B-3 CLN-1 38KC286501-A01 MP PM240-0049 SURF A.pdf
PDF 1 MB Posted
- Attached to
- USS SHOUP (DDG-86) FY26 6J2 CNO SIA BUNDLE #3, Chief of Naval Operation Availability Yokosuka Japan
- Solicitation number
- N6264925RA014
About this file
This Planning Memorandum provides detailed scaffolding requirements for the AEGIS Radar SPY Antenna Array Resurfacing Project on CG-52 and DDG-51 class naval ships. The specifications mandate a three-level scaffolding structure with precise configurations, including a minimum 18" clearance from antenna edges, encapsulation with a slanted top to allow water runoff, and specific plank positioning 6" to 11" from the antenna face. For Destroyer ships, the scaffolding top must have metal planks or fire-retardant plywood to protect the array and personnel, while Cruiser ships can use the top access level for protection.
Additional requirements include a minimum 80-square-foot mixing/cleaning room near each array, which must be encapsulated and connected to the scaffolding. For Cruiser ships, a single mixing room can support two adjacent antennas, with top-level access. The scaffolding must be free of contaminants like plaster or cement, and include clean plastic zippered doors at each entrance point. The document provides multiple reference figures detailing scaffolding configurations for different ship types and array locations, with specific measurements and placement guidelines to ensure proper installation and maintenance of the AEGIS Radar arrays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SURFACE MAINTENANCE ENGINEERING PLANNING PROGRAM
PLANNING MEMORANDUM
Title: AEGIS RADAR SPY ANTENNA ARRAY SCAFFOLDING
Class: CG-52 & DDG-51 Hull Nr: ALL
Planning Nr: PM 240-0049, SURF
Developed By: D. Wicks
Reviewed By: G. Escobar Date: 9/6/2019
References
Ref Nr: Document No: Title:
Revisions
Rev Nr: Date Revised: Title:
A SPY ARRAY SCAFFOLDING SPEC 25May2018A 9/6/2019
Page 1 of 13 Planning Memo 240-0049
Carlos.Cardona Reviewed
PURPOSE: To provide scaffolding requirements for Antenna Array Resurfacing Project, or cleaning and repairing damaged antenna windows, bolt caps, foundation weather seal.
REQUIREMENT: Scaffolding shall be constructed with 3 levels as shown in Figure 1.
ADDITIONAL REQUIREMENTS FOR RESURFACING PROJECT:
1. Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna as shown in Figure 1.
2. Encapsulation shall be constructed as shown in Figure 1 and 2. Slant on the top for the water to run away from the array face. For Destroyer ships (DDGs), the scaffolding top shall have metal planks or fire retardant treated plywood to protect the array and personnel from any falling objects. As for Cruiser ships (CGs) the top access level can provide the needed protection for the three levels below it.
3. Planks that cross the antenna face shall be from 6” to 11” from the face as shown in Figure 2.
4. Scaffolding shall be free of contaminates such as plaster, stucco, or cement.
5. Scaffolding shall include a minimum of 80 square feet mixing/cleaning room close to each array, area shall be encapsulated and tied into array scaffolding enclosure. For Cruiser ships (CGs), a mixing room can be used to support two adjacent antennas and the access shall be from the top level. See Figure 3 thru Figure 6 for reference.
6. Refer to Figure 7 thru Figure 14 for additional reference.
7. Clean plastic zippered door for each entrance point for each array and each mixing/cleaning room scaffolding.
8. Refer to Industrial Support Services (ISS) for additional requirements of the
Page 2 of 13 Planning Memo 240-0049
PURPOSE: To provide scaffolding requirements for Antenna Array Resurfacing Project, or cleaning and repairing damaged antenna windows, bolt caps, foundation weather seal.
REQUIREMENT: Scaffolding shall be constructed with 3 levels as shown in Figure 1.
ADDITIONAL REQUIREMENTS FOR RESURFACING PROJECT:
1. Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna as shown in Figure 1.
2. Encapsulation shall be constructed as shown in Figure 1 and 2. Slant on the top for the water to run away from the array face. For Destroyer ships (DDGs), the scaffolding top shall have metal planks or fire retardant treated plywood to protect the array and personnel from any falling objects. As for Cruiser ships (CGs) the top access level can provide the needed protection for the three levels below it.
