Attch_6_-_Limitations_on_Subcontracting_Report.xlsx

XLSX spreadsheet 93 KB Posted

Attached to
Fubar Detention Dam Decommissioning Federal contract opportunity
Solicitation number
140L0622R0004
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is a template for tracking compliance with limitations on subcontracting requirements on a federal contract. The template is for a total small business set-aside contract with the Department of the Interior Bureau of Land Management for the Fubar Detention Dam Decommissioning project with a 365 calendar day period of performance. The template requires contractors to track the total amount proposed, total material costs, self-performed labor costs, amounts paid to small business subcontractors, and amounts paid to large business subcontractors to calculate the limitation on subcontracting percentage and ensure it meets the required 15% minimum self-performance threshold. Contractors must input company and dollar amount details for any first through sixth small business and large business subcontractors used on the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Fubar Detention Dam Decommissioning, newest first.
File Type Posted
Attch_10_-_FubarDam_Site_Visit_List__Q_A_0003.pdf PDF
Sol_140L0622R0004_Amd_0003.pdf PDF
Attch_9_-_FubarDam_TechSpecs_REV_0003.pdf PDF
Sol_140L0622R0004_Amd_0002.pdf PDF
Attch_8_-_Amend_0001_140L0622R0004_-_Cont__Pages_REV_0001.pdf PDF
Sol_140L0622R0004_Amd_0001.pdf PDF
Attch_4_-_FubarDam_Wage_Determinations.pdf PDF
Attch_5_-_FubarDam_Price_Schedule.xlsx XLSX spreadsheet
Attch_2_-_FubarDam_TechSpecs.pdf PDF
Attch_1_-_FubarDam_Drawings.pdf PDF
Attch_3_-_FubarDam_CM1_E-TransmittalForm.xlsx XLSX spreadsheet
Attch_7_-_SF1442_Completion_Instructions.pdf PDF
Sol_140L0622R0004.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0622R0004 - Fubar Detention Dam Decommissioning
Type of Set AsideTotal Small Business
Performance Period365 Calendar Days
Required Self-Performance15%

(A) Total Amount Proposed*

(B) Total Material Cost

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost $0.00

(G) Limitation on Subcontracting Percentage*
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) = (B) + (F)
*Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .