Attch1_Asbestos Report.pdf
PDF 804 KB Posted
- Attached to
- B500 PA Floor Federal contract opportunity
- Solicitation number
- FA462624Q0042
About this file
This document is an Asbestos Inspection Report for the PA Office within Building 500 at Malmstrom Air Force Base. The inspection was performed by TD&H Engineering on May 2, 2024 in preparation for planned floor repairs. The report identifies that black and tan mastic under non-asbestos tan floor tile contains greater than 1% asbestos, which is considered a Category I non-friable asbestos-containing material (ACM). The report provides recommendations for managing the ACM during the renovation, including that removal must be overseen by an accredited competent person if the material is rendered friable, and outlines disposal requirements. It also notes the ACM has a Condition 4 ranking, indicating it does not pose an immediate hazard. This information would likely be relevant to a federal contract opportunity for the asbestos abatement and flooring replacement work at Building 500.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD 2015-5319 Rev. 22.pdf | ||
| COMBO_PAFloor.pdf | ||
| Attch4_Wage Determination.pdf | ||
| Attch3_Floor Plan.pdf | ||
| Attch2_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA
4 0 6 . 7 6 1 . 3 0 1 0 t d h e n g i n e e r i n g . c o m
1 8 0 0 R i v e r D r i v e N o r t h
G r e a t F a l l s , MT 5 9 4 0 1
ASBESTOS INSPECTION SUMMARY
TD&H Engineering (TD&H) performed a limited asbestos inspection within the PA office of Building 500, Malmstrom Air Force Base (MAFB) on May 2, 2024. The purpose of the pre-renovation inspection was to assess building materials suspected of containing asbestos within the floor of PA office of Building 500.
The inspection was performed by Mr. Kyle A. Groves of TD&H, a technician Montana-accredited asbestos inspectors, in accordance with the U.S. Environmental Protection Agency (EPA) – Asbestos Hazards and Emergency Response Act (AHERA) regulation 40
CFR 763.
The following building material contained asbestos in quantities greater than 1%:
▪ Black and tan mastic under non-asbestos tan floor tile.
Sincerely, Kyle A. Groves Corey League CHMM MTA-6137 Exp. 2024.11.17 MTA-5902 Exp. 2024.11.17 Industrial Hygiene Technician Project Manager
TD&H ENGINEERING TD&H ENGINEERING
TD&H Project No: 24-083-071
Report Issue Date: May 8, 2024
I : \2024\GTF\ 24 -083 MAFB IH 2024 \05_DESIGN\ IND HYGIENE\071\APPENDIX\A_ASBESTOS
INSPECTION SUMMARY\WORKING\A1_ASBESTOS SUMMARY PAGE.DOCX
t d h e n g i n e e r i n g . c o m
May 8, 2024
Mr. Jared Grundhauser Malmstrom Air Force Base
341 CES/CEIC
Malmstrom AFB, MT 59402-7536
RE: PRE-RENOVATION ASBESTOS INSPECTION
THE PA OFFICE, BUILDING 500
MALMSTROM AIR FORCE BASE, MONTANA
TD&H ENGINEERING JOB NO. 24-083-071
Dear Mr. Grundhauser, TD&H Engineering (TD&H) understands Malmstrom Air Force Base (MAFB) plans to repair the floor of the PA Office within Building 500. TD&H performed an asbestos inspection on the building materials on May 2, 2024. This asbestos inspection report must be kept on site during renovation activities. A summary of the asbestos inspection is provided in Appendix A. The Montana Department of Environmental Quality (MDEQ) has recently issued new rules and TD&H has made their best effort to incorporate these rules into new and existing projects.
ASBESTOS INSPECTION
The Administrative Rules of Montana (ARM) 17.74.354 require an asbestos inspection be completed for all building materials prior to scheduled renovation activities to determine if asbestos-containing materials (ACM) are present. ACM is defined as any material or product that contains more than 1% asbestos. The National Emissions Standards for Hazardous Air Pollutants [NESHAP – 40 Code of Federal Regulations (CFR) 61], the Occupational Safety and Health Administration (OSHA), and the ARM regulate asbestos due to the respiratory hazard that airborne asbestos fibers present. The inspection was performed by Mr. Kyle A.
