Attch_1_-_Specifications_V2_0001.pdf
PDF 118 KB Posted
- Attached to
- NERI GRAVEL - PARKWIDE FY23
- Solicitation number
- 140P8123Q0042
About this file
This document outlines specifications for a federal contract to provide gravel for maintenance throughout New River Gorge National Park and Preserve. The contract will provide approximately 2,175 tons of various sized crushed stone and sandstone gravel, including 50 tons of 1/4-inch crusher run, 1,675 tons of 1.5-inch crusher run, 100 tons each of 3-inch clean and 3-inch crusher run, and 250 tons of #57 limestone. Materials will be delivered to locations within Fayette, Nicholas, Raleigh and Summers Counties in West Virginia as requested by the National Park Service over the one-year period of performance. The related federal contract opportunity is identified as Solicitation Number 140P8123Q0042 for gravel requirements at New River Gorge National Park and Preserve in fiscal year 2023 to be awarded by the National Park Service Pacific West Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8123Q0042_Amd_0001.pdf | ||
| Sol_140P8123Q0042.pdf | ||
| Attch_1_-_Specifications.pdf | ||
| Attch_3_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attch_2_-_Park_Map_of_Gravel_Sites.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
National Park Service New River Gorge National Park and Preserve
Maintenance Division
Purchase of Gravel for Park wide distribution:
The scope of this project is source gravel to maintain roads and related infrastructure throughout New River Gorge National Park & Preserve. The work of this section consists of furnishing and placing various sized sandstone stone ranging from ¾” crusher run, 1 ½” crusher run, 3” crusher run, 3” clean and #57 limestone. Materials shall be delivered to various locations in the New River Gorge National Park and Preserve. (See maps for specific locations)
Bid must include any applicable delivery charges, fees, taxes, etc. included in the per ton price.
Specs must be equal to listed below:
Sandstone ¾” Crusher Run - 2 Loads (approximately 25 tons per load) = 50 tons Sandstone 1 1/2" Crusher Run - 67 Loads (approximately 25 tons per load) = 1,675 tons Sandstone 3" Clean - 4 Loads = 100 tons Sandstone 3" Crusher Run - 4 Loads = 100 tons Limestone: 10 loads of #57 = 250 tons
Total of 2,175 tons
Delivery Location: Various locations throughout the following counties in the park: Fayette, Nicholas, Raleigh and Summers
Delivery Period: One year after receipt of order
PART I GENERAL
1.1 Description: The work of this section consists of furnishing and placing 2,175 tons of various sized sandstone stone ranging from 1 ½” crusher run, 3” crusher run, and 3” clean.
1.2 Submittals
A. One certified weight ticket for each load of material delivered to the park.
PART 2 PRODUCTS
2.1 Sandstone stone ranging from crushed stone #10, ¾” crusher run, 1 ½” crusher run, 3” crusher run, 3” clean, and rip rap will be used.
A. Materials that break up due to freeze-thaw or wet-dry cycling shall not be used.
B. Gravel shall be composed of particles of hard, durable rock, thoroughly cleaned and well graded in size.
PART 3 EXECUTION
3.1 Placing:
1. Materials may be spread by tail gating with approximately 1-4 inches thick and stockpiling at various locations throughout the following counties in the park: Fayette, Nicholas, Raleigh and Summers.
1. Deliveries shall be completed as requested by the park over the course of the period of performance. The park will notify the contractor one to seven day(s) in advance before the needed delivery with daily total of tons as requested.
2. Deliveries shall be made as requested by the park between the hours of 8:00 a.m. and 2:30 p.m. Monday – Friday.
3. Deliveries may be called upon anytime during the period of performance, but deliveries between December 15th, 2023 and March 31st, 2024 will be very limited based on weather conditions and NPS Staff availability.
File details come from the government source that posted it. Updated .