About this file

This document outlines requirements for a boiler upgrade and replacement construction project. The United States Department of Agriculture Agricultural Research Service seeks to replace an existing boiler and upgrade controls at its San Joaquin Valley Agricultural Sciences Center facility in Parlier, California. The contractor shall remove the current boiler and install a new high mass firetube condensing hot water boiler rated at 5 million BTUs per hour. Additional requirements include installing new controls and integrating the boiler system into the existing building automation system. The performance period is from June 1, 2024 through October 31, 2024. The procurement will be set aside for small businesses under NAICS code 238220 with a size standard of $19 million.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agricultural Research Service San Joaquin Valley Agricultural Sciences Center

9611 S Riverbend Ave Parlier, CA 93648

Boiler Upgrade and Replacement Statement of Work

1. Background: The San Joaquin Valley Agricultural Sciences Center located in

Parlier, CA has a boiler that has reached it end of life. Although still operational, it has been identified per the facility infrastructure assessment to be upgraded and replaced.

2. Scope: The Contractor shall provide a proposal to upgrade and replace existing boiler per the requirement section of this scope of work. In addition, contractor shall include in the proposal the cost for a second boiler for upgrade and replacement.

3. Objectives: The objective of this contract is to obtain a contractor who is experienced with removing and install a new boiler. In addition, contractor will ensure new boiler communicates with existing building automation system Metasys.

4. Requirements:

Contractor shall perform the following tasks as a part of this Boiler upgrade and replacement:

• Field Install a New High Mass Firetube Condensing Hot Water Boiler o Capacity: 5,000,000 btu/hr.

o Design pressure: 125 PSI o Voltage: 460/3/60 o Design requirement: CSD-1, FM, UL o Emissions: 9 PPM NOx o Gas flow: 5,000 SCFH Natural Gas o Environment: Indoor o Burner turndown: 10:1

• The boiler design shall meet the following specifications:

o Single pass vertical down-fired firetube boiler w/ 9 sq. ft. of heating surface per rated boiler horsepower o Structural Steel Stand o Polymer drain collection box with drain fittings.

o Water outlet and water inlet must connect to existing water loop o Threaded air vent connection at the top of the boiler for field piping to an expansion tank o Boiler pressure vessel shall be insulated and shall be encased in 18-gauge metal cabinet with powder coated finish.

• Field Install the following components:

o ASME rated pressure relief valve(s) o Combination pressure/temperature gauge o Drain valve.

o Air filter kit o Alarm kit o Condensate treatment kit o Air vent

• The Burner shall have the following specifications:

o Unitized Venturi, gas valve, blower, and burner head design o Variable speed DC combustion air fan capable of modulating the burner at a 10:1 ratio from high to low fire.

o Burner head should be constructed of Fecralloy-metal fiber.

o Forced draft burner mounted in and integral with the boiler hinged top door so when the door is opened the burner head, furnace, tube sheet, and tubes are exposed.

• Exhaust Ducting shall be included.

• All new pipes shall be painted and insulated in accordance with industry standards.

Controls

• The boiler shall include a computerized boiler burner control that includes:

o Sequence Indication o Fault Reset o Mode Selection o Parameter ser-point switches

• The computerized boiler burner control shall be mounted at the front of the boiler connected to existing power source. Contractor shall verify power compatibility.

• Controller shall perform the following functions:

o Burner sequencing with safe start check, pre-purge, direct spark ignition, and post purge.

o Electronic ignition o Flame supervision o Safety shutdown with display of error o Modulating combustion fan o High limit temperature control o Gas pressure supervision, high and low o Combustion air proving supervision.

o High air pressure supervision.

o Display of supply temperature and set-point temperature shall be accessible, and output shall be continuous PID via 4-20mA current.

o Circulating pump operation o Heating loops

• Replace (2) existing pneumatic actuator with digital actuator and integrate into the existing Metasys System

Upgraded Existing BAS Controls for Boiler Plant

• Install a new Johnson Controls Metasys M4 equipment controller or equivalent for the boiler plant.

• Metasys Equipment Controller

• Install existing controls inputs and outputs.

• Provide a BACnet interface from the boiler system to the existing Metasys building automation system.

• Provide new BACnet communication wire from the Metasys system to the boilers.

• Replace existing pneumatic actuator with digital actuator and integrate into the existing Metasys System.

• Install power cut off / power disconnect switch.

• The following items to be replaced:

o Secondary Hot Water Supply Temperature o Secondary Hot Water Return Temperature o Primary Hot Water Return Temperature o Secondary Hot Water Differential Pressure Sensor o Replace existing temperature sensors with new temperature sensors in existing wells.

o Integrate hot water system including pumps, boilers, associated sensors, actuators and programed into the existing Metasys controller.

5. Delivery: Contractor shall furnish all equipment, materials, labor, and supplies required to achieve the quality performance standards of the work in this contract

6. Government-Furnished Property: None

7. Security Requirements: Contractor and team shall sign in daily with receptionist.

8. Place of Performance: The work performed under this contract shall be at the

United States Department of Agriculture (USDA) San Joaquin Valley Agricultural Sciences Center (SJVASC), located at 9611 S Riverbend Ave, Parlier, CA 93648.

It is highly encouraged that contractor perform a site visit prior to submitting proposal.

9. Period of Performance: June 1, 2024 – Oct 31st, 2024

Agricultural Research Service
San Joaquin Valley Agricultural Sciences Center
9611 S Riverbend Ave Parlier, CA 93648
Boiler Upgrade and Replacement
Statement of Work