Groves of TD&H, a Montana-accredited asbestos inspector, in accordance with the Environmental Protection Agency (EPA) – Asbestos Hazards and Emergency Response Act (AHERA) regulation 40 CFR 763. Documentation of accreditation is provided in Appendix B.
Building materials were identified, categorized, numbered, and placed into homogeneous areas (HAs) for sample collection and laboratory analysis. The number of samples collected from building materials identified during the inspection is based on the following:
• Surfacing Materials: At least three samples for surfacing materials that are 1,000 square feet (SF) or less, at least five samples for surfacing materials that are greater than 1,000 SF but less than or equal to 5,000 SF, and at least seven samples for surfacing materials that are greater than 5,000 SF.
May 6, 2024 PAGE NO. 2
• Thermal System Insulation: Three samples from each HA of thermal system insulation, which may include but is not limited to boiler insulation, mudded fittings, and expanded vermiculite insulation.
• Miscellaneous Materials: Three samples from each HA of miscellaneous material, such as ceiling tile, wallboard system, cove base mastic, floor tile and mastic, concrete, roofing materials, and brick mortar.
• Materials Less Than Regulated Quantities: At least one sample from each HA of patching material, such as replacement floor tiles or patching plaster, and materials of less than 10 SF in total area, which are not subject to regulation by the MDEQ but may still trigger OSHA requirements.
A total of five suspect building materials were identified during this inspection. Bulk samples were collected from the building in accordance with the currently recognized standard protocol developed under AHERA. Bulk samples were placed into containers and shipped to CA Labs, LLC (CA Labs) in Baton Rouge, Louisiana, for analysis in accordance with the approved QAPP SOP 18 using Polarized Light Microscopy (PLM) in accordance with the EPA Method 600/R-93/116. CA Labs is accredited through the National Institute of Standards and Technology’s (NIST) National Voluntary Laboratory Accred itation Program (NVLAP). The point-counting technique employed by CA Labs in the analysis of these samples has a limit of detection of approximately 0.1% by volume on samples that contained asbestos at concentrations under 1%.
One HA sampled during the inspection was determined by laboratory analysis to contain asbestos in quantities greater than 1%, as shown in Table 1 below. The analytical report provided by CA Labs is provided in Appendix C. Sample identification and locations are shown on Figure 1 in Appendix D.
Also shown in Table 1 is a Condition Ranking as detailed in the Malmstrom Air Force Base
Asbestos Management and Operations Plan. The plan lists four rankings as provided by Mr.
Robert Richards. These are detailed below:
• Ranking 1: Asbestos is damaged and poses a health hazard.
• Ranking 2: Asbestos is damaged but does not pose an immediate health hazard.
• Ranking 3: Asbestos is in good condition, does not pose a hazard, but is vulnerable to damage or wear.
• Ranking 4: Asbestos is in good condition and does not pose a hazard under normal conditions.
May 6, 2024 PAGE NO. 3
Table 1
Asbestos-Containing Building Materials
PA Office, Building 500, MAFB, Montana
Homogenous Area Description
Asbestos Content
NESHAP
Category
Condition Ranking
Approximate Quantity Location
M2.1 Black and Tan Mastic
2% Chrysotile Category I 4 200 Square
Feet Closet/
Exit
All other HAs are listed as “None Detected” and are shown in Table 2. The analytical report provided by CA Labs is provided in Appendix C, and sample locations are shown on Figure 1 in Appendix D.
Table 2
Non-Asbestos-Containing Building Materials
PA Office, Building 500, MAFB, Montana
Homogenous Area (HA) Sample Description Location
M4.1 Blue Carpet/ Tan Mastic All Rooms
M6.1 Blue Cove Base/ Tan Mastic All Rooms Except Kitchen and Exit
M6.2 Gray Cove Base/ Tan Mastic Kitchen and Exit
F2.1 Tan Floor Tile Closet/ Exit
Following receipt of the laboratory report, building materials containing asbestos were placed into one of the following three categories using NESHAP criteria:
• Category I: Non-friable 1 asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products – all containing more than 1% asbestos.
