This document is a Bid Form for the Auburn Hills Police Green Roof Replacement project, issued by the City of Auburn Hills in Michigan. The bid solicits qualified contractors to replace the existing green roof at the police department, with bids due on February 26 at 10:00 am. The project involves removing the current green roof and membrane down to the concrete decking, checking substrate condition, and installing a new HPR Modified Bitumen roof system, including necessary flashings, copings, and associated materials.
The bid allows for unit cost adjustments for potential additional work such as concrete decking repair and wood blocking replacement. The City will utilize the Omnia Partner Purchasing Contract to secure project materials, with contractors expected to exclude Garland material costs from their quote. A 5% bid bond is required, and contractors must submit a material addendum sheet listing Garland quantities. The bid form requires contractors to provide their proposed start date, project duration, and complete various submission details including business information and signatures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB_Public Safety Green Roof Replacement.pdf | ||
| Addendum #2.docx | DOCX document | |
| Contractor Disclosure Form.pdf | ||
| Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form: Part A
Police Department Green Roof Roof Replacement
To: Laura Pierce, City Clerk City of Auburn Hills 1827 N. Squirrel Rd.
Auburn Hills, MI 48326
Bid Due Date: February 26, 10:00 am Sealed bids, in triplicate, are to be submitted to the above address by the time and date listed above. Bids received after the Due Date and Time will not be considered.
Pursuant to notices given, the undersigned proposes to furnish all materials and labor necessary to complete the replacement as described below and in strict accordance to the plans and specifications dated 1-14-25. I, the undersigned, having familiarized myself with the attached Contract Documents do hereby propose to furnish all labor, equipment, materials, drayage, tolls, supervision, etc. and to complete all work as specified in these Documents and Specifications. By my submission of this Bidding Proposal I acknowledge the receipt of the Package containing the following: General Conditions & Requirements, General Instructions to Bidders, Detailed Specifications, Detailed Rooftop Diagrams, and Detailed Specification Drawings. To provide supervision, labor, materials and equipment for roof repairs of the following items, per the attached.
The City of Auburn Hills shall utilize the Omnia Partner Purchasing Contract to secure a portion of the material for this project. The below (Bid Form: Part A) should include all but the direct purchase price of materials identified on Bid Form: Part B.
Base Bid #1: The base bid shall include the removal of the existing Green Roof and membrane down to the concrete decking. Substrate shall be checked for deterioration and/or moisture and repaired per the unit cost identified below. New roof system is to consist of an HPR Modified Bitumen system as specified. This shall include all necessary flashings, copings, pitch pockets, and necessary materials in accordance with the specifications, scope of work, and details provided in the bid documents.
All labor, materials, services and equipment necessary for completion of the work shown on the drawings and in the specifications.
Green Roof Replacement DOLLARS ($ )
Contractor is to exclude cost of Garland materials in above quote due to the City purchasing those materials directly through the OMNIA Cooperative Purchasing Program. Contactor is to submit Material Addendum sheet with Garland quantities listed.
***Note:
5% Bid Bond (Included with Bid) 100% Performance Bond
Extra work may be necessary other than required by the plans and specifications, extra work will be completed according to the written instructions of the Owner for the following unit prices:
Unit Cost Items: Repair of concrete decking –_________________________ per sq. ft.
Unit Cost Items: Replacement/additional wood blocking –_________________________ per lf
Contractor Name ______________________________________________________
Continue to next page
Proposed Start Date and Duration: Start Date__________________________________ Duration: _______________________
*Subcontractor Disclosure to be included with Bid Submission
Addenda Numbers are hereby acknowledged
Respectfully Submitted, SIGNATURE: __________________________________
TITLE: __________________________________
BUSINESS NAME: __________________________________
CONTRACTOR ADDRESS: ___________________________________ DATE: __________________
File details come from the government source that posted it. Updated .