Attch 5 Submittal Register.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- B777 MAINTAIN GYM & AEROBICS ROOMS FLOOR
- Solicitation number
- FA663326Q0002
About this file
This is a Material Submittals Schedule template for tracking contractor submissions throughout the project execution phase. The schedule is designed for Project Number QJKL220004, titled "Repair Gym and Aerobics Areas Flooring, B777," and serves as a management tool for the 934th Airlift Wing, Minneapolis-St Paul ARS. The document provides a structured format for the Contract Administrator and Project Engineer to monitor and document all required material submittals, including baseline construction schedules, certificates of compliance, product data sheets, and specifications for sealants, primers, clear coat, and paint for markings. Each submittal line item tracks critical dates including the contractor's required submission date, receipt date in contracting, forwarding date to Civil Engineering for review, return suspense date from Civil Engineering, final approval date, and notification dates for both approval and disapproval actions.
The template establishes a systematic workflow for managing submittals with columns designated for submittal numbers, resubmittal tracking, and approval documentation. Fifteen line items are allocated for various submittals, with rows pre-populated for baseline construction schedule, certificates, monthly updates, pre-construction schedule submittal register, and product data categories for sealants, primers, clear coat, and paint markings. The document is formatted for legal-size paper (8" x 14") and requires completion by project personnel. As an administrative template, this document does not establish specific response deadlines, pricing information, or award criteria but rather provides the procedural framework for managing contractor compliance with documentation requirements during the flooring repair and maintenance project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| QJKL220004 | Project Title: | ||
| Repair Gym and Aerobics Areas Flooring,B777 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | Baseline Construction Schedule | x | |||
| 2 | Certificates | x | |||
| 3 | Monthly Updates | x | |||
| 4 | PreconstructionSchedule: Submittal Register | x | |||
| 5 | Product Data | ||||
| 6 | a) Sealants | x | x | ||
| 7 | b) Primers | x | x | ||
| 8 | c) Clear Coat | x | x | ||
| 9 | d) Paint for markings | x | x | ||
| 10 | |||||
| 11 | |||||
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N