B-50173 Question and Answer Document.pdf
PDF 93 KB Posted
- Attached to
- JPMC Mosquito Larvicide
- Solicitation number
- 26-416CMS-BOSS4-B-50173
- Issued by
- Illinois
About this file
This is a Question and Answer document issued by the Illinois Department of Central Management Services regarding Invitation for Bid (IFB) 26-416CMS-BOSS4-B-50173 for JPMC Mosquito Larvicide. The solicitation seeks mosquito larvicide products with the active ingredient Methoprene, available in multiple formulations including briquet, tablet, water-soluble pouch, or approved pre-packaged solid products with residual periods of up to 30 days or up to 150 days. Items 2 and 3 of the IFB are the subject of pricing inquiry clarification.
The document clarifies three key contractual matters: Business Enterprise Program (BEP) subcontractor utilization may meet or exceed the stated goal percentage, no adjustments to pricing outside those specified in the contract are permitted, and all allowable economic adjustments are detailed in Section 2.3 of the contract. Specifically, pricing adjustments are limited to Producer Price Index (PPI) adjustments as outlined in Section 2.3.2 and Governmental Actions adjustments as outlined in Section 2.3.4. No price escalators beyond these stipulated mechanisms are available. The document was issued on January 6, 2026, and addresses questions raised during the pre-bid conference call.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois Department of Central Management Services JPMC Mosquito Larvicide
26-416CMS-BOSS4-B-50173
Questions and Answers - #1
January 6, 2026
Q1 Can BEP subcontractor utilization exceed the goal percentage requested in the solicitation?
A1 BEP subcontractor utilization that either meets or exceeds the goal are both acceptable.
Q2 Do the allowable economic adjustments provide for any type of agency adjustment?
A2 No adjustments outside of those stipulated in the contract are allowable.
Q3 As a follow-up to the question raised during the pre-bid conference call, could you please clarify whether Item(s) #2 and #3 under IFB 26-416CMS-BOSS4-B-50173 (JPMC Mosquito Larvicide)— ACTIVE INGREDIENT:
Methoprene FORMULATION: Briquet, tablet, water-soluble pouch, or approved pre-packaged solid product (up to 30-day residual and up to 150-day residual) include a price escalator, similar to what IL CMS has included in previous bids when agency pricing applies?
A3 All pricing adjustments are detailed in the contract beginning in Section 2.3 – Economic Adjustments.
Allowable adjustments include PPI (see Section 2.3.2) and Governmental Actions (see Section 2.3.4). No other pricing adjustments are allowed.
File details come from the government source that posted it. Updated .