This Planning Memorandum provides detailed scaffolding requirements for the AEGIS Radar SPY Antenna Array Resurfacing Project on CG-52 and DDG-51 class naval ships. The specifications mandate a three-level scaffolding structure with precise configurations, including a minimum 18" clearance from antenna edges, encapsulation with a slanted top to allow water runoff, and specific plank positioning 6" to 11" from the antenna face. For Destroyer ships, the scaffolding top must have metal planks or fire-retardant plywood to protect the array and personnel, while Cruiser ships can use the top access level for protection.

Additional requirements include a minimum 80-square-foot mixing/cleaning room near each array, which must be encapsulated and connected to the scaffolding. For Cruiser ships, a single mixing room can support two adjacent antennas, with top-level access. The scaffolding must be free of contaminants like plaster or cement, and include clean plastic zippered doors at each entrance point. The document provides multiple reference figures detailing scaffolding configurations for different ship types and array locations, with specific measurements and placement guidelines to ensure proper installation and maintenance of the AEGIS Radar arrays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURFACE MAINTENANCE ENGINEERING PLANNING PROGRAM

PLANNING MEMORANDUM

Title: AEGIS RADAR SPY ANTENNA ARRAY SCAFFOLDING

Class: CG-52 & DDG-51 Hull Nr: ALL

Planning Nr: PM 240-0049, SURF

Developed By: D. Wicks

Reviewed By: G. Escobar Date: 9/6/2019

References

Ref Nr: Document No: Title:

Revisions

Rev Nr: Date Revised: Title:

A SPY ARRAY SCAFFOLDING SPEC 25May2018A 9/6/2019

Page 1 of 13 Planning Memo 240-0049

Carlos.Cardona Reviewed

PURPOSE: To provide scaffolding requirements for Antenna Array Resurfacing Project, or cleaning and repairing damaged antenna windows, bolt caps, foundation weather seal.

REQUIREMENT: Scaffolding shall be constructed with 3 levels as shown in Figure 1.

ADDITIONAL REQUIREMENTS FOR RESURFACING PROJECT:

1. Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna as shown in Figure 1.

2. Encapsulation shall be constructed as shown in Figure 1 and 2. Slant on the top for the water to run away from the array face. For Destroyer ships (DDGs), the scaffolding top shall have metal planks or fire retardant treated plywood to protect the array and personnel from any falling objects. As for Cruiser ships (CGs) the top access level can provide the needed protection for the three levels below it.

3. Planks that cross the antenna face shall be from 6” to 11” from the face as shown in Figure 2.

4. Scaffolding shall be free of contaminates such as plaster, stucco, or cement.

5. Scaffolding shall include a minimum of 80 square feet mixing/cleaning room close to each array, area shall be encapsulated and tied into array scaffolding enclosure. For Cruiser ships (CGs), a mixing room can be used to support two adjacent antennas and the access shall be from the top level. See Figure 3 thru Figure 6 for reference.

6. Refer to Figure 7 thru Figure 14 for additional reference.

7. Clean plastic zippered door for each entrance point for each array and each mixing/cleaning room scaffolding.

8. Refer to Industrial Support Services (ISS) for additional requirements of the

Page 2 of 13 Planning Memo 240-0049

PURPOSE: To provide scaffolding requirements for Antenna Array Resurfacing Project, or cleaning and repairing damaged antenna windows, bolt caps, foundation weather seal.

REQUIREMENT: Scaffolding shall be constructed with 3 levels as shown in Figure 1.

ADDITIONAL REQUIREMENTS FOR RESURFACING PROJECT:

1. Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna as shown in Figure 1.

2. Encapsulation shall be constructed as shown in Figure 1 and 2. Slant on the top for the water to run away from the array face. For Destroyer ships (DDGs), the scaffolding top shall have metal planks or fire retardant treated plywood to protect the array and personnel from any falling objects. As for Cruiser ships (CGs) the top access level can provide the needed protection for the three levels below it.

3. Planks that cross the antenna face shall be from 6” to 11” from the face as shown in Figure 2.

4. Scaffolding shall be free of contaminates such as plaster, stucco, or cement.

5. Scaffolding shall include a minimum of 80 square feet mixing/cleaning room close to each array, area shall be encapsulated and tied into array scaffolding enclosure. For Cruiser ships (CGs), a mixing room can be used to support two adjacent antennas and the access shall be from the top level. See Figure 3 thru Figure 6 for reference.

