Attch 2b Bid Schedule.xls
XLS spreadsheet 46 KB Posted
- Attached to
- 341 MW MISSILE CABLE EROSION AND CONDUIT REPAIR
- Solicitation number
- FA462620R0018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch 6 Subcontractor Consent_(Updated 8JUN20).doc | DOC document | |
| HICS Boring QA_1.pdf | ||
| Conformed_FA462620R00180001.pdf | ||
| Attch 8 Section M_(Updated 8JUN20).pdf | ||
| SF30_FA462620R00180001.pdf | ||
| Attch 7 Section L_(Updated 8JUN20).pdf | ||
| Attch 9 Past Performance Questionnaire.docx | DOCX document | |
| Attch 7 Section L.pdf | ||
| Attch 5 Installation Perimeter Access Ctrl.pdf | ||
| Attch 8 Section M.pdf | ||
| Attch 3 Submittal Schedule.xls | XLS spreadsheet | |
| Attch 4 Wage Determination.pdf | ||
| Attch 6 Subcontractor Consent.doc | DOC document | |
| Attch 2a Bid Schedule Description.pdf | ||
| Solicitation - FA462620R0018.pdf | ||
| Attach 1 Specs.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| BID SCHEDULE | ||||
| CONTRACT NUMBER: FA4626-20-R-0018 | ||||
| BASE PERIOD | ||||
| CLIN | SUB CLIN | DESCRIPTION | EST. | |
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 1 | AA | Bore Rig Mobilization | 5 | Each | |
| 1 | AB | Erosion Control Mobilization | 5 | Each | |
| 1 | AC | 4” Conduit | 550 | Linear Foot | |
| 1 | AD | 4” Conduit over 500 Feet | 65 | Linear Foot | |
| 1 | AE | 6” Conduit | 40 | Linear Foot | |
| 1 | AF | Directional Bore Clay 4” Conduit | 70 | Linear Foot | |
| 1 | AG | Directional Bore Clay 6”Conduit | 40 | Linear Foot | |
| 1 | AH | Directional Bore Clay 4”Conduit over 500 feet | 10 | Linear Foot | |
| 1 | AJ | Directional Bore Cobble 4” Conduit | 225 | Linear Foot | |
| 1 | AK | Directional Bore Cobble 6” Conduit | 10 | Linear Foot | |
| 1 | AL | Directional Bore Cobble 4” Conduit Over 500 Feet | 125 | Linear Foot | |
| 1 | AM | Directional Bore Rock 4” Conduit | 80 | Linear Foot | |
| 1 | AN | Directional Bore Rock 6” Conduit | 10 | Linear Foot | |
| 1 | AP | Directional Bore Rock 4” Conduit over 500 Feet | 102 | Linear Foot | |
| 1 | AQ | Directional Bore Shale 4” Conduit | 55 | Linear Foot | |
| 1 | AR | Directional Bore Shale 4” Conduit Over 500 Feet | 10 | Linear Foot | |
| 1 | AS | Directional Bore Shale 6” Conduit | 10 | Linear Foot | |
| 1 | AT | Class III Rip Rap | 160 | Cubic Yard | |
| 1 | AU | Class II Rip Rap | 130 | Cubic Yard | |
| 1 | AV | Class I Rip Rap | 60 | Cubic Yard | |
| 1 | AW | Rip Rap Hauling | 720 | Ton/Mile | |
| 1 | AX | Fill Dirt | 75 | Cubic Yard | |
| 1 | AY | Top Soil | 50 | Cubic Yard | |
| 1 | AZ | Erosion Repair under 50 CY | 1 | Each | |
| 1 | BA | Erosion Repair Over 50 Cubic Yards | 10 | Cubic Yard | |
| 1 | BB | Straw Wattle | 1 | Each | |
| 1 | BC | Bonding | 1 | Each | |
| TOTAL EST. EXTENDED AMOUNT - BASE PERIOD | |||||
| OPTION PERIOD 1 | |||||
| ITEM | SUB CLIN | DESCRIPTION | EST. | ||
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 1001 | AA | Bore Rig Mobilization | 5 | Each | |
| 1001 | AB | Erosion Control Mobilization | 5 | Each | |
| 1001 | AC | 4” Conduit | 550 | Linear Foot | |
| 1001 | AD | 4” Conduit over 500 Feet | 65 | Linear Foot | |
| 1001 | AE | 6” Conduit | 40 | Linear Foot | |
| 1001 | AF | Directional Bore Clay 4” Conduit | 70 | Linear Foot | |
| 1001 | AG | Directional Bore Clay 6”Conduit | 40 | Linear Foot | |
| 1001 | AH | Directional Bore Clay 4”Conduit over 500 feet | 10 | Linear Foot | |
| 1001 | AJ | Directional Bore Cobble 4” Conduit | 225 | Linear Foot | |
| 1001 | AK | Directional Bore Cobble 6” Conduit | 10 | Linear Foot | |