• Category II: All non-friable materials containing more than 1% asbestos except those found in Category I.
• Regulated Asbestos-Containing Materials (RACM): Friable materials, Category I non-friable materials that will or may be subjected to sanding, grinding, cutting, or abrading; or Category II non-friable materials that have a high probability of becoming or have become crumbled, pulverized, or reduced to powder by forces expected to act on the material in the course of renovation/renovation operations.
According to NESHAP regulation 40 CFR 61.145 (c)(1)(i) and ARM 17.74, any RACM or Category I or II ACM that may be rendered friable during renovation or renovation activities must be properly abated prior to beginning the project, which must be overseen by someone with training as a “competent person” per OSHA. NESHAP also requires that any renovation or renovation activities be free of visible dust or fugitive emissions from any regulated substances, including asbestos. All building materials should be adequately wetted to
1 Friable means able to be crushed or reduced to powder by hand pressure when dry, or similarly broken or pulverized mechanically.
May 6, 2024 PAGE NO. 4 prevent the release of particulate. Depending on the type of renovation planned, OSHA and state regulations may require personal air monitoring and the use of engineering controls.
It is a requirement under NESHAP regulations that at least ten working days prior to an asbestos abatement project, a written notification must be provided to the EPA. In the State of Montana, notification of asbestos abatement is sent to the MDEQ, Permitting and Compliance Division – Asbestos Control Program.
RECOMMENDATIONS
The following recommendations for materials containing asbestos are based on our observations and the anticipated scope of renovation.
One area of ACM was identified.
The Category I black and tan mastic was non-friable at the time of the inspection and, if maintained in a non-friable state, may be removed in an unregulated fashion under state and federal law. Any grinding sawing, abrading, or pulverizing of the Category I or Category II -containing material will render those materials friable and regulated (RCAM).
Per OSHA, asbestos removal for Category I or II ACM in a non-friable “intact” condition must be overseen by a “competent person” holding current Montana accreditation as an Asbestos Contractor/Supervisor. If these materials are removed in a non-friable manner, asbestos abatement permitting will not be required. Limited air monitoring may be necessary for OSHA compliance.
Asbestos abatement for RACM must be performed by a Montana-accredited abatement contractor. All personnel involved in the disturbance or removal of building components assumed to contain asbestos, or identified as asbestos containing, must be trained according to the requirements set forth in 29 CFR 1926.1101 (k)(9) and 75-2-511, Montana Code Annotated (MCA).
The MDEQ considers all categories of asbestos-containing material to be “special waste” under Montana Solid Waste Rules. Transport of RACM waste is regulated and will require a permit. RACM waste must also be segregated from the general renovation waste for disposal in the designated asbestos disposal area at a local landfill that is licensed to accept asbestos-containing material. Many landfills require that all categories of ACM be segregated from the general demolition waste stream. RACM must be double-bagged or double-wrapped in 6-mil plastic sheeting; non-RACM may be single-wrapped. All material must be wrapped “burrito style” with taped seams. The name and contact information of the owner must be provided on each waste package. We recommend that potential landfills be contacted prior to bidding or disposal for clarification of disposal requirements.
Malmstrom Air Force Base Asbestos Management and Operations Plan as described above also includes recommendations for performing Operations and Maintenance (O&M) for each
HA identified as ACM. The recommendations as supplied by Mr. Richards are as follows:
May 6, 2024 PAGE NO. 5
• Ranking 1: Coordinate immediate removal or abatement.
• Ranking 2: Qualified personnel to control or encapsulate as soon as possible.
• Ranking 3: Schedule periodic re-inspection to ensure the area remains stable. This applies particularly to potentially friable asbestos, such as mechanical room TSI.
