Attch_5_-_FubarDam_Price_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Fubar Detention Dam Decommissioning
Solicitation number
140L0622R0004
Issued by

About this file

This document contains a price schedule attachment for the Fubar Dam Detention Dam Decommissioning federal contract opportunity. The price schedule lists 17 line items with descriptions and estimated quantities for various work required to decommission the dam. Pricing must be provided by contractors for each line item as well as a total bid price. Quantities listed are estimates and payments will be based on actual measured work. The related federal contract opportunity is solicitation number 140L0622R0004 issued by the Department of the Interior Bureau of Land Management National Office to decommission the Fubar Detention Dam. Bids are due based on the terms of the solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fubar Dam

FUBAR DETENTION DAM DECOMMISSIONING
SCHEDULE OF ITEMS
Item
No.DescriptionQuantity*0Unit PriceTotal Cost
1Mobilization and Preparatory Work1LS
2Topsoil Stripping and Restoration1LS
3Existing Outlet Demolition1LS
4Excavation*13,514CY
5Muck Excavation1,500CY
6Compacted Backfill*4,091CY
7Gravel Fill602CY
8Rock Fill640Ton
9Dike Fill*2,288CY
10Precast Concrete Block Channel1LS
11Inlet Structure1LS
12Stilling Basin1LS
13Salvage and Replace Riprap770Ton
14Vehicle Barricades1LS
15Water Control/Dewatering1LS
16Access Road1LS
17Wire Fencing and Gates1LS
TOTAL BID
TOTAL BID PRICE
Total Price (words):

*Quantities are not guaranteed. Measurement and payment for each Price Item is defined in Section 01150, Measurement and Payment. All measured items are estimated and subject to contract clauses 52.211-18, Variation in Estimated Quantity and 52.236-16, Alt. 1 Quantity Suveys.

Pricing offered must include all materials, equipment, supplies, appurtenances; all construction plant, equipment, and tools; all labor and supervision, profit and overhead necessary to fully complete the work. Bonds and insurance costs shall be included in the mobilization line item.

&"Arial,Regular"&8&Z&F &"Arial,Regular"&9BID SCHEDULE&"MS Sans Serif,Regular"&8

File details come from the government source that posted it. Updated .