This solicitation seeks proposals for a switch filter integrated microwave assembly. Interested offerors must submit a completed DD Form 2345 and may then receive Attachments 1 and 4 along with Exhibits A and B providing additional details. Questions are due by January 27, 2023 and proposals are due February 10, 2023. The Air Force will award one contract under this commercial solutions opening to obtain innovative solutions or potential new capabilities that fulfill requirements, close capability gaps, or provide potential technology advancements for Eglin Air Force Base, whether existing technologies or procedures not currently in use. The solicitation is issued by the Department of the Air Force Materiel Command Test Center. The included Attachment 3 provides a template for offerors to use to generate and submit a proposed statement of work in response, addressing objectives, scope, milestones, tasks, reliability and maintainability plans, key personnel, components, access requirements, government furnished equipment and information, deliverables, warranty terms, and risk factors and mitigation strategies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch I - Eglin CSO (FA2487-23-S-C003) (V3).pdf | ||
| Attch I - Eglin CSO (FA2487-23-S-C003) (V2).pdf | ||
| Attch 2 - Reps Certs (V1).pdf | ||
| Attch I - Eglin CSO (FA2487-23-S-C003) (V1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2487-23-S-C003
Attachment 3
STATEMENT OF WORK (SOW) TEMPLATE
TO BE USED BY CONTRACTORS TO GENERATE AND SUBMIT A PROPOSED
SOW IN RESPONSE TO COMMERCIAL SOLUTIONS OPENING (CSO) TOPIC EAFB-
Contractor SOW shall use this structure and address each section.
Contractor shall enter “Not Applicable” in a particular section as needed.
Section 1 - Objective of Project and Measures of Project Success
Section 2 - Scope of Project
Section 3 – Key Project Management Milestones/Events
• First Article Milestones (To Include Milestone for Permitting Exercise of Production Option & Test Data Delivery Milestones)
• Production Milestones (To Include Test Data Delivery Milestones)
Section 4 - SOW Tasks for Meeting Technical and Production Requirements (list each by separate alpha/numeric paragraph) (Gov’t CDRLs contained in Exhibits A & B shall be referenced for delivery in the tasks)
• Language from the SOO may be incorporated as needed
• Demonstrate ability to meet objectives outlined in the SOO
Section 5 – Reliability and Maintainability Plan
Section 6 – List of Key Personnel and Citizenship as well as Number of Hours Dedicated to the Project (No pricing information shall be included)
Section 7 – List of Major Components and Test Equipment
Section 8 - Military Installation, Facility or Equipment Access Requirements
Due to military installation security requirements, any need to photograph, scan or create images of military aircraft or equipment shall be clearly stated.
Section 9 - Required Government Furnished Equipment (GFE) such as Test Equipment
Section 10 - Required Government Furnished Information (GFI) Including Technical Data
Due to military installation access requirements, only US citizens and legally admitted foreign nationals shall be used on this project.
Section 11 – Comprehensive List of Deliverable Items
Section 12 – Warranty Terms and Conditions
Section 13 - Potential Project Risk Factors & Management Regarding Cost, Schedule & Performance
FA2487-23-S-C003
Attachment 3
• Mitigation strategy for risks associated with material procurements and fabrication
• Mitigation strategy for risks associated with key personnel leaving the company
• Mitigation strategy for risks associated with not having sufficient equipment or expertise to test the specification
• Mitigation strategy for risks associated with not meeting the technical specification