• Ranking 4: Schedule periodic re-inspection to ensure the area remains stable.
As listed in Table 1, the ACM received a Condition 4 Ranking. The recommended O&M ranking will also be Ranking 4.
LIMITATIONS
This asbestos inspection report was prepared based on information gathered during one site visit and interpretations of laboratory analytical results provided by CA Labs. The inspection report is intended to provide information concerning the various types of building materials that were considered suspected of containing asbestos and to inform MAFB of which building materials tested positive.
Most building components were visible and accessible at the time of our site visit. Additional suspect materials may be encountered during renovations activities. If work will disturb materials in addition to those included in this report, TD&H should be contacted and may need to be present during these activities.
This asbestos inspection report is intended for use by MAFB and their clients. The scope of services performed by TD&H may not be appropriate to satisfy the needs of other users, and any use or re-use of this document, or the findings presented herein, is at the sole risk of the user.
CLOSING
We appreciate this opportunity to provide these industrial hygiene-consulting services to you and look forward to assisting you through the remainder of the project. Should you have questions or need further clarification about information contained herein, please feel free to contact us at (406) 761-3010.
May 6, 2024 PAGE NO. 6
APPENDICES: A ASBESTOS INSPECTION SUMMARY
B DOCUMENTATION OF ACCREDITATION
C ASBESTOS LABORATORY REPORT
D ASBESTOS SAMPLE LOCATIONS
I:\2024\GTF\24-083 MAFB IH 2024\05_DESIGN\IND HYGIENE\071\24-083-071 MAFB Building 500 PA_Asbestos Inspection Report.docx
APPENDIX A
TD&H Engineering (TD&H) performed a limited asbestos inspection within the PA office of Building 500, Malmstrom Air Force Base (MAFB) on May 2, 2024. The purpose of the pre-renovation inspection was to assess building materials suspected of containing asbestos within the floor of PA office of Building 500.
The inspection was performed by Mr. Kyle A. Groves of TD&H, a technician Montana-accredited asbestos inspectors, in accordance with the U.S. Environmental Protection Agency (EPA) – Asbestos Hazards and Emergency Response Act (AHERA) regulation 40
CFR 763.
The following building material contained asbestos in quantities greater than 1%:
▪ Black and tan mastic under non-asbestos tan floor tile.
TD&H Project No: 24-083-071
Report Issue Date: May 8, 2024
I : \2024\GTF\ 24 -083 MAFB IH 2024 \05_DESIGN\ IND HYGIENE\071\APPENDIX\A_ASBESTOS
INSPECTION SUMMARY\WORKING\A1_ASBESTOS SUMMARY PAGE.DOCX
APPENDIX B
DOCUMENTATION OF ACCREDITATION
has met the requirements of Montana Administrative Rule
17.74.362 and/or 17.74.363 for accreditation in the following asbestos occupation(s) through the specified expiration date(s).
KYLE A GROVES
K Y
L E
A G
R O
V E
S
S M
A N
C H
E C
T E
R R
D G
R E
A T
F A
L L
S M
T
MTA-6137
Asbestos Inspector Project Contractor/Supervisor
11/17/2024 11/16/2024
MT DEQ Asbestos Control Program has met the requirements of Montana Administrative Rule
17.74.362 and/or 17.74.363 for accreditation in the following asbestos occupation(s) through the specified expiration date(s).
HOMER C LEAGUE
H O
M E
R C
L E
A G
U E
R
IV
E R
D R
IV
E
N O
R T
H G
R E
A T
F A
L L
S M
T
MTA-5902
Asbestos Inspector Project Contractor/Supervisor Project Designer
11/17/2024 11/16/2024 12/13/2024
MT DEQ Asbestos Control Program
APPENDIX C
ASBESTOS LABORATORY REPORT
Attn:
Customer Project:
Reference #: Date: 5/3/2024
Analysis and Method
Discussion
Qualifications
Some samples (floor tiles, surfacings, etc.) may contain fibers too small to be detectable by PLM analysis and should be analyzed by TEM bulk protocols.
