This document outlines specifications for a federal contract to provide gravel for maintenance throughout New River Gorge National Park and Preserve. The contractor will furnish and deliver approximately 2,175 tons of various sized sandstone stone and limestone gravel to locations within Fayette, Nicholas, Raleigh and Summers counties in West Virginia over the course of 230 days. Materials required include 50 tons of 1/4 inch crusher run sandstone, 1,675 tons of 1.5 inch crusher run sandstone, 100 tons each of 3 inch clean and 3 inch crusher run sandstone, and 250 tons of limestone size #57. Deliveries must be made between 8:00am and 2:30pm Monday through Friday as requested by the park, with daily tonnage amounts provided one to seven days in advance. The related federal contract opportunity is solicitation number 140P8123Q0042 from the Department of the Interior National Park Service Pacific West Region to provide gravel maintenance services parkwide for fiscal year 2023.

View the file

Other files

File Type Posted
Attch_1_-_Specifications_V2_0001.pdf PDF
Sol_140P8123Q0042_Amd_0001.pdf PDF
Sol_140P8123Q0042.pdf PDF
Attch_3_-_Price_Schedule.xlsx XLSX spreadsheet
Attch_2_-_Park_Map_of_Gravel_Sites.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

National Park Service New River Gorge National Park and Preserve

Maintenance Division

Purchase of Gravel for Park wide distribution:

The scope of this project is source gravel to maintain roads and related infrastructure throughout New River Gorge National Park & Preserve. The work of this section consists of furnishing and placing various sized sandstone stone ranging from ¾” crusher run, 1 ½” crusher run, 3” crusher run, 3” clean and #57 limestone. Materials shall be delivered to various locations in the New River Gorge National Park and Preserve. (See maps for specific locations)

Bid must include any applicable delivery charges, fees, taxes, etc. included in the per ton price.

Specs must be equal to listed below:

Sandstone ¾” Crusher Run - 2 Loads (approximately 25 tons per load) = 50 tons Sandstone 1 1/2" Crusher Run - 67 Loads (approximately 25 tons per load) = 1,675 tons Sandstone 3" Clean - 4 Loads = 100 tons Sandstone 3" Crusher Run - 4 Loads = 100 tons Limestone: 10 loads of #57 = 250 tons

Total of 2,175 tons

Delivery Location: Various locations throughout the following counties in the park: Fayette, Nicholas, Raleigh and Summers

Delivery Period: 230 days after receipt of order

PART I GENERAL

1.1 Description: The work of this section consists of furnishing and placing 1785 tons of various sized sandstone stone ranging from 1 ½” crusher run, 3” crusher run, and 3” clean.

1.2 Submittals

A. One certified weight ticket for each load of material delivered to the Park.

PART 2 PRODUCTS

2.1 Sandstone stone ranging from crushed stone #10, ¾” crusher run, 1 ½” crusher run, 3” crusher run, 3” clean, and rip rap will be used.

A. Materials that break up due to freeze-thaw or wet-dry cycling shall not be used.

B. Gravel shall be composed of particles of hard, durable rock, thoroughly cleaned and well graded in size.

PART 3 EXECUTION

3.1 Placing:

1. Materials may be spread by tail gating with approximately 1-4 inches thick and stockpiling at various locations throughout the following counties in the park: Fayette, Nicholas, Raleigh and Summers.

1. Deliveries shall be completed as requested by the park over the course of the period of performance. The park will notify the contractor one to seven day(s) in advance before the needed delivery with daily total of tons as requested.

2. Deliveries shall be made as requested by the park between the hours of 8:00 a.m. and 2:30 p.m. Monday – Friday.