3. Planks that cross the antenna face shall be from 6” to 11” from the face as shown in Figure 2.
4. Scaffolding shall be free of contaminates such as plaster, stucco, or cement.
5. Scaffolding shall include a minimum of 80 square feet mixing/cleaning room close to each array, area shall be encapsulated and tied into array scaffolding enclosure. For Cruiser ships (CGs), a mixing room can be used to support two adjacent antennas and the access shall be from the top level. See Figure 3 thru Figure 6 for reference.
6. Refer to Figure 7 thru Figure 14 for additional reference.
7. Clean plastic zippered door for each entrance point for each array and each mixing/cleaning room scaffolding.
8. Refer to Industrial Support Services (ISS) for additional requirements of the particular project.
Page 3 of 13 Planning Memo 240-0049
FIGURE 1. Array Scaffolding and Encapsulation Requirement
2’- 3’
LEVEL 1
LEVEL 2
LEVEL 3
6’3 – 7’
6’3 – 7’
6’3 MIN
See NOTE 3
Scaffolding frame member shall have a minimum of 18” clearance from the edges of the antenna.
Frame member
Encapsulation
Page 4 of 13 Planning Memo 240-0049
FIGURE 2. Side view of scaffolding and encapsulation
ENCAPSULATION
LEVEL 2
LEVEL 1
LEVEL 3
PLANK SHALL BE 6” – 11”
FROM THE ANTENNA FACE
SEAL THE ENCLOSURE
WITH TAPE
SCAFFOLDING TOP
Page 5 of 13 Planning Memo 240-0049
DRAWINGS AND PICTURES BELOW ARE ONLY FOR REFERENCE
FIGURE 3. For CG Ship, Side view of T03 Scaffolding and Mixing Room on the Aft Deck house
5'-0"
10'-0"
8'-0"
11'-4"
5'-0"
6'-6"
2'-0"
6'-6"
1'-0"
6'-6"
12'-4"
LEVEL 2
LEVEL 1
ARRAY FACE (T03)
CG SHIP
MIXING R00M
LEVEL 3
PLASTIC ENCAPSULATE
ALL AROUND
SLANT ON TOP
ZIPPER DOOR
Page 6 of 13 Planning Memo 240-0049
FIGURE 4. For CG Ship, Mixing Room in the AFT Deck house.
3'-0"
11'-4"
5'-0"
17'-2"
8'-0"
18'-0"
5'-0"
AFT DECK HOUSE
ROOM
ELEV VIEW
ZIPPER DOOR TO
ARRAY T03
PLASTIC ENCAPSULATION
ZIPPER DOOR TO
MIXING ROOM
PORT ARRAY
MIXING
ANTENNA
06 LEVEL
T03
PLAN VIEW
DISK
ZIPPER DOOR TO
ARRAY T03
ZIPPER DOOR TO ARRAY
A04 (AFT)
T04 AFT ARRAY
Page 7 of 13 Planning Memo 240-0049
FIGURE 5. For CG Ship, T04 and Mixing Room Scaffolding in the AFT Deck house.
ROOM
3'-0"
10'-0"
8'-0"
11'-4"
1'-0"
6'-6"
2'-0"
6'-6"
6'-6"
12'-4"
5'-0"
CG SHIP
PLASTIC ENCAPSULATE
ALL AROUND
SLANT ON TOP
LEVEL 1
ARRAY FACE (T04)
MIXING
LEVEL 3
ZIPPER DOOR
LEVEL 2
Page 8 of 13 Planning Memo 240-0049
FIGURE 6. For CG Ship, Front view of T04 AFT Array Scaffolding
6'-6"
6'-6"
17'-5"
12'-4"
LEVEL 3
6'-6"
ARRAY FACE
TO4LEVEL 2
ZIPPER DOOR
ALL AROUND
LEVEL 1
(SHIP LEVEL 06)
PLASTIC ENCAPSULATE
(TO MIXING ROOM)
Page 9 of 13 Planning Memo 240-0049
FIGURE 7. Scaffolding of forward arrays on DDG ship.
Page 10 of 13 Planning Memo 240-0049
FIGURE 8. Clearance on the antenna edge FIGURE 9. Scaffolding on level 3
FIGURE 10. Plank clearance of 6” to 11” from the antenna face
Page 11 of 13 Planning Memo 240-0049
FIGURE 11. Three levels of scaffolding FIGURE 12. Access ladders
Page 12 of 13 Planning Memo 240-0049
FIGURE 13. Clearance on the antenna edge FIGURE 14. Three levels of scaffolding
Page 13 of 13 Planning Memo 240-0049