Atth 1 Panama SOW.pdf
PDF 2 MB Posted
- Attached to
- Laboratory Services Panama
- Solicitation number
- SPE603-26-Q-0501
- Issued by
-
Defense Logistics Agency Energy
About this file
This is a Statement of Work for contracted laboratory testing services in Panama dated April 30, 2026, with contract number SPE603-26-Q-0501. The Contractor is responsible for laboratory testing of Defense Working Capital Fund (DWCF) owned petroleum products, transportation of fuel samples from the DLA Energy Defense Fuel Service Point (DFSP) in Panama to the contractor's laboratory, and shipment of samples to other Government locations or contracted laboratories as needed. The contractor must maintain facilities in Panama that meet specified turn-around times, possess ISO 9001 and/or ISO/IEC 17025 certification, and retain a current copy of all required specifications and standards including ASTM and military standards accessible through http://quicksearch.dla.mil or https://assist.dla.mil.
The contract requires testing of five petroleum product types: Aviation Turbine Fuel Grade JET A (ASTM D1655), JET A-1 NATO F-35 (ASTM D1655), JP-5 NATO F-44 (MIL-DTL-5624), Diesel Fuel Navy Distillate NATO F-76 (MIL-DTL-16884), and Marine Fuel Grade-DMA (ISO 8217). Testing is organized into A Series (specification testing per product standards and MIL-STD-3004-1), B-1 through B-3 Series, and C Series, with individual tests available upon request. Turn-around times are: A Series 24 hours, B Series 12 hours, C Series 8 hours, individual tests 6 hours, expedited tests 12 hours, and secured fuel performance testing 6 hours from notification of sample preparation. The contractor must provide detailed monthly reports, maintain epoxy-lined sample shipping containers, retain samples for minimum 45 days, implement contingency plans for service interruption, establish training and safety programs, and submit equipment status annually. Approved testing methods are specified in Attachment C across multiple standards including ASTM, IP, ISO, and D-series methods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 Atth 3 - Panama Price Sheet.xlsx | XLSX spreadsheet | |
| SF30_SPE60326Q05010001.PDF | ||
| Atth 4 PPQ.pdf | ||
| Atth 7 Tech Mgmt Resp.pdf | ||
| SPE603-26-Q-0501.pdf | ||
| Atth 3 Price Sheets Panama.xlsx | XLSX spreadsheet | |
| Atth 2 EQAP.pdf | ||
| Atth 5 Consent Form.pdf | ||
| Atth 6 PP References.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for
Contracted Laboratory Services
Panama
April 30, 2026
SPE603-26-Q-0501
Panama Lab Testing Services Attachment 1
Contents
C-1.0 General Description:
C-1.0.1 Service Locations:
C-1.1 Facilities:
C-1.2 Specifications, Standards and Handbooks:
C-1.3 Scheduling of Services:
C-2.0 Contract Deliverables:
C-2.1 Contract Compliance Plan:
C-2.2 Laboratory Test Reports:
C-2.3 Contract Contingency Plan:
C-2.4 Contract Training Plan:
C-2.5 Safety Plan:
C-2.6 Transportation Plan:
C-2.7 Laboratory Equipment Plan:
C-2.8 Monthly Reporting:
C-3.0 Laboratory Requirements:
C-3.1 Operating Hours:
C-3.2 Staffing:
C-3.3 Knowledge and Skills:
C-3.4 Access:
C-3.5 Epoxy Lined Sample Cans:
C-3.6 Thermal Oxidation Stability Failures:
C-3.7 Ellipsometric Tube Deposit Rater (ETR):
C-3.8 Turn-around Times:
C-3.9 Retain samples:
C-4.0 Transportation Performance Requirements:
C-5.0 Secured Fuels Performance Requirements:
C-6.0 Sample Shipment:
Attachment A: Products
Attachment B: Series Testing Requirements
Attachment C: Approved Testing Methods
SPE603-26-Q-0501
Page | 1
C-1.0 General Description: This Statement of Work (SOW) provides the requirements for laboratory testing services in Panama. The Contractor will be responsible for the laboratory testing of Defense Working Capital Fund (DWCF) owned petroleum products in accordance with the specifications as described herein; transportation of fuel samples from service locations to the contractor’s laboratory; and, as needed, shipment of samples from the contractor’s laboratory to other
Government locations or contracted laboratories. Government-owned products may also be shipped or delivered by a
Government representative to the Contractor’s laboratory for testing.
C-1.0.1 Service Locations: DLA Energy Defense Fuel Service Point (DFSP) located in the country of Panama.
C-1.1 Facilities: The Contractor shall have facilities in Panama that meet the required turn-around times in section
C-3.8. The Contractor shall provide the location(s) of the facility where the product shall be tested, facility testing capabilities, and contact information.
C-1.2 Specifications, Standards and Handbooks: At each laboratory, the Contractor shall retain a copy of all required specifications, standards, test methods, handbooks, etc., per this SOW and perform services in accordance with testing requirements. Military Specifications referenced in Attachment A for petroleum product types can be obtained at http://quicksearch.dla.mil or https://assist.dla.mil but can also be requested in writing to the Contracting Officer (CO) or
Contracting Officer’s Representative (COR).
C-1.3 Scheduling of Services: All plans shall be submitted to the CO for review and acceptance as a part of the technical proposal as documented in the solicitation. Plans shall be kept current for the life of the contract. The Government reserves the right to request changes or modifications to any detailed plans at any time throughout the contract performance period. Plans shall be made available for Government review upon request at any time during the contract performance period.
C-2.0 Contract Detailed Plans: All plans shall be submitted to the CO for review and acceptance as a part of the technical proposal as documented in the solicitation. Plans shall be kept current for the life of the contract. The
Government reserves the right to request changes or modifications to any detailed plans at any time throughout the contract performance period. Plans shall be made available for Government review upon request at any time during the contract performance period.
C-2.1 Contract Compliance Plan: The Contractor is responsible for compliance with all contract performance requirements. The Contractor is responsible for all actions taken by any sub-contractor utilized under this contract. The
Contractor shall be ISO 9001 and/or ISO/IEC 17025 certified. Samples that need to be sub-contracted for certain test methods or tasks out, due to whatever circumstances, must inform the contracting officer during the offer period, request for an exception, deviation or waiver (EDW) for that particular task. Should a Government Quality Assurance
Representative (QAR) opt or be required to observe testing conducted at a subcontractor's facility, they will be granted complete access to monitor all aspects of the testing process.
C-2.2 Laboratory Test Reports: The Contractor shall maintain records evidencing all analysis performed under this contract. All samples tested shall be documented with a detailed report. Reports shall be complete and legible containing information pertaining but not limited to Lab Name, Date of test, Test Method, Test Name, Test Results, Test
Units, specification limits (max/min), and signature certifying results.
Thermal Stability test reports shall include the following additional data:
1. Type of tester used.
2. Tube manufacturer and serial number.
3. Rating method: Visual Tube Rater (VTR), Interferometric Tube Rater (ITR), or Ellipsometric Tube Rater
(ETR).
Any reports not containing the appropriate information shall be corrected and resubmitted by the Contractor.
NOTE: The inclusion of test results indicating "Pass" or "Fail" is not necessary on the report and will be decided by the end user.
C-2.3 Contract Contingency Plan: The contract contingency plan shall outline Contractor actions to ensure there is
SPE603-26-Q-0501
Page | 2 no significant interruption of services resulting from labor disputes, catastrophic failure of equipment, or the effects of natural disasters/emergencies to include ensuring the facility is operational or has a sub-contracting plan in case of power outage for more than 48 hours.
C-2.4 Contract Training Plan: The Contractor shall provide a detailed plan that identifies employee training requirements and procedures necessary to maintain proficiency. The plan shall identify length of training, training sources and a brief description of courses such as safety, environmental protection and job qualification training. The Contractor is responsible for ensuring all individual training requirements are accomplished. The Contractor must demonstrate current participation in a proficiency program or suitable means to verify laboratory performance.
C-2.5 Safety Plan: The Contractor shall provide a detailed plan outlining the policy, procedures and actions necessary to maintain a safe working environment for employees and visitors. The plan shall cover the products stored, handled, Safety Data Sheets (SDS) and guidelines regarding the safe handling of such products and shall be maintained and updated over the course of the contract.
C-2.6 Transportation Plan: The Contractor is required to submit a plan for review to transport the petroleum samples to an approved laboratory for testing or shipping (contractor supplied transport, third party delivery service, etc.)
and how they plan on tracking the chain of custody to the Contractor’s facility. Product quality must be preserved and not altered by shipment. DLA Energy or its subcontractor(s) do not have the ability or certification to ship or package fuel samples.
C-2.7 Laboratory Equipment Plan: The Contractor will furnish annually to the CO directly the status by name, model and serviceability of all equipment used in laboratory testing. Equipment that malfunctions or is non-serviceable will be reported to the CO and COR within 48 hours, along with mitigation plan to provide testing capability.
C-2.8 Monthly Reporting: The Contractor shall provide a monthly written report to the CO and COR with the number of laboratory tests performed, what testing was included, and the location of performance. The Contractor will submit monthly written reports via Wide Area Workflow (WAWF) or directly to the CO and COR, as directed by the CO and COR.
C-3.0 Laboratory Requirements: The following are general requirements for all Contractor laboratories.
Laboratories are required to have the listed referee test methods which are referenced in the product specifications and international test methods (ASTM, EI, etc.).
C-3.1 Operating Hours: The Contractor shall be responsible for adjusting hours of operation to meet workload demands and turn-around times in section C-3.8.
C-3.2 Staffing: The Contractor shall provide sufficient staffing to accomplish all functions and tasks to include simultaneous operations of performing multiple tests at a time, and provide the contact information for the laboratory manager or assistant laboratory manager if the laboratory is not manned 24 hours, seven days a week.
C-3.3 Knowledge and Skills: The Contractor shall ensure that personnel assigned to all tasks have the requisite knowledge and skills to meet the performance standards and comply with all applicable federal, state, and local laws, regulations, and codes. All supervisors and key employees shall be able to read and understand English so they can understand and follow oral or written instructions, directions, directives, regulations, and operating procedures. All supervisors and Contractor key employees shall be capable of writing in English to compose the required detailed reports.
C-3.4 Access: The Contractor shall allow DLA Energy representatives to witness testing or sampling. The Contractor shall provide the applicable information for access and provide follow-up to obtain access (for personnel and vehicles) to all facilities where product is tested or sampled. For areas that require special admission, the Contractor will assist DLA
Energy representatives in gaining access.
C-3.5 Epoxy Lined Sample Cans: The Contractor shall maintain a supply of 10 unused epoxy lined fuel sample shipping containers to be provided to DLA Energy personnel per request. Sample containers shall be stored to ensure they are clean and free from all substances that might contaminate the product being sampled. Containers must meet the following specifications: Complies with ASTM D-4306, height not to exceed 9 inches, diameter not to exceed 7 inches, SPE603-26-Q-0501
Page | 3 capacity 1 USG, Bung Plug ¾” with lock-wire hole, carrying handle able to be shipped as hazardous material.
C-3.6 Thermal Oxidation Stability Failures: If a failure occurs using an ALCOR (PAC) Mark IV, the retest shall not be conducted on any ALCOR (PAC) Mark IV model.
C-3.7 Ellipsometric Tube Deposit Rater (ETR): The Contractor shall perform ASTM D3241 Annex 3 ETR within the testing turn-around times in section C-3.8, Sample Testing Turnaround Times. ETR is the preferred method and shall be treated as the referee method.
C-3.8 Turn-around Times: The Contractor shall perform testing in accordance with the turn-around times listed in the table below. Turn-around time starts when the Contractor is notified that the sample is prepared for transportation from sample location to the servicing laboratory. Turn-around time ends when testing results are completed and delivered to
DLA Energy. DLA Energy will give the Contractor at least 12 hours of advance notice of the sample being prepared for shipment (turn-around time start). The prime Contractor is responsible for any sub-contractor actions. The 12 hours of advance notice is not included in the turn-around time. If testing cannot be completed within the turn-around time, the
Contractor will immediately notify the CO and COR. The Contractor shall specify the problem and the estimated completion date and time. If there is a need for an expedited test, it will be a maximum turn-around time of 12 hours.
C-3.9 Retain samples: After analysis, the Contractor shall retain samples for a minimum of 45 days. In the event of a suspected quality issue or dispute, a longer sample retention period may be requested by DLA Energy. The Contractor shall be responsible for disposal of excess fuel samples and sample containers.
C-4.0 Transportation Performance Requirements: The Contractor shall be responsible for packing and transporting all petroleum samples from a job site to the laboratory in accordance with laws and regulations. When requested by DLA Energy personnel, the Contractor shall be able to provide an epoxy lined sample can, detailed in C-3.5 for replacement. When sample transportation is not required of the Contractor, they shall be notified in advance.
C-5.0 Secured Fuels Performance Requirements: Due to mission demands DLA Energy shall request petroleum testing under Attachment B from MIL-STD-3004-1 table XII. DLA Energy will provide the Contractor with as much advance notice as possible, as the turn-around time shall not exceed 6 hours after receipt of sample at the laboratory.
Specifics/logistics shall be scheduled by the QAR after a task order for the secured fuels testing services is issued.
C-6.0 Sample Shipment: The Contractor shall, upon request, be responsible for shipping fuel samples from locations in C-1.0.1 to the laboratories in the chart below or any other laboratory location requested by DLA Energy Representative.
Fuel samples shall be shipped within 48 hours of request and arrive to the below laboratory within five calendar days.
Naval Air Systems Command
HAZMART Bldg. 2385 22680 Hammond Road Patuxent River, MD 20670
US ARMY TARDEC
Petroleum Laboratory Bldg. 5085 U Avenue, Bldg 85 New Cumberland, PA 17070-
Aerospace Fuels Laboratory
AFPA/PTPLA 2430 C Street, Bldg 70, Area B
Wright Patterson AFB OH 45433-
Naval Research Laboratory
4555 Overlook Avenue, SW
Washington, DC 20375
Southwest Research Institute
6220 Culebra Rd
San Antonio, TX 78238-5166
Air Force Research
Laboratory AFRL
2977 Hobson Way
WPAFB, OH 45433
Maximum Turn-around Hours Chart
A Series 24 hours
B Series 12 hours
C Series 8 hours
Individual tests 6 hours
Expedite 12 hours
Secured Fuel Performance 6 hours
SPE603-26-Q-0501
Page | 4
Page | 5
Statement of Work Attachment A: Products
Specifications shall dictate the testing required and the Contractor shall develop a plan based on product specifications (A level testing) and MIL-STD-3004-1 (B-1, B-2, B-3, C test), latest version. MIL-STD_3004-1 describes products to be tested, types of testing required and additional information as required. All referenced material can be obtained at http://quicksearch.dla.mil/, https://assist.dla.mil/, or by contacting the CO, COR, or QAR.
Jet Fuels
Aviation Turbine Fuel, Grade JET A (Specification: ASTM D1655 latest version)
Aviation Turbine Fuel, Grade JET A-1, NATO F-35 (ASTM D1655 latest version)
Aviation Turbine Fuel, Grade JP-5 NATO F-44 (Specification: MIL-DTL-5624, latest version)
Diesel Fuels
Diesel Fuel, Navy Distillate NATO F-76 (Specification: MIL-DTL-16884, latest version)
Marine Fuel Grade-DMA (MGO) (Specification: ISO 8217 latest version)
Panama Lab Testing Services Attachment 1 http://quicksearch.dla.mil/ https://assist.dla.mil/
Page | 6
Statement of Work Attachment B: Series Testing Requirements
The list below provides tests by name and methods that shall be required to be performed on petroleum products at the
Contractor’s laboratory in accordance with product specifications MIL-STD-3004-1, specifications, and authorized test methods. Tests shall be requested by series or individually by a DLA Energy representative as the situation warrants.
1. A Series (Specification testing in accordance with Attachment A and MIL-STD-3004-1, latest version)
2. B-1 Series (MIL-STD-3004-1, latest version, list tests required in group)
3. B-2 Series (MIL-STD-3004-, latest version, list tests required in group)
4. B-3Series (MIL-STD-3004-1, latest version, list tests required in group)
5. C Series (MIL-STD-3004-1, latest version, list tests required in group)
Individual Tests: Individual tests may be requested from any test included in the A, B or C series specifications, MIL-STD-3004-1 or from the tables below.
Note: Tests are grouped by physical or chemical property and do not imply equivalency. Verify that the test is appropriate to the product specification prior to analysis.
