Attch 5 Submittal Register.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
B777 MAINTAIN GYM & AEROBICS ROOMS FLOOR
Solicitation number
FA663326Q0002
Issued by

About this file

This is a Material Submittals Schedule template for tracking contractor submissions throughout the project execution phase. The schedule is designed for Project Number QJKL220004, titled "Repair Gym and Aerobics Areas Flooring, B777," and serves as a management tool for the 934th Airlift Wing, Minneapolis-St Paul ARS. The document provides a structured format for the Contract Administrator and Project Engineer to monitor and document all required material submittals, including baseline construction schedules, certificates of compliance, product data sheets, and specifications for sealants, primers, clear coat, and paint for markings. Each submittal line item tracks critical dates including the contractor's required submission date, receipt date in contracting, forwarding date to Civil Engineering for review, return suspense date from Civil Engineering, final approval date, and notification dates for both approval and disapproval actions.

The template establishes a systematic workflow for managing submittals with columns designated for submittal numbers, resubmittal tracking, and approval documentation. Fifteen line items are allocated for various submittals, with rows pre-populated for baseline construction schedule, certificates, monthly updates, pre-construction schedule submittal register, and product data categories for sealants, primers, clear coat, and paint markings. The document is formatted for legal-size paper (8" x 14") and requires completion by project personnel. As an administrative template, this document does not establish specific response deadlines, pricing information, or award criteria but rather provides the procedural framework for managing contractor compliance with documentation requirements during the flooring repair and maintenance project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
QJKL220004Project Title:
Repair Gym and Aerobics Areas Flooring,B777Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1Baseline Construction Schedulex
2Certificatesx
3Monthly Updatesx
4PreconstructionSchedule: Submittal Registerx
5Product Data
6a) Sealantsxx
7b) Primersxx
8c) Clear Coatxx
9d) Paint for markingsxx
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).

&P of &N