Attch_6_-_Limitations_on_Subcontracting_Report.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- Fubar Detention Dam Decommissioning Federal contract opportunity
- Solicitation number
- 140L0622R0004
About this file
This document is a template for tracking compliance with limitations on subcontracting requirements on a federal contract. The template is for a total small business set-aside contract with the Department of the Interior Bureau of Land Management for the Fubar Detention Dam Decommissioning project with a 365 calendar day period of performance. The template requires contractors to track the total amount proposed, total material costs, self-performed labor costs, amounts paid to small business subcontractors, and amounts paid to large business subcontractors to calculate the limitation on subcontracting percentage and ensure it meets the required 15% minimum self-performance threshold. Contractors must input company and dollar amount details for any first through sixth small business and large business subcontractors used on the contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_10_-_FubarDam_Site_Visit_List__Q_A_0003.pdf | ||
| Sol_140L0622R0004_Amd_0003.pdf | ||
| Attch_9_-_FubarDam_TechSpecs_REV_0003.pdf | ||
| Sol_140L0622R0004_Amd_0002.pdf | ||
| Attch_8_-_Amend_0001_140L0622R0004_-_Cont__Pages_REV_0001.pdf | ||
| Sol_140L0622R0004_Amd_0001.pdf | ||
| Attch_4_-_FubarDam_Wage_Determinations.pdf | ||
| Attch_5_-_FubarDam_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attch_2_-_FubarDam_TechSpecs.pdf | ||
| Attch_1_-_FubarDam_Drawings.pdf | ||
| Attch_3_-_FubarDam_CM1_E-TransmittalForm.xlsx | XLSX spreadsheet | |
| Attch_7_-_SF1442_Completion_Instructions.pdf | ||
| Sol_140L0622R0004.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0622R0004 - Fubar Detention Dam Decommissioning |
| Type of Set Aside | Total Small Business |
| Performance Period | 365 Calendar Days |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .