Opportunity # 1065778 Hurlburt Field 26 February 2021 Repair Road Drainage and Stormdrain STATEMENT OF WORK
PART 1 GENERAL
1.01 WORK INCLUDED
1. The contractor shall furnish all labor, materials, tools, supervision and equipment and perform all operations necessary to accomplish all work complete in place, as shown on the contract drawings, specified herein, or as needed to repair the pavement and storm water drainage at the intersection of Walkup Way and Independence Rd. The work shall be fully complete in accordance with the Contract Documents. The project is located on Hurlburt Field, FL.
1.02 RELATED CONTRACT DOCUMENT
1. Civil Works IDIQ Specifications.
2. UFC Specifications.
3. Site Plans.
4. Site Location and Utility Map.
5. OSHA Safety Regulations.
1.03 WORK DESCRIPTION
1. The work to be performed includes, but is not necessarily limited to, the following principal features:
A. Remove existing concrete, storm drain grates, and part of the asphalt pavement as shown in the drawings.
B. Install new 8” diameter Ductile Iron Pipe storm drain and connect to the existing 18” RCP with new inlet and junction box.
C. Place new asphalt pavement to promote drainage towards new curb inlet.
D. Repaint white crosswalk lines, 18” wide and white stop bar, 24” wide.
E. Sod all areas disturbed by construction.
1.04 SUBMITTALS
1. The Specifications are the governing document in determining the required submittal items.
1.05 CONTRACTOR USE OF SITE AND PREMISES
1. The construction site shall be kept neat and orderly at all times. The contractor shall remove debris from the site on a daily basis.
1.06 DISPOSAL
1. All demolition materials and debris shall be loaded onto trucks immediately for removal from site as required. It shall be the responsibility of the contractor to provide the trucks and for the selection of the dumpsite. Provide Contracting Officer with name of approved dumpsite, if requested.
1.07 STORAGE AREA
1. Storage area or areas will be coordinated at the Pre-Construction conference.
2. The Contractor is solely responsible for the security of materials located within the storage area.
1.08 SAFETY
1. The pertinent sections of the following publications are applicable to all work on this project.
A. U.S. Army Corps of Engineers: EM 385-1-1, Safety and Health Requirements Manual.
B. Air Force Instruction (AFI) 91-301.
2. The Contractor shall safety barricade as necessary all excavations and hazards.
1.09 HAUL ROUTE
1. The Contractor shall utilize the most direct route to the delivery point.
1.010 PERMITS
1. AF Form 103, Civil Engineering Work Clearance Request
2. ERP 62-330, Environmental Resource Permit if project does not meet exemption criteria.
3. NPDES 62-621 General Permit for Construction Activity requiring a Storm Water Pollution Prevention
Plan if project disturbs 1 acre or more of land.
Opportunity # 1065778 Hurlburt Field 26 February 2021 Repair Road Drainage and Stormdrain STATEMENT OF WORK
4. Dewatering 62-621, Permit for Discharge of Groundwater, if dewatering is necessary.
1.011 PHASING AND TRAFFIC CONTROL
1. The Contractor shall work continuously and sequentially on this project.
2. The Contractor will submit a proposed project schedule for approval within 5 calendar days of the Notice to Proceed.
PART 2 PRODUCTS
2.01 ACCEPTABLE MATERIALS
1. Contractor shall refer to the IDIQ specifications for guidance in selecting appropriate materials to accomplish the work.
2.02 ALTERNATIVE MATERIALS
1. If Contractor suggests the use of a specific material not listed in the specifications, which the Government might consider to lessen the cost or increase the utility or appearance of the facility, the contractor may submit that material listed as a substitution for the Government to evaluate.
PART 3 EXECUTION
3.01 INSPECTION
1. The contractor shall make a representative available to the Government on site to answer questions, which may arise.
2. The Government representatives will be allowed free access to the site in its entirety.
3.02 HOURS OF WORK
1. The normal hours of a workday shall be between 8:00 A.M. and 4:00 P.M., Monday through Friday, except holidays. The contractor may elect, at his option, to work hours other than normal duty hours if approved by the Contracting Officer. All work time, other than normal working days, shall be requested in writing, 3 days in advance.
3.03 PHOTOGRAPHS
1. Photographs are not required to be submitted but are highly recommended to take before and after photographs. No photographs are allowed in the Airfield environment.
3.04 QUALITY CONTROL
1. The contractor shall establish and maintain quality control to assure compliance with Contract
Documents, and provide records of his quality control for materials, equipment and construction operations.
2. The Contractor is solely responsible for quality control on this project. A quality control representative will be appointed by the Contractor and will be on-site daily to assure the work accomplished meets the specifications.
3.05 AS-BUILT DRAWINGS
1. No as-built drawings are required.
END OF DELIVERY ORDER