| 1001 | AL | Directional Bore Cobble 4” Conduit Over 500 Feet | 125 | Linear Foot | |
| 1001 | AM | Directional Bore Rock 4” Conduit | 80 | Linear Foot | |
| 1001 | AN | Directional Bore Rock 6” Conduit | 10 | Linear Foot | |
| 1001 | AP | Directional Bore Rock 4” Conduit over 500 Feet | 102 | Linear Foot | |
| 1001 | AQ | Directional Bore Shale 4” Conduit | 55 | Linear Foot | |
| 1001 | AR | Directional Bore Shale 4” Conduit Over 500 Feet | 10 | Linear Foot | |
| 1001 | AS | Directional Bore Shale 6” Conduit | 10 | Linear Foot | |
| 1001 | AT | Class III Rip Rap | 160 | Cubic Yard | |
| 1001 | AU | Class II Rip Rap | 130 | Cubic Yard | |
| 1001 | AV | Class I Rip Rap | 60 | Cubic Yard | |
| 1001 | AW | Rip Rap Hauling | 720 | Ton/Mile | |
| 1001 | AX | Fill Dirt | 75 | Cubic Yard | |
| 1001 | AY | Top Soil | 50 | Cubic Yard | |
| 1001 | AZ | Erosion Repair under 50 CY | 1 | Each | |
| 1001 | BA | Erosion Repair Over 50 Cubic Yards | 10 | Cubic Yard | |
| 1001 | BB | Straw Wattle | 1 | Each | |
| 1001 | BC | Bonding | 1 | Each | |
| TOTAL EST. EXTENDED AMOUNT - OPTION PERIOD 1 | |||||
| OPTION PERIOD 2 | |||||
| ITEM | SUB CLIN | DESCRIPTION | EST. | ||
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 2001 | AA | Bore Rig Mobilization | 5 | Each | |
| 2001 | AB | Erosion Control Mobilization | 5 | Each | |
| 2001 | AC | 4” Conduit | 550 | Linear Foot | |
| 2001 | AD | 4” Conduit over 500 Feet | 65 | Linear Foot | |
| 2001 | AE | 6” Conduit | 40 | Linear Foot | |
| 2001 | AF | Directional Bore Clay 4” Conduit | 70 | Linear Foot | |
| 2001 | AG | Directional Bore Clay 6”Conduit | 40 | Linear Foot | |
| 2001 | AH | Directional Bore Clay 4”Conduit over 500 feet | 10 | Linear Foot | |
| 2001 | AJ | Directional Bore Cobble 4” Conduit | 225 | Linear Foot | |
| 2001 | AK | Directional Bore Cobble 6” Conduit | 10 | Linear Foot | |
| 2001 | AL | Directional Bore Cobble 4” Conduit Over 500 Feet | 125 | Linear Foot | |
| 2001 | AM | Directional Bore Rock 4” Conduit | 80 | Linear Foot | |
| 2001 | AN | Directional Bore Rock 6” Conduit | 10 | Linear Foot | |
| 2001 | AP | Directional Bore Rock 4” Conduit over 500 Feet | 102 | Linear Foot | |
| 2001 | AQ | Directional Bore Shale 4” Conduit | 55 | Linear Foot | |
| 2001 | AR | Directional Bore Shale 4” Conduit Over 500 Feet | 10 | Linear Foot | |
| 2001 | AS | Directional Bore Shale 6” Conduit | 10 | Linear Foot | |
| 2001 | AT | Class III Rip Rap | 160 | Cubic Yard | |
| 2001 | AU | Class II Rip Rap | 130 | Cubic Yard | |
| 2001 | AV | Class I Rip Rap | 60 | Cubic Yard | |
| 2001 | AW | Rip Rap Hauling | 720 | Ton/Mile | |
| 2001 | AX | Fill Dirt | 75 | Cubic Yard | |
| 2001 | AY | Top Soil | 50 | Cubic Yard | |
| 2001 | AZ | Erosion Repair under 50 CY | 1 | Each | |
| 2001 | BA | Erosion Repair Over 50 Cubic Yards | 10 | Cubic Yard | |
| 2001 | BB | Straw Wattle | 1 | Each | |
| 2001 | BC | Bonding | 1 | Each | |
| TOTAL EST. EXTENDED AMOUNT - OPTION PERIOD 2 | |||||
| OPTION PERIOD 3 | |||||
| ITEM | SUB CLIN | DESCRIPTION | EST. | ||
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 3001 | AA | Bore Rig Mobilization | 5 | Each | |
| 3001 | AB | Erosion Control Mobilization | 5 | Each | |
| 3001 | AC | 4” Conduit | 550 | Linear Foot | |
| 3001 | AD | 4” Conduit over 500 Feet | 65 | Linear Foot | |
| 3001 | AE | 6” Conduit | 40 | Linear Foot | |
| 3001 | AF | Directional Bore Clay 4” Conduit | 70 | Linear Foot | |
| 3001 | AG | Directional Bore Clay 6”Conduit | 40 | Linear Foot | |
| 3001 | AH | Directional Bore Clay 4”Conduit over 500 feet | 10 | Linear Foot | |
