ii) The Buy American statute by providing a preference for unmanufactured construction material mined or produced in the United States over unmanufactured construction material mined or produced in a nondesignated country.

(2) The Contractor shall use only domestic construction material, Recovery Act designated country manufactured construction material, or designated country unmanufactured construction material, other than Bahrainian, Mexican, or Omani construction material, in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

52.225-22 Notice of Required Use of American Iron, Steel, and

Manufactured Goods-Buy American Statute-Construction Materials.

2021-01

As prescribed in , insert the following provision:25.1102(e)

Notice of Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute- Construction Materials (Jan 2021)

. "Construction material," "domestic construction material," "foreign construction (a) Definitions material," "manufacturedconstructionmaterial," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Manufactured Goods-Buy American statute-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).

. An offeror requesting a determination (b) Requests for determinations of inapplicability regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The Offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.

Evaluation of offers. (c) If the Government determines that an exception based on unreasonable (1) cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract-

25 percent of the offered price of the contract, if foreign manufactured construction (i) material is incorporated in the offer based on an exception for unreasonable cost of comparable manufactured domestic construction material; and

20 percent of the cost of foreign unmanufactured construction material included in the (ii) offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.

If the solicitation specifies award on the basis of factors in addition to cost or price, the (2) Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated price in determining the offer that represents the best value to the Government.

Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, (3) the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the Offeror on the basis of unreasonable cost of comparable domestic construction material.

Alternate offers. (d) When an offer includes foreign construction material not listed by the (1) Government in this solicitation in paragraph (b)(3) of the clause at FAR 52.225-21, the Offeror also may submit an alternate offer based on use of equivalent domestic construction material.

If an alternate offer is submitted, the Offeror shall submit a separate Standard Form 1442 (2) for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

If the Government determines that a particular exception requested in accordance with (3) paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the Offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or(i)

May be accepted if revised during negotiations.(ii)

(End of Provision)

252.204-7017 Prohibition on the Acquisition of Covered Defense

Telecommunications Equipment or Services-Representation.

2021-05

As prescribed in 204.2105(b), use the following provision:

PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS

EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)

The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it “does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.â€

(a) . “Covered defense telecommunications equipment or services,†“covered Definitions mission,†“critical technology,†and “substantial or essential component,†as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.

(b) . Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 Prohibition (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

(c) . The Offeror shall review the list of excluded parties in the System for Award Procedures Management (SAM) at for entities that are excluded when providing any https://www.sam.gov equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.

(d) . If in its annual representations and certifications in SAM the Offeror has Representation represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it “does†provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:

The Offeror represents that it will will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.

(e) . If the Offeror has represented in paragraph (d) of this provision that it “will Disclosures provide covered defense telecommunications equipment or services,†the Offeror shall provide the following information as part of the offer:

(1) A description of all covered defense telecommunications equipment and services offered (include brand or manufacturer; product, such as model number, original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable).

(2) An explanation of the proposed use of covered defense telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition referenced in paragraph (b) of this provision.

(3) For services, the entity providing the covered defense telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known).

(4) For equipment, the entity that produced or provided the covered defense telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).

(End of provision)

252.215-7008 Only One Offer. 2019-07

As prescribed at 215.408(3), use the following provision:

ONLY ONE OFFER (JUL 2019)

(a) . After initial submission of offers, if the Contracting Cost or pricing data requirements Officer notifies the Offeror that only one offer was received, the Offeror agrees to-

(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3); and

(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.

(b) . If the Offeror is the Canadian Commercial Corporation, Canadian Commercial Corporation certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian

Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at

FAR 15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.

S. Contracting Officer that the proposed price is fair and reasonable IAW methods in FAR 15.403-3(a)(1) [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3

].(a)(1) with the notification

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(c) . Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall Subcontracts insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

(End of provision)

252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process Electronic invoicing.

vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web- WAWF training.

Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, WAWF methods of document submission.

Electronic Data Interchange, or File Transfer Protocol.

(f) The Contractor shall use the following information when WAWF payment instructions.

submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following Document type.

document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table Document routing.

below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC W50S6L

Admin DoDAAC W50S6L

Inspect By DoDAAC Block 15 of the SF 1449 Form

Ship To Code Block 15 of the SF 1449 Form

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) W50S6L

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation Payment request.

appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving…