Attchment F Price Schedule Breakdown Sheet - 1 page.pdf
PDF 313 KB Posted
- Solicitation number
- 36C26325B0014
About this file
The document is a Price Schedule Breakdown Sheet for a project titled "TEST FIRE DAMPER" with project number 437-23-150. The sheet provides a comprehensive template for contractors to detail project costs across multiple construction divisions, including General Building Construction (Divisions 1-14), Mechanical and Electrical Systems (Divisions 21-28), and Site Improvements (Divisions 31-34). The breakdown allows for granular cost allocation across categories such as General Requirements, Existing Conditions, Concrete, Masonry, Metals, and various specialized construction and engineering disciplines.
The template requires contractors to calculate subtotals for each major division group, with designated spaces for miscellaneous costs, profit, and overhead. The final section provides a line for the Proposal Grand Total, enabling a comprehensive and structured approach to pricing the fire damper project. While the specific contractor is not filled in, the document serves as a standardized cost breakdown tool to facilitate detailed and transparent project cost estimation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Breakdown Sheet Project Title: TEST FIRE DAMPER Project Number: 437-23-150 Contractor:
Division # Division Title Base Project 1 General Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood, Plastics and Composites 7 Thermal and Moisture Protection 8 Openings 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 14 Conveying Equipment Subtotal General Building Construction $
21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security Subtotal Mechanical and Electrical $
31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation Subtotal Site Improvements $
Miscellaneous (Contractor shall identify any costs included)
Subtotal All Divisions & Miscellaneous (if any) $ Profit Overhead Proposal Grand Total $