A "trace asbestos" will be reported if the analyst observes far less than 1% asbestos. CA Labs defines "trace asbestos" as a few fibers detected by the analyst in several preparations and will indicate as such under these circumstances.
Quantification of <1% will actually be reported as <=1% (allowable variance close to 1% is high). Such results are ideal for point counting, and the technique is mandatory for friable samples (NESHAP, Nov. 1990 and clarification letter 8 May 1991) under 1% percent asbestos and the "trace asbestos". In order to make all initial PLM reports issued from CA Labs NESHAP compliant, all <1% asbestos results (except floor tiles) will be point counted at no additional charge.
CA Labs is accredited by the National Voluntary Accreditation Program (NVLAP) for selected test methods for airborne fiber analysis (TEM), and for bulk asbestos fiber analysis (PLM). All analysts have a college degree in a natural science (geology, biology, or environmental science) or are recognized by a state professional board in one these disciplines .Extensive in-house training programs are used to augment education background of the analyst. The group leader of polarized light has received supplemental McCrone Research training for asbestos identification. This report is not covered by the scope of AIHA accreditation. Analysis performed at CA Labs, LLC 12232 Industriplex, Suite 32 Baton Rouge, LA 70809.
1800 River Drive North
Great Falls, MT 59401 MAFB PA Office
CBR24052980
Summary of polarizing light microscopy (PLM / Stereomicroscopy bulk asbestos analysis) using the methods described in 40CFR Part 763
Appendix E to Subpart E (Interim and EPA 600 / R-93 / 116 (Improved). The sample is first viewed with the aid of stereomicroscopy. Numerous liquid slide preparations are created for analysis under the polarized microscope where identifications and quantifications are preformed. Calibrated liquid refractive oils are used as liquid mouting medium. These oils are used for identification (dispersion staining). A calibrated visual estimation is reported, should any asbestiform mineral be present. Other techniques such as acid washing are used in conjugation with refractive oils for detection of smaller quantities of asbestos. All asbestos percentages are based on calibrated visual estimation traceable to NIST standards for regulated of asbestos. Traceability to measurement and calibration is achieved by using known amounts and types of asbestos from standards where analyst and laboratory accuracy are measured. As little as 0.001% asbestos can be detected in favorable samples, while detection in unfavorable samples may approach the detection limit of 0.50% (well above the laboratory definition of trace).
Vermiculite containing samples may have trace amounts of actinolite-tremolite, where not found be PLM should be analyzed using TEM methods and / or water separation techniques. Suspected actinolite/vermiculite presence will be indicated through the sample comment section of this report.
Fibrous talc containing samples may even contain a related asbestos fiber known as anthophyllite. Under certain conditions the same fiber may actually contain both talc and anthophyllite (a phenomenon called intergrowth). Again, TEM detection methods are recommended. CA Labs PLM report comments will denote suspected amounts of asbestiform anthophyllite with talc, where further analysis is recommended.
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Materials Characterization - Bulk Asbestos Analysis Laboratory Analysis Report - Polarized Light
TD & H Engineering Corey League
Labs
A
C
Overview of Project Sample Material Containing Asbestos
Customer Project: MAFB PA Office CA Labs Project #: CBR24052980
Black and Tan Mastic
Black Mastic
Glossary of abbreviations (non-asbestos fibers and non-fibrous minerals):
This report relates to the items tested. This report is not to be used by the customer to claim product certification, approval or endorsement by NVLAP, NIST, AIHA LAP, LLC, or any other agency of the federal government. This report may not be reproduced except in full without written permission from CA Labs. These results are submitted pursuant to CA Labs' current terms and sale, condition of sale, including the company's standard warranty and limitations of liability provisions and no responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report, CA Labs will store the samples for a period of ninety (90) days before discarding. A shipping or handling fee may be assessed for the return of any samples.
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot - other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay)
F2.1B,M2.1
B
F2.1B
,M2.1
B-1 Black Mastic 2% Chrysotile
F2.1C,M2.1
C
F2.1C
,M2.1
C-2 Black Mastic 2% Chrysotile
F2.1A,M2.1
A
F2.1A
,M2.1
A-3 Black and Tan Mastic 2% Chrysotile
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Sample # Layer
Analysts Physical Description of
Subsample
Asbestos type / calibrated visual estimate percent
List of Affected Building
Material Types
Labs
A
Polarized Light Asbestiform Materials Characterization
Customer Info: Attn: Customer Project:
5/3/2024
24 hr 5/3/2024
Phone # 5/2/2024
Fax # 24-083-071
Laboratory Director
Chris Williams
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
David Darby Senior Analyst
Analyst Alicia Stretz
100% qu, ma
Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:
M6.1A M6.1
A-1 Gray Cove Base Y None Detected
100% sy
M4.1
C-2 Tan Mastic Y None Detected 100% qu, bi
M4.1C M4.1
C-1 Blue Carpet Y None Detected
100% sy
M4.1
B-2 Tan Mastic Y None Detected 100% qu, bi
M4.1B M4.1
B-1 Blue Carpet Y None Detected
M4.1
A-2 Tan Mastic Y None Detected 100% qu, bi
Asbestos type / calibrated visual estimate percent
Non-asbestos fiber type / percent
Non-fibrous type
/ percent
M4.1A M4.1
A-1 Blue Carpet Y None Detected 100% sy
406-761-3010 Date Of Sampling:
406-727-2872 Purchase Order #:
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
TD & H Engineering MAFB PA Office CBR24052980
1800 River Drive North
Great Falls, MT 59401 Date:
Turnaround Time: Samples Received:
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Corey League CA Labs Project #:
Labs
A
5/3/2024
24 hr 5/3/2024
Phone # 5/2/2024
Fax # 24-083-071
Laboratory Director
Chris Williams
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
David Darby Senior Analyst
Analyst Alicia Stretz
100% qu, bi
Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:
M6.2
A-2 Tan Mastic Y None Detected
100% qu, bi
M6.2A M6.2
A-1 Gray Cove Base Y None Detected 100% qu, ma
M6.1
C-2 White Mastic Y None Detected
100% qu, bi
M6.1C M6.1
C-1 Gray Cove Base Y None Detected 100% qu, ma
M6.1
B-2 White Mastic Y None Detected
100% qu, bi
M6.1B M6.1
B-1 Gray Cove Base Y None Detected 100% qu, ma
Asbestos type / calibrated visual estimate percent
Non-asbestos fiber type / percent
Non-fibrous type
/ percent
M6.1
A-2 White Mastic Y None Detected
406-761-3010 Date Of Sampling:
406-727-2872 Purchase Order #:
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
TD & H Engineering MAFB PA Office CBR24052980
1800 River Drive North
Great Falls, MT 59401 Date:
Turnaround Time: Samples Received:
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Corey League CA Labs Project #:
Labs
A
5/3/2024
24 hr 5/3/2024
Phone # 5/2/2024
Fax # 24-083-071
Laboratory Director
Chris Williams
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
David Darby Senior Analyst
Analyst Alicia Stretz
98% qu, bi
Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:
F2.1A
,M2.1
A-3 Black and Tan Mastic N 2% Chrysotile
100% qu, bi
F2.1A
,M2.1
A-2 Tan Floor Tile Y None Detected 100% qu, ca
F2.1A,M2.1
A
F2.1A
,M2.1
A-1 Black Mastic Y None Detected
100% qu, ma
M6.2
C-2 Tan Mastic Y None Detected 100% qu, bi
M6.2C M6.2
C-1 Gray Cove Base Y None Detected
100% qu, ma
M6.2
B-2 Tan Mastic Y None Detected 100% qu, bi
Asbestos type / calibrated visual estimate percent
