Attch 2_Ellsworth Special Provisions Spec.pdf

PDF 228 KB Posted

Attached to
Roofing BPA Federal contract opportunity
Solicitation number
FA469021Q0029
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Roofing BPA, newest first.
File Type Posted
Attch 1_Price List (Blank).xlsx XLSX spreadsheet
Attch 4_Environmental Provisions Spec - Jan 16.pdf PDF
Attch 5_SD20210027 Meade.pdf PDF
Attch 6_SD20210029 Pennington.pdf PDF
Solicitation - FA469021Q0029.pdf PDF
Attch 3_Roofing Systems Maint and Repair Specs -15 Jan 16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELLSWORTH

AIR FORCE BASE

SOUTH DAKOTA

ELLSWORTH AIR FORCE BASE SPECIAL

PROVISIONS

28TH CIVIL ENGINEER SQUADRON

JANUARY 2016

SPECIFICATIONS

Section 01020

SECTION 01020

ELLSWORTH AIR FORCE BASE SPECIAL PROVISIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including other Specification Sections, apply to this Section.

1.2 SUMMARY

A. This section includes a list and description of special provisions required to operate on Ellsworth

AFB, SD.

1. Entry Authority Lists for Ellsworth Air Force Base, SD (EAFB, SD).

2. Visitor’s Pass.

3. Contractor’s Haul Route.

4. Work Schedule.

5. Mobile Phone.

6. Flightline Requirements.

7. Foreign Object Damage Prevention.

1.3 ENTRY AUTHORITY LISTS FOR ELLSWORTH AIR FORCE BASE, SD (EAFB, SD).

A. Entry Authority List (EAL): These lists are kept at the gates to verify employment. The following guidelines apply:

1. Original EAL and two (2) copies to the Contracting Office are required.

2. The EAL must be in alphabetical order, on company letterhead, containing the complete address and phone number of the company, signed by an authorized company representative, and in the following format: Request the following personnel be allowed access to the base (include contract number, project number, location of project, and building number) in performance of our contractual requirements:

EMPLOYEES DRIVERS COMPANY

LAST NAME, FIRST, MI LICENSE # NAME

3. DO NOT combine your EAL with the subcontractor’s EAL. Each company/subcontractor must have a separate EAL.

4. Additions/Deletions of Personnel: Submit, immediately, any additions or deletions to the Contracting Officer. Include only changes to the current EAL.

5. Escorts: An asterisk (*) on the EAL by key personnel such as a foreman or supervisor will allow temporary entry of supply deliveries/pickup/repair. The escorts must accompany these personnel the duration of time on the installation. A maximum of three (3) key personnel per prime contractor is allowed. A phone number where the escorts can be reached must be included on the

EAL.

6. Approximately seven (7) calendar days are required for processing of EALs.

1.4 VISITOR’S PASS (Air Force Form 75): The visitor’s pass is required for all employees and vehicles. It has two parts, one for placement on the driver’s side of the dashboard (must be visible at all times), the other part is issued to the individual and must be on his/her person at all times. Each employee must obtain this pass by presenting his/her drivers license, vehicle registration and proof of insurance at the Visitor Control Center, located outside the main gate. If any of the above identification is not on the employees person, he/she will be escorted off of base. It is recommended that a magnetic sign be placed on the left door of the vehicles that do not have a company logo.

Periodic spot checks of drivers licenses and AF 75’s will be conducted on a random basis. It is the responsibility of each employee to turn in the pass at the depository (on driver’s side of the gate as you depart the base) after completion of the contract(s).

1.5 CONTRACTOR’S HAUL ROUTES: Access to the project will be by the Commercial Gate on Monday thru Friday and the Main Base Gate on Saturday, Sunday, and holidays, thence over the haul route indicated in the Delivery Order (DO). The designated routes shall be used by both loaded and unloaded vehicles. Contractors must immediately clean roads of any debris, mud or rocks originating from their vehicles. The contractors shall tarp or otherwise cover their trucks as necessary to prevent blowing debris.

1.6 WORK SCHEDULE:

A. Working hours for the contractor will normally be between the hours of 6:30 a.m. (7:30 a.m. in housing areas) and 5:00 p.m. excluding Saturdays, Sundays and Federal holidays.

B. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. The Contracting Officer shall determine, in his/her discretion, whether such inspection forces are available and whether work will be allowed on a non-scheduled day. The Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days; however, if inspectors are required to perform in excess of their normal duty hour/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the Contracting Officer.

1.7 ACCIDENT PREVENTION PLAN:

A. In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons; preventing damage to property, materials, supplies, and equipment; and avoiding work interruptions. For these purposes, the Contractor shall --

1. Provide appropriate safety barricades, signs and signal lights

2. Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910.

3. Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken. Failure of the Contracting Officer to notify the Contractor of additional safety measures does not relieve the Contractor of liability and duty to prevent accidents by reasonable actions. The Contracting Officer shall notify the Contractor of any noncompliance with these requirements and of the corrective action required. This notice, when delivered to the Contractor or the Contractor’s representative at the site of the work, shall be deemed sufficient notice of the noncompliance and corrective action required. After receiving the notice, the

Contractor shall immediately take corrective action. If the Contractor fails or refuses to take corrective action promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not base any claim or request for equitable adjustment for additional time or money on any stop order issued under these circumstances.

4. The contractor shall comply with Section 01500, Construction Facilities and Temporary Controls.

B. The Contractor shall comply with all pertinent provisions of the current U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

C. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to property, materials, supplies, or equipment. The Contractor shall report this data in the manner prescribed by the Contracting Officer.

D. The Contractor shall be responsible for its subcontractor’s compliance with these paragraphs.

E. Before commencing the work, the Contractor shall:

1. Submit a written Accident Prevention Plan for implementing these paragraphs.

2. Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

1.8 MOBILE PHONE: The contractor, throughout the execution of this contract, shall maintain a mobile telephone at the job site at all times. The number of the mobile phone shall be provided to the Contracting Officer prior to start of work. The phone number shall be a local number, not long distance to Ellsworth.

1.9 FLIGHTLINE REQUIREMENTS

FLIGHT LINE ENTRY AUTHORIZATION LETTER (EAL).

A. The Contractor shall submit the original and two copies to the Contracting Officer.

B. The letter must be in alphabetical order, on company letterhead, and in the following format:

Date Subject: Flight Line Entry Authorization Letter

1. The below listed personnel will be working on Contract (number) from (date) to (date). These individuals are here to (describe work.)

Name SSN#

2. The following vehicles will be used to enter the flight line area during this contract:

Vehicle Make/Year License Plate

C. DO NOT combine your EAL with the subcontractor’s EAL. Each company/subcontractor must have a separate EAL.

D. Additions/Deletions of Personnel: Submit immediately to the Contracting Officer a complete new EAL when additions or deletions are made.

E. Approximately seven (7) calendar days are required for processing of EALs.

1.10 FLIGHTLINE DRIVING

A. Drivers of all vehicles operated on the flightline are required to attend flightline drivers training in accordance with Air Force Instruction (AFI) 13-213, Ellsworth AFB Supplement 1, paragraph A1.8.5. Training sessions can be scheduled by contacting the Airfield Manager at 385-1052.

B. Contractors shall place signs bearing the company logo on all vehicles used on the flightline. Magnetic signs are not allowed on the flightline.

1.10 FOREIGN OBJECT DAMAGE (FOD) PREVENTION

A. Foreign Objects are any items (rocks, tools, construction debris) on the flight line that could possibly enter an aircraft engine and cause engine damage.

B. Prior to entering the flight line area, the Contractor shall stop and check vehicle tires and other areas of the vehicle for FOD. All FOD shall be placed in appropriate containers prior to proceeding. All work areas shall be kept free of FOD at all times.

1.10 RESTRICTED AREA REQUIREMENTS: Some contract Delivery Orders may require work in restricted areas on EAFB. Entry and work in restricted areas will require the presence of government provided security escorts in possession of Ellsworth AFB Restricted Area Badges. The contractor is required to coordinate his work schedule with the appropriate escorting office to ensure the availability of escorts.

A. Upon arrival at the restricted area entry control point, all contractor employees will provide the escort official two separate means of identification. A social security card is not considered a form of identification. One form of identification shall have a photograph of the individual.

B. Once inside the restricted areas, the contractor employees must remain in the company of the escort official at all times.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01020