| 3001 | AJ | Directional Bore Cobble 4” Conduit | 225 | Linear Foot | |
| 3001 | AK | Directional Bore Cobble 6” Conduit | 10 | Linear Foot | |
| 3001 | AL | Directional Bore Cobble 4” Conduit Over 500 Feet | 125 | Linear Foot | |
| 3001 | AM | Directional Bore Rock 4” Conduit | 80 | Linear Foot | |
| 3001 | AN | Directional Bore Rock 6” Conduit | 10 | Linear Foot | |
| 3001 | AP | Directional Bore Rock 4” Conduit over 500 Feet | 102 | Linear Foot | |
| 3001 | AQ | Directional Bore Shale 4” Conduit | 55 | Linear Foot | |
| 3001 | AR | Directional Bore Shale 4” Conduit Over 500 Feet | 10 | Linear Foot | |
| 3001 | AS | Directional Bore Shale 6” Conduit | 10 | Linear Foot | |
| 3001 | AT | Class III Rip Rap | 160 | Cubic Yard | |
| 3001 | AU | Class II Rip Rap | 130 | Cubic Yard | |
| 3001 | AV | Class I Rip Rap | 60 | Cubic Yard | |
| 3001 | AW | Rip Rap Hauling | 720 | Ton/Mile | |
| 3001 | AX | Fill Dirt | 75 | Cubic Yard | |
| 3001 | AY | Top Soil | 50 | Cubic Yard | |
| 3001 | AZ | Erosion Repair under 50 CY | 1 | Each | |
| 3001 | BA | Erosion Repair Over 50 Cubic Yards | 10 | Cubic Yard | |
| 3001 | BB | Straw Wattle | 1 | Each | |
| 3001 | BC | Bonding | 1 | Each | |
| TOTAL EST. EXTENDED AMOUNT - OPTION PERIOD 3 | |||||
| OPTION PERIOD 4 | |||||
| ITEM | SUB CLIN | DESCRIPTION | EST. | ||
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 4001 | AA | Bore Rig Mobilization | 5 | Each |
| 4001 | AB | Erosion Control Mobilization | 5 | Each |
| 4001 | AC | 4” Conduit | 550 | Linear Foot |
| 4001 | AD | 4” Conduit over 500 Feet | 65 | Linear Foot |
| 4001 | AE | 6” Conduit | 40 | Linear Foot |
| 4001 | AF | Directional Bore Clay 4” Conduit | 70 | Linear Foot |
| 4001 | AG | Directional Bore Clay 6”Conduit | 40 | Linear Foot |
| 4001 | AH | Directional Bore Clay 4”Conduit over 500 feet | 10 | Linear Foot |
| 4001 | AJ | Directional Bore Cobble 4” Conduit | 225 | Linear Foot |
| 4001 | AK | Directional Bore Cobble 6” Conduit | 10 | Linear Foot |
| 4001 | AL | Directional Bore Cobble 4” Conduit Over 500 Feet | 125 | Linear Foot |
| 4001 | AM | Directional Bore Rock 4” Conduit | 80 | Linear Foot |
| 4001 | AN | Directional Bore Rock 6” Conduit | 10 | Linear Foot |
| 4001 | AP | Directional Bore Rock 4” Conduit over 500 Feet | 102 | Linear Foot |
| 4001 | AQ | Directional Bore Shale 4” Conduit | 55 | Linear Foot |
| 4001 | AR | Directional Bore Shale 4” Conduit Over 500 Feet | 10 | Linear Foot |
| 4001 | AS | Directional Bore Shale 6” Conduit | 10 | Linear Foot |
| 4001 | AT | Class III Rip Rap | 160 | Cubic Yard |
| 4001 | AU | Class II Rip Rap | 130 | Cubic Yard |
| 4001 | AV | Class I Rip Rap | 60 | Cubic Yard |
| 4001 | AW | Rip Rap Hauling | 720 | Ton/Mile |
| 4001 | AX | Fill Dirt | 75 | Cubic Yard |
| 4001 | AY | Top Soil | 50 | Cubic Yard |
| 4001 | AZ | Erosion Repair under 50 CY | 1 | Each |
| 4001 | BA | Erosion Repair Over 50 Cubic Yards | 10 | Cubic Yard |
| 4001 | BB | Straw Wattle | 1 | Each |
| 4001 | BC | Bonding | 1 | Each |
| TOTAL EST. EXTENDED AMOUNT - OPTION PERIOD 4 | ||||
| TOTAL EST. EXTENDED AMOUNT (BASE + 4 OPTIONS) | ||||
| * NOTE: ESTIMATED QUANTITIES ARE HISTORICAL USAGE ESTIMATES AND ARE FOR BIDDING PURPOSES ONLY. THE ACTUAL QUANTITIES ORDERED ON THIS CONTRACT MAY DIFFER. THE UNIT PRICES PROVIDED BY CONTRACTORS WILL BE USED TO ESTABLISH PRICES FOR EACH TASK ORDER BASED ON ACTUAL QUANTITIES. |
&LAttachment 2b&RFA4626-20-R-0018 Page &P of &N
File details come from the government source that posted it. Updated .