6. Refer to Figure 7 thru Figure 14 for additional reference.

7. Clean plastic zippered door for each entrance point for each array and each mixing/cleaning room scaffolding.

8. Refer to Industrial Support Services (ISS) for additional requirements of the particular project.

Page 3 of 13 Planning Memo 240-0049

FIGURE 1. Array Scaffolding and Encapsulation Requirement

2’- 3’

LEVEL 1

LEVEL 2

LEVEL 3

6’3 – 7’

6’3 – 7’

6’3 MIN

See NOTE 3

Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna.

Frame member

Encapsulation

Page 4 of 13 Planning Memo 240-0049

FIGURE 2. Side view of scaffolding and encapsulation

ENCAPSULATION

LEVEL 2

LEVEL 1

LEVEL 3

PLANK SHALL BE 6” – 11”

FROM THE ANTENNA FACE

SEAL THE ENCLOSURE

WITH TAPE

SCAFFOLDING TOP

Page 5 of 13 Planning Memo 240-0049

DRAWINGS AND PICTURES BELOW ARE ONLY FOR REFERENCE

FIGURE 3. For CG Ship, Side view of T03 Scaffolding and Mixing Room on the Aft Deck house

5'-0"

10'-0"

8'-0"

11'-4"

5'-0"

6'-6"

2'-0"

6'-6"

1'-0"

6'-6"

12'-4"

LEVEL 2

LEVEL 1

ARRAY FACE (T03)

CG SHIP

MIXING R00M

LEVEL 3

PLASTIC ENCAPSULATE

ALL AROUND

SLANT ON TOP

ZIPPER DOOR

Page 6 of 13 Planning Memo 240-0049

FIGURE 4. For CG Ship, Mixing Room in the AFT Deck house.

3'-0"

11'-4"

5'-0"

17'-2"

8'-0"

18'-0"

5'-0"

AFT DECK HOUSE

ROOM

ELEV VIEW

ZIPPER DOOR TO

ARRAY T03

PLASTIC ENCAPSULATION

ZIPPER DOOR TO

MIXING ROOM

PORT ARRAY

MIXING

ANTENNA

06 LEVEL

T03

PLAN VIEW

DISK

ZIPPER DOOR TO

ARRAY T03

ZIPPER DOOR TO ARRAY

A04 (AFT)

T04 AFT ARRAY

Page 7 of 13 Planning Memo 240-0049

FIGURE 5. For CG Ship, T04 and Mixing Room Scaffolding in the AFT Deck house.

ROOM

3'-0"

10'-0"

8'-0"

11'-4"

1'-0"

6'-6"

2'-0"

6'-6"

6'-6"

12'-4"

5'-0"

CG SHIP

PLASTIC ENCAPSULATE

ALL AROUND

SLANT ON TOP

LEVEL 1

ARRAY FACE (T04)

MIXING

LEVEL 3

ZIPPER DOOR

LEVEL 2

Page 8 of 13 Planning Memo 240-0049

FIGURE 6. For CG Ship, Front view of T04 AFT Array Scaffolding

6'-6"

6'-6"

17'-5"

12'-4"

LEVEL 3

6'-6"

ARRAY FACE

TO4LEVEL 2

ZIPPER DOOR

ALL AROUND

LEVEL 1

(SHIP LEVEL 06)

PLASTIC ENCAPSULATE

(TO MIXING ROOM)

Page 9 of 13 Planning Memo 240-0049

FIGURE 7. Scaffolding of forward arrays on DDG ship.

Page 10 of 13 Planning Memo 240-0049

FIGURE 8. Clearance on the antenna edge FIGURE 9. Scaffolding on level 3

FIGURE 10. Plank clearance of 6” to 11” from the antenna face

Page 11 of 13 Planning Memo 240-0049

FIGURE 11. Three levels of scaffolding FIGURE 12. Access ladders

Page 12 of 13 Planning Memo 240-0049

FIGURE 13. Clearance on the antenna edge FIGURE 14. Three levels of scaffolding

Page 13 of 13 Planning Memo 240-0049

File details come from the government source that posted it. Updated .