Attch 1_Price List (Blank).xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Roofing BPA Federal contract opportunity
- Solicitation number
- FA469021Q0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA469021Q0029.pdf | ||
| Attch 3_Roofing Systems Maint and Repair Specs -15 Jan 16.pdf | ||
| Attch 2_Ellsworth Special Provisions Spec.pdf | ||
| Attch 4_Environmental Provisions Spec - Jan 16.pdf | ||
| Attch 5_SD20210027 Meade.pdf | ||
| Attch 6_SD20210029 Pennington.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price List
CLIN DESCRIPTION UNIT OF ISSUE UNIT COST ESTIMATED QUANTITY EXTENDED COST
ROOF INSULATION
| 1001 | AM | Remove existing insulation | BF | 0 | $0.00 |
| 1001 | AN | Install tapered polyisocyanurate insulation | BF | 0 | $0.00 |
| 1001 | AP | Install coverboard for PVC or EPDM recover | SF | 0 | $0.00 |
| 1001 | AQ | Install 4" polyisocyanurate insulation | SF | 0 | $0.00 |
| 1001 | AR | Install 5" polyisocyanurate insulation | SF | 0 | $0.00 |
| 1001 | AS | Install R19 fiberglass batt insulation, unfaced | SF | 0 | $0.00 |
| 1001 | AT | Install R38 fiberglass batt insulation, unfaced | SF | 0 | $0.00 |
| 1001 | AU | Install 6 mil polyethelene vapor barrier | SF | 0 | $0.00 |
METAL ROOFING SYSTEMS
| 1001 | AV | Remove existing metal roof or wall panels and flashings | SF | 0 | $0.00 |
| 1001 | AW | Reattach existing loose metal roof or wall panels and flashings | SF | 0 | $0.00 |
| 1001 | AX | Install corrugated steel roof or wall panels, field painted | SF | 0 | $0.00 |
| 1001 | AY | Install SSMR system: 20 yr warr. | SF | 0 | $0.00 |
| 1001 | AZ | Install light-gage steel supports for SSMR system | LB | 0 | $0.00 |
| 1001 | BA | Install SSMR system flashing for rake, eave, sidewall or headwall | LF | 0 | $0.00 |
| 1001 | BB | Install SSMR system flashing for ridge, hip or valley | LF | 0 | $0.00 |
| 1001 | BC | Install SSMR system snow retention system | LF | 0 | $0.00 |
BUILT-UP ROOFING SYSTEM (BURS)
| 1001 | BD | Sweep and spud gravel for repair, store on roof | SF | 0 | $0.00 |
| 1001 | BE | Remove BUR for roof replacement | SF | 0 | $0.00 |
| 1001 | BF | Repair blisters and splits in BUR membrane | SF | 0 | $0.00 |
| 1001 | BG | Repair wind scours | SF | 0 | $0.00 |
| 1001 | BH | Install 2-ply mopped roof | SF | 0 | $0.00 |
SINGLE-PLY ROOFING SYSTEMS
| 1001 | BJ | Install .060" fully-adhered EPDM membrane roof system | SF | 0 | $0.00 |
| 1001 | BK | Install EPDM flashing system on .060" EPDM | LF | 0 | $0.00 |
| 1001 | BL | Install EPDM roof membrane patch | SF | 0 | $0.00 |
| 1001 | BM | Install .060" fully-adhered PVC membrane roof system | SF | 0 | $0.00 |
| 1001 | BN | Install PVC flashing system on .060" PVC | LF | 0 | $0.00 |
| 1001 | BP | Install PVC roof membrane patch | SF | 0 | $0.00 |
| 1001 | BQ | Install water-based, liquid acrylic roofing membrane | SF | 0 | $0.00 |
| 1001 | BR | Install synthetic rubber waterproofing elastomeric sealant | SF | 0 | $0.00 |
| 1001 | BS | Install non-woven, spunbound polyester seam reinforcing fabric | SF | 0 | $0.00 |
FLASHINGS AND METALS
| 1001 | BT | Remove and replace BUR base flashing for repair | LF | 0 | $0.00 |
| 1001 | BU | Remove, clean, straighten and reinstall sheet metal flashing | LF | 0 | $0.00 |
| 1001 | BV | Sawcut for reglet in masonry or concrete | LF | 0 | $0.00 |
| 1001 | BW | Install Kynar-finished steel counter flashing | LF | 0 | $0.00 |
| 1001 | BX | Remove existing sheet metal fascia, coping and flashing | SF | 0 | $0.00 |
| 1001 | BY | Install 24 ga. Kynar-finished fascia, coping and flashing | SF | 0 | $0.00 |
| 1001 | BZ | Install 24 ga. Kynar-finished soffit panel, plain or vented | SF | 0 | $0.00 |
| 1001 | CA | Increased cost for vented ridge flashing vs non-vented | LF | 0 | $0.00 |
| 1001 | CB | Install 24 ga. galvanized steel continous cleat | LF | 0 | $0.00 |
| 1001 | CC | Install pipe penetration flashing: 0 to 6" dia. | EA | 0 | $0.00 |
| 1001 | CD | Install pipe penetration flashing: 6"+ to 12" dia. | EA | 0 | $0.00 |
GUTTERS AND DOWNSPOUTS
| 1001 | CE | Clean out gutters and downspouts | LF | 0 | $0.00 |
| 1001 | CF | Remove existing gutters and downspouts | LF | 0 | $0.00 |
| 1001 | CG | Install Kynar pre-finished sheet metal gutters | LF | 0 | $0.00 |
| 1001 | CH | Install Kynar pre-finished sheet metal downspouts | LF | 0 | $0.00 |
| 1001 | CJ | Install Kynar pre-finishedsheet metal roof scupper box | EA | 0 | $0.00 |
| 1001 | CK | Install precast concrete splash blocks | EA | 0 | $0.00 |
SEALANTS
| 1001 | CL | Remove existing backer rod and sealant, clean joint for reseal | LF | 0 | $0.00 |
| 1001 | CM | Install backer rod and polyurethane sealant: 0 to 5/8" wide | LF | 0 | $0.00 |
| 1001 | CN | Install backer rod and polyurethane sealant: >5/8" wide | LF | 0 | $0.00 |
| 1001 | CP | Install polyurethane sealant, misc. joints and seams | EA | 0 | $0.00 |
| 1001 | CQ | Install butyl sealant, misc. joints and seams | EA | 0 | $0.00 |
ROOF DRAINS
| 1001 | CR | Clean in and around roof drains | EA | 0 | $0.00 |
| 1001 | CS | Install new clamp ring and bolts | EA | 0 | $0.00 |
| 1001 | CT | Install new strainer basket | EA | 0 | $0.00 |
| 1001 | CU | Re-flash existing drain in single ply roof | EA | 0 | $0.00 |
MISCELLANEOUS TASKS
| 1001 | CV | Install new EPDM or PVC walkway pad | SF | 0 | $0.00 |
| 1001 | CW | Install new concrete paver walkway | SF | 0 | $0.00 |
| 1001 | CX | Fabricate & install plumbers vent extension 2-4" diam | LF | 0 | $0.00 |
| 1001 | CY | Remove and re-install existing ventilator | EA | 0 | $0.00 |
| 1001 | CZ | Remove and re-install rooftop mounted equipment | LB | 0 | $0.00 |
| 1001 | DA | Fill pitch pans | EA | 0 | $0.00 |
| 1001 | DB | Install water & ice shield | SF | 0 | $0.00 |
| 1001 | DC | Install #15 felt underlayment, no mopping | SF | 0 | $0.00 |
| 1001 | DD | Remove existing, deteriorated steel roof decking | SF | 0 | $0.00 |
| 1001 | DE | Install new steel roof decking to match existing | SF | 0 | $0.00 |
| 1001 | DF | Field paint wood or metal surface | SF | 0 | $0.00 |
| 1001 | DG | Apply Siloxane Masonry Water Repellant | 5 Gal | 0 | $0.00 |
MOBILIZATION AND SERVICE CALLS
| 1001 | DH | Leak service call | EA | 0 | $0.00 |
| 1001 | DJ | After hours leak service call | EA | 0 | $0.00 |
| 1001 | DK | Extended time on site for service call crew | HR | 0 | $0.00 |
| 1001 | DL | Mobilization of roofing crew | EA | 0 | $0.00 |
| 1001 | DM | Mobilization and prep. of asphalt kettle | EA | 0 | $0.00 |
&"Arial,Bold"ROOFING SYSTEMS MAINTENANCE AND REPAIR, ELLSWORTH AFB