Non-asbestos fiber type / percent
Non-fibrous type
/ percent
M6.2B M6.2
B-1 Gray Cove Base Y None Detected
406-761-3010 Date Of Sampling:
406-727-2872 Purchase Order #:
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
TD & H Engineering MAFB PA Office CBR24052980
1800 River Drive North
Great Falls, MT 59401 Date:
Turnaround Time: Samples Received:
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Corey League CA Labs Project #:
Labs
A
5/3/2024
24 hr 5/3/2024
Phone # 5/2/2024
Fax # 24-083-071
Laboratory Director
Chris Williams
1. Fire Damage significant fiber damage - reported percentages reflect unaltered fibers
2. Fire Damage no significant fiber damages effecting fibrous percentages
3. Actinolite in association with Vermiculite
4. Layer not analyzed - attached to previous positive layer and contamination is suspected
5. Not enough sample to analyze
6. Anthophyllite in association with Fibrous Talc
7. Contamination suspected from other building materials
8. Favorable scenario for water separation on vermiculite for possible analysis by another method
9. < 1% Result point counted positive
10. TEM analysis suggested
David Darby Senior Analyst
Analyst Alicia Stretz
98% qu, bi
Analysis Method: Interim (40CFR Part 763 Appendix E to Subpart E) / Improved (EPA-600 / R-93/116)
Preparation Method: HCL acid washing for carbonate based samples, chemical reduction for organically bound components, oil immersion for identification of asbestos types by dispersion attaining / becke line method.
ca - carbonate gypsum - gypsum bi - binder or - organic ma - matrix mi - mica ve - vermiculite ot -other pe - perlite qu - quartz fg - fiberglass mw - mineral wool wo - wollastinite ta - talc sy - synthetic ce - cellulose br - brucite ka - kaolin (clay) pa - palygorskite (clay) Approved Signatories:
F2.1C
,M2.1
C-2 Black Mastic Y 2% Chrysotile
100% qu, bi
F2.1C,M2.1
C
F2.1C
,M2.1
C-1 Tan Floor Tile Y None Detected 100% qu, ca
F2.1B
,M2.1
B-3 Tan Mastic Y None Detected
98% qu, bi
F2.1B
,M2.1
B-2 Tan Floor Tile Y None Detected 100% qu, ca
Asbestos type / calibrated visual estimate percent
Non-asbestos fiber type / percent
Non-fibrous type
/ percent
F2.1B,M2.1
B
F2.1B
,M2.1
B-1 Black Mastic Y 2% Chrysotile
406-761-3010 Date Of Sampling:
406-727-2872 Purchase Order #:
Sample # Com ment
Layer
Analysts Physical Description of
Subsample
Homo-geneo us
(Y/N)
TD & H Engineering MAFB PA Office CBR24052980
1800 River Drive North
Great Falls, MT 59401 Date:
Turnaround Time: Samples Received:
CA Labs
Dedicated to
Quality
CA Labs, L.L.C.
12232 Industriplex, Suite 32
Baton Rouge, LA 70809
Phone 225-751-5632
Fax 225-751-5634
NVLAP #200772-0
TDSHS #300370
CDPHE #AL-18111
LELAP #03069
Corey League CA Labs Project #:
Labs
A
APPENDIX D
ASBESTOS SAMPLE LOCATIONS
DRAWING3
NOT FOR
CONSTRUCTION
.DWG
En gi ne er in g td he ng in ee rin g.
co m
PA
O ffi ce M
AF
B
Bu ild in g i ha rt
[520 ask |] \ o
L=3E] iste of
| =A [535 | YY
A a a
TD
&H ji Fi gu re
M4.1.C M6.1.B M4.1.A
M6.1.C
M6.2.B
M6.1.A
M6.2.A
M4.1.B
M6.2.C
M2.1.A, M2.1.B, M2.1.C
0.0X
0.0X Non Asbestos-Containing Material
Asbestos-Containing Material
LEGEND
Room Number##
Limits of Inspection
F2.1.A, F2.1.B, F2.1.C
| D1_11x17 Sample Locations.pdf |
| Sheets and Views |
| Unsaved Drawing-Layout1 |
df-11
File details come from the government source that posted it. Updated .