1. Secured Fuel Series Testing Requirements and Specification Limits (Table XII Latest Version)
Table XII. Support for secure fuel 4
Page | 7
2. Jet A & Jet A-1 (NATO F35) Series Testing Requirements for Specifications ASTM D1655
A Series
Characteristics ASTM
D1655
B-1
Series
B-2
Series
B-3
Series
C-Series
Appearance X X X X X
Color (Visual) X X X X X
Density or API Gravity X X X X X
Particulate Contamination/
Particulate Matter
X X X X
Particle Count X
Total Acidity X X
Aromatics X
Total Sulfur X
Mercaptan Sulfur X
Doctor Test X
Distillation X X X X
Viscosity X
Smoke Point X
Naphthalenes X
Specific Energy X
Hydrogen Content X
Calculated Cetane Index X
Copper Strip Corrosion X X X X
Freezing Point X X X X
Existent Gum X X X X
Flash Point X X X X X
Water Reaction
(When requested)
FSII X X X X
Particulate
Contamination/Particulate
Matter with Filtration
Time
X X X X
Microseparometer (MSEP) X X X X
Electrical Conductivity X X X X
Thermal Stability X X X
Color (Saybolt) X X
Peroxide Number X
FAME X X X X
Lubricity X
Sulfides in Bottom Water
Page | 8
3. JP5 (NATO F44) Series Testing Requirements for Specifications MIL-DTL-5624
Characteristics MIL DTL
B-1
B-2 Series B-3 Series C- Series
Appearance/Workmanship X X X X X
Color (Visual) X X X X X
Particulate Contamination/
Particulate Matter
X X X X
Particle Count X
Total Acidity X X
Aromatics X
Total Sulfur X
Mercaptan Sulfur X
Doctor Test X
Distillation X X X X
Flash Point X X X X X
API or Density at 15° C X X X X X
Vapor Pressure X
Freezing Point X X X X
Viscosity at minus 20°C X
Smoke Point X
Naphthalenes X
Specific Energy (Net Heat of
Combustion)
X
Copper Strip X X X X
Thermal Stability X X X
Existent Gum X X X X
Microseparometer (MSEP) X
Electrical Conductivity X
Colour, Saybolt X X
Particulate
Contamination/Particulate Matter with Filtration Time
X X X X
Fuel System Icing Inhibitor X X X X
FAME X X X X
Hydrogen Content X
Cetane Index, Calculated X
Water Reaction
Page | 9
4. F-76 Series Testing Requirements for Specification MIL-DTL-16884
Characteristics MILDTL
16884
B-1
Series
B-2
B-3 Series C-Series
Appearance/Workmanship X X X X X
Demulsification X
API Gravity or Density at 15°C X X X X X
Distillation X X X
Cloud Point X X
Color X X X X X
Flashpoint X X X X X
Particulate Contamination X X X
Pour Point X X
Viscosity at 40°C X X
Acid Number X X
Ash X X
Aromatics X
Carbon Residue X X X
Copper Strip Corrosion X X
Hydrogen Content X
Ignition Quality (Cetane Number, Cetane Index, or Derived Cetane
Number)
X X
Storage Stability X X
Sulfur Content X X X
Trace Metals (Ca, Pb, Na, K and V) X
Lubricity X X X
Water and Sediment X X X
FAME X X X
Water Reaction (When requested)
Water Separability
Page | 10
5. Marine Gas Oil (MGO) Grade DMA Series Testing Requirements for Specification ISO 8217
Characteristics
ISO 8217
B-1
Series
B-2
Series
B-3
Series
C-Series
Appearance X X X X X
Kinematic Viscosity X X
Density X X X X
Sulfur X X
Flash Point X X X X X
Hydrogen Sulfide X
Acid Number X X
Total Sediment, aged
Carbon Residue X X X
Pour Point X X
Water X
Ash X
Cetane Index X X
Oxidation Stability X X X
FAME X X X
Cloud Point X
Cold Filter Plugging Point X
Lubricity X
SPE603-26-Q-0501
Page | 11
Statement of Work Attachment C: Approved Testing Methods
Table 1: Aviation Turbine Fuels
Jet A/JA-1
(ASTM D1655)
JP-5
(MIL-DTL- 5624)
Appearance Visual, D4176 Visual Color (Visual) Visual Visual
Density or API
Gravity
D1298, IP 160,
D4052, IP 365
D1298, D4052 D7777
Particulate
Contamination/Parti culate Matter
D2276, IP 216
D5452 (referee), IP 423
D2276, D5452 (referee)
Particle Count IP 564, IP 565, IP 577, D7619 IP 564, ID 565, IP 577 D7619 (referee)
Total Acidity IP 354, D3242 D3242
Aromatics IP 156, D1319, IP 436, D6379
D1319, D6379
Total Sulfur D1266, D2622, D4294, D5453, IP 336
D129, D1266, D2622, D3120, D4294 (referee), D5453
Mercaptan Sulfur IP 342, D3227 D3227
Doctor Test D4952 D4952
Distillation D86, D2887, IP 406, D7344
D7345, IP 123
D86 (referee) , D7345, D2887
Viscosity IP 71 Section 1, D445, D7042, D7945
D445
Smoke Point IP 598, D1322 D1322
Naphthalenes D1840 D1840
Specific Energy D3338, D4529, D4809 (referee), IP 12
D3338, D3338M, D4529, D4809 (referee)
Hydrogen Content D3343, D3701 D3701, D5291, D7171
Calculated Cetane Index D4737 Procedure A D976, D4737
Copper Strip Corrosion D130, IP 154 D130
Freezing Point D5972, IP 435, D7153, IP 529, D7154, IP 528, D2386, IP 16
D2386 (referee), D5972, D7153, D7154
Existent Gum D381, IP 540 D381(referee), IP 540
Flash Point D56, D93, D3828, IP 170, IP 523
D56, D93 (referee), D3828
Water Reaction D1094 D1094
FSII D5006 D5006
Particulate
Contamination/Particu late Matter with
Filtration Time
Test in accordance with Appendix A of MIL-DTL- 5624 Appendix A.
Test in accordance with Appendix A of MIL-DTL-5624 Appendix A, D2276, D5452 ( referee)
SPE603-26-Q-0501
Page | 12
Microseparometer
(MSEP)
D3948, D7224 D3948, D7224 (referee)
Electrical
Conductivity
D2624, IP 274 D2624
Thermal Stability D3241 (Annex A3, referee)
D3241 (Annex A3, referee)
Color (Saybolt) D156 D156 (referee), D6045
Peroxide Number N/A N/A
FAME D7797, IP 583,
IP 585 (referee), IP 590, IP
D7797, IP 583, IP 585
(referee), IP 590, IP 599
Lubricity D5001 N/A
Table 2: Marine Diesel
F-76 (MIL-DTL-16884)
Appearance D4176 Color (Visual) D1500 (referee), D6045 Density or API Gravity D1298 (referee), D4052, D287, D7777 Distillation D86 (referee), D2887 Flash Point D93(referee), D6450, D3828 Carbon Residue D524(referee), D189, D4530 Cloud Point D2500(referee), D5771, D5772, D5773 Pour point D97(referee), D5949, D5950, D5985 Copper Strip Corrosion D130 Viscosity D445, D7042 Water and Sediment D2709 Particulate D6217 Storage Stability D5304 (referee), D2274 Sulfur D5453(referee), D1266, D2622, D3120, D7039 Fatty Acid Methyl Ester (FAME) BS EN 14078, IP579, D7963 Lubricity D6079 (referee), D7688 Demulsification D1401 Particulate Contamination D6217 (referee), D5452 Acid Number D974 (referee), D664 Ash D482 Aromatics D6591 (referee), D2425 Hydrogen Content D7171 (referee), D4808, D5291 Ignition Quality (Cetane Number, Cetane Index or Derived Cetane Number)
D613 (referee), D976, D6890, D7170
Trace Metals (Ca, Pb, Na, K and V) D7111 (referee), D3605 Water Reaction D1094 Water Separability D1401
Page | 13
Table 6: Marine Fuel
Marine Gas Oil MGO; DMA grade
(ISO 8217)
Appearance Section 6.12 of ISO 8217-2017
Kinematic Viscosity ISO 3104
Density ISO 3675, ISO 12185
Sulfur ISO 8754, ISO 14596, D4264
Flash Point ISO 2719
Hydrogen Sulfide IP 570
Acid Number D664
Total Sediment, aged N/A
Carbon Residue ISO 10370
Pour Point ISO 3016
Water ISO 3733
Ash ISO 6245
Cetane Index ISO 4264
Oxidation Stability ISO 12205
FAME IP 579, D7963, EN14078
Cloud Point ISO 3015
Cold Filter Plugging Point IP 309, IP 612
Lubricity ISO 12156
SPE603-26-Q-0501 Panama
Lab Testing Services
File details come from the government source that posted it. Updated .