Attmt 2 Vendor Price Sheet TSFS FY24 Alarm and Monitoring Rev1.xls

XLS spreadsheet 57 KB Posted

Attached to
Training Ship Freedom Star FY24 Alarm Monitoring System Install
Solicitation number
6933A224Q000016
Issued by

About this file

This document appears to be a vendor price sheet for an Alarm and Monitoring System installation project on the Training Ship Freedom Star for the U.S. Maritime Administration (MARAD). The solicitation number is 6933A224Q000016, and the project involves replacing the existing obsolete I.S.I.S 700C system with a new ABS/USCG approved system. The new system will include all existing alarms and monitoring points, along with an additional 10% capacity for digital and analog inputs and outputs.

The price sheet provides a breakdown of estimated labor and material costs for the alarm and monitoring system, as well as supplemental labor and materials. The total cost estimate for the base scope of work is $10,000. The document also includes detailed labor cost breakdowns by trade and labor category. No specific response dates, award dates, or set-asides are provided in this attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Availabilty Summary Estimate

Freedom Star Vendor Price Sheet5-Aug-24
AVAILABILITY SUMMARY ESTIMATE SHEET(See individual estimate sheets tab for detailed breakdown of estimate)
Item No.Title / DescriptionMaterial, Misc & Other Costs
Total Labor CostTotal Cost estimate
SECTION 200: WORK ITEMS
1Alarm and Monitoring System$ - 0
2Supplemental Labor$ 10,000.00$ 10,000.00
3Supplemental Materials$ - 0
Total w/o Optional Items$ 10,000.00

Individual Item Estimates

Job Title:Item 1
Labor CostsSummary of Costs
TradeManhoursLabor HoursLabor Rate/HourTotal
BlacksmithStraight Time$0.00
Boiler makerPremium Time (1-1/2)$0.00
BurnerPremium Time (2)$0.00
CarpenterTravel Time$0.00
ChipperTotal Labor Costs$0.00
ElectricianMaterial
Engineering ServicesTech Rep
Fire watchEquipment
General LaborOther (Specify)
JoinerTotal Costs Other Than Labor$0.00
LaggerGrand Total$0.00
Machinist InsideRemarks:
Machinist Outside
NDT
Painter
Pipefitter
QA
Rigger
Sheet Metal
Shipfitter
Welder
Total0.0
Job Title:Item 2
Labor CostsSummary of Costs
TradeManhoursLabor HoursLabor Rate/HourTotal
BlacksmithStraight Time$0.00
Boiler makerPremium Time (1-1/2)$0.00
BurnerPremium Time (2)$0.00
CarpenterTravel Time$0.00
ChipperTotal Labor Costs$0.00
ElectricianMaterial
Engineering ServicesTech Rep
Fire watchEquipment
General LaborOther (Specify)
JoinerTotal Costs Other Than Labor$0.00
LaggerGrand Total$0.00
Machinist InsideRemarks:
Machinist Outside
NDT
Painter
Pipefitter
QA
Rigger
Sheet Metal
Shipfitter
Welder
Total0.0
Job Title:Item 3
Labor CostsSummary of Costs
TradeManhoursLabor HoursLabor Rate/HourTotal
BlacksmithStraight Time0.0$0.00
Boiler makerPremium Time (1-1/2)$0.00
BurnerPremium Time (2)$0.00
CarpenterTravel Time$0.00
ChipperTotal Labor Costs$0.00
ElectricianMaterial
Engineering ServicesTech Rep
Fire watchEquipment
General LaborOther (Specify)
JoinerTotal Costs Other Than Labor$0.00
LaggerGrand Total$0.00
Machinist InsideRemarks:
Machinist Outside
NDT
Painter
Pipefitter
QA
Rigger
Sheet Metal
Shipfitter
Welder
Total0.0
Job Title:Item 4
Labor CostsSummary of Costs
TradeManhoursLabor HoursLabor Rate/HourTotal
BlacksmithStraight Time$0.00
Boiler makerPremium Time (1-1/2)$0.00
BurnerPremium Time (2)$0.00
CarpenterTravel Time$0.00
ChipperTotal Labor Costs$0.00
ElectricianMaterial
Engineering Services200.0Tech Rep
Fire watchEquipment
General LaborOther (Specify)
JoinerTotal Costs Other Than Labor$0.00
LaggerGrand Total$0.00
Machinist InsideRemarks:
Machinist Outside
NDT
Painter
Pipefitter
QA
Rigger
Sheet Metal
Shipfitter
Welder
Total200.0
Job Title:Item 5
Labor CostsSummary of Costs
TradeManhoursLabor HoursLabor Rate/HourTotal
BlacksmithStraight Time$0.00
Boiler makerPremium Time (1-1/2)$0.00
BurnerPremium Time (2)$0.00
CarpenterTravel Time$0.00
ChipperTotal Labor Costs$0.00
ElectricianMaterial
Engineering Services200.0Tech Rep
Fire watchEquipment
General LaborOther (Specify)
JoinerTotal Costs Other Than Labor$0.00
LaggerGrand Total$0.00
Machinist InsideRemarks:
Machinist Outside
NDT
Painter
Pipefitter
QA
Rigger
Sheet Metal
Shipfitter
Welder
Total200.0

File details come from the government source that posted it. Updated .