B-3_CLN-1_38KC286501_A01 TGI_c0v0.pdf
PDF 324 KB Posted
- Attached to
- USS SHOUP (DDG-86) FY26 6J2 CNO SIA BUNDLE #3, Chief of Naval Operation Availability Yokosuka Japan
- Solicitation number
- N6264925RA014
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for scaffolding installation and removal on the USS SHOUP (DDG-86), dated 19-NOV-2025. The task involves erecting and removing scaffolding at six specific locations on the ship, including areas around antennas, a pilot house window, and a transverse bulkhead. The scaffolding will support various maintenance activities by the ship's force, such as work on antenna number 5-3A, antenna number 5-3B, antenna number 4-2, and the tactical air navigation antenna.
The Southwest Regional Maintenance Center (SRF-JRMC) will provide supporting services including crane and crane rigging service, safety inspections for employees, and quality assurance inspections. The scaffolding work is to be performed in accordance with referenced standards, including NAVSEA Standard Items and specific scaffolding regulations. The task is associated with Job Control Number (JCN) EXSY-L043, and the work will be coordinated by personnel from Code 231A and Code 333, with a zone manager overseeing the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
19-NOV-2025 1144
20.15.6.0.9333 (July 2025) ICN: 38KC286501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING FOR SHIP’S FORCE WORK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
EXSYL043
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KISHI, YUUTA 231A 3152436411 17-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
KOMATSU, SHUUHEI 231A 3152436786 17-NOV-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSY-L043
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
865A1201
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship’s Force Work; install and remove
1.2 Location of Work:
1.2.1 Between 03 and 04 Level Weather, Frames between 128 and 140, Starboard (Stbd)
1.2.2 Between 03 and 04 Level Weather, Frames between 128 and 140, Port
1.2.3 03 Level Weather, Frames between 128 and 130, Port and Stbd
1.2.4 04 Level Weather, Frames between 130 and 150, Port and Stbd
1.2.5 09 Level Weather, Frames between 167 and 169, Stbd
1.2.6 Pole Mast, Frame 179, Ship’s Center Line
TGI Short Form
19-NOV-2025 1144
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC286501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING FOR SHIP’S FORCE WORK
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
1.3 Identification:
1.3.1 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Maintenance work of antenna number 5-3A will be accomplished by Ship's Force. See Sketch Enclosure-01 for location details.
1.3.2 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.2 Remarks: Maintenance work of antenna number 5-3B will be accomplished by Ship's Force. See Sketch Enclosure-01 for location details.
1.3.3 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.3 Remarks: Preservation work of sloping transverse bulkhead will be accomplished by Ship's Force. See Sketch Enclosure-
01 for location details.
1.3.4 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.4 Remarks: Maintenance work of pilot house window will be accomplished by Ship's Force. See Sketch Enclosure-01 for location details.
1.3.5 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.5 Remarks: Maintenance work of antenna number 4-2 will be accomplished by Ship's Force. See Sketch Enclosure-01 for location details.
1.3.6 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.6 Remarks: Maintenance work of tactical air navigation antenna and aircraft warning light will be accomplished by Ship's
Force. See Sketch Enclosure-01 for location details.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. PROCEDURE:
19-NOV-2025 1144
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC286501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING FOR SHIP’S FORCE WORK
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.1 Erect/hang scaffolding listed in 1.3.1 through 1.3.6 in accordance with Ref. No. 3 and Ref. No. 4.
2.2 Remove scaffolding listed in 1.3.1 through 1.3.6 upon completion of the work in accordance with Ref. Ref. No. 3 and Ref.
No. 4 when requested by Ship’s Force via Code 333.
2.3 Notes:
2.3.1 Planner: Code 231A Y. Kishi, 243-6411
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.3.3 JCN EXSY-L043 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38KC286501S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.3 [C133] QA inspection for (G) symbol(s).
19-NOV-2025 1144
20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC286501 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC2 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING FOR SHIP’S FORCE WORK
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
4 MP PM240-0049,
SURF
AEGIS RADAR SPY ANTENNA
ARRAY SCAFFOLDING
A Y ALL
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38KC286501A01-Sketch.pdf 17-NOV-2025 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC286501 KEY OP: A01
38KC286501A01 SKETCH SHEET 1 OF 2
ENCLOSURE-01
38KC286501A01 SKETCH SHEET 2 OF 2
ENCLOSURE-01