Attch 6 Pricing Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Hayden Peak Radio Facility Remediation
- Solicitation number
- 140L0621R0008
About this file
This document contains a pricing worksheet for the Hayden Peak Radio Facility Remediation solicitation issued by the Department of the Interior Bureau of Land Management. The solicitation seeks pricing for geotechnical investigation and reporting, tower foundation rock anchor modification design, third party inspection services, tower remediation design, helicopter material delivery, rock anchor installation including coring, grouting and concrete work, rock anchor testing and inspections. Also required are pricing for grounding work including achieving a ground resistance of 10 ohms or less, installing ground electrical H-frame posts, self-supporting ice-bridge grounding, and grounding system installation. The pricing worksheet also requests overhead, profit and bonding costs. The total project cost should be included. Solicitation number 140L0621R0008 has been issued for this opportunity.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| U.S. Department of the Interior | |||
| Bureau of Land Management | |||
| Hayden Peak Radio Facility Remediation | |||
| Solicitation Number 140L0621R0008 | |||
| Bid Item | Specifications Paragraph | Drawing Reference | Price |
| Additional Geotechnical Investigation and Report | 2.5 | N/A | $ |
| Modification Design for Tower Foudation Rock Anchors | 2.5 | S1 | $ |
| Third Party Inspector | 2.3 | N/A | $ |
| Tower Remediation Design Subtotal | $ | ||
| Helicopter Lift for Material Delivery to Site | 3.12 | N/A | $ |
| Rock Anchor Installation (Includes core drilling, grout, and concrete) | 3.12 | S1 | $ |
| Rock Anchor Testing and Inspections | 3.12 | S2 | $ |
| Tower Remediation Subtotal | $ | ||
| Ground Resistance (10 Ohms or less) | 3.14 | 10 | $ |
| Ground Electrical H-Frame Posts | 3.14 | 13 | $ |
| Self-Supporting Ice-Bridge Grounding | 3.14 | 14 | $ |
| Grounding System Installation Subtotal | $ | ||
| Mobilization | N/A | N/A | $ |
| Overhead | N/A | N/A | $ |
| Profit | N/A | N/A | $ |
| Bonding | N/A | N/A | $ |
| Contractor Fees Subtotal | $ |
Project Grand Total $
File details come from the government source that posted it. Updated .