This is a Performance Work Statement (PWS) for annual overhead hoist inspections and load testing services at the 158th Fighter Wing, Vermont Air National Guard in South Burlington, Vermont.

The contractor shall conduct annual safety inspections and load testing of five overhead hoists located at Aircraft Maintenance Facilities, with inspections and load tests to be scheduled within 30 days of contract award. All inspections must comply with Department of the Air Force Manual (DAFMAN) 91-203 Chapter 12, OSHA Regulations 29 CFR § 1910.244, 1926.1413, 1926.406, 1926.552, 1926.554, and American Society of Mechanical Engineers (ASME) standards B30.10, B30.16, B30.17, and B30.21. Load testing shall be performed at 100-125 percent of rated load capacity. Inspection reports and load test certificates must be provided to the Contracting Officer's Representative (COR) within 15 calendar days of completion. If deficiencies are identified, the contractor shall submit itemized repair quotes within 15 days; safety hazards must be reported immediately. For inoperable hoists, the contractor shall dispatch a technician within five business days and complete repairs within 10 business days of contract modification approval. The period of performance is one 12-month base year plus two optional 12-month extension years. Services shall be performed Tuesday through Friday, 0700-1600 hours, excluding recognized U.S. federal holidays. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control; the Government furnishes workspace, telephones, computers, and utilities. All contractor personnel require AT Level I antiterrorism training within 15 days of contract start and must comply with installation security policies, identification badge requirements, and prohibited items restrictions.

View the file

Other files

File Type Posted
Questions with Responses.docx DOCX document
Attch 4_ Clauses and Provisions.pdf PDF
Attch 2_ Instructions to Offerors.docx DOCX document
Attch 5_ National Guard Protest Procedures.pdf PDF
Attch 3_ RFQ Price Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PERFORMANCE WORK STATEMENT (PWS)

FOR

Annual Overhead Hoist Inspections and Load Testing Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform the annual inspection, load testing and certification of five (5) overhead hoists located at the Aircraft Maintenance Facilities of the 158th Fighter Wing, Vermont Air National Guard, as defined in this PWS.

1.2 Background: This annual inspection requirement is driven by Department of the Air Force Manual (DAFMAN) 91-203 to bring and keep the cranes up to code. For the last three years the inspections and load testing have been completed year to year with a GPC purchase.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and 2 12-month option years.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700 - 1600 on Tuesday thru Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at multiple facilities generally located around 112 NCO drive in South Burlington, Vermont. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.

When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Reserved

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.1.3.1 Prohibited Items: The contractor’s employees found in possession of prohibited items may receive a warning and or a debarment letter. Any personnel found in possession of illegal contraband or substances may be detained by Security Forces members, and South Burlington Police Department personnel will respond for investigation and processing of the individual(s).

1.4.1.3.1.1 Weapons: No weapons, ammunition, or explosives are permitted on this installation. This includes firearms, bows, crossbows, arrows, bolts, or blades greater than three inches in length.

1.4.1.3.1.2 Contraband: Controlled substances, marijuana, drug paraphernalia and open alcohol containers are not authorized onto the installation.

1.4.1.3.2 Restricted Area Access: The Maintenance Group will provide escorts to the contractor while working in restricted areas. Contractor employees will stay in the sight of their escort and follow their instructions

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Reserved

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Reserved

1.4.5.2 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.4 Reserved

http://jko.jten.mil/

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating all vehicles and equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE:

The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Reserved

1.4.13 Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.14 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement

DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Reserved

4.3 Reserved

5.0 Requirements: The contractor shall perform the annual safety inspections and load testing of the five (5) designated overhead hoists. Upon completion of the annual inspections and load tests, a detailed inspection report and load test certification will be provided for each hoist. If deficiencies are noted, an itemized quote will be submitted detailing the recommended repairs within 15 days. If there is a safety hazard, the contractor will inform the COR immediately.

5.1 Scheduling

5.1.1 Contractor will schedule inspections and load tests within 30 days of contract award of all 5 hoists.

5.1.2 Contractor will coordinate with the COR prior to arrival to provide escort.

5.2 Inspection

5.2.1 Contractor shall provide an annual inspection in accordance with the Department of the Air Force Manual (DAFMAN) 91-203 chapter 12, Occupational Safety and Health (OSHA) Regulations 29 CFR § 1910.244, 1926.1413, 1926.406, 1926.552, 1926.554, as well as the American Society of Mechanical Engineers (ASME) B30.10, B30.16, B30.17, and B30.21 to ensure equipment maintains operational and safety standards.

5.3 Load Test

5.3.1 Contractor shall perform hoist load test accordance with DAFMAN 91-203, chapter 12, paragraph 12.7. This load test shall be at not less than 100 percent or more than 125 percent of the rated load, unless otherwise recommended by the manufacturer, and annually thereafter at not less than 100 percent or more than 125 percent of rated capacity.

5.4 Reporting

5.4.1 Contractor will provide an inspection report for each hoist, detailing the items inspected, status and any recommended maintenance. The report will be provided to the COR within 15 calendar days following inspection.

5.4.2 The contractor will notify the COR immediately if any safety hazardous are identified during inspection and/ or load test.

5.4.3 The contractor will provide a load test certificate for each hoist that successfully passes. The certificate will be provided to the COR within 15 calendar days of passing load test.

5.5 Repair Services

5.5.1 Contractor shall dispatch a technician in the event an overhead hoist becomes inoperable to troubleshoot the break, within five business days.

5.5.2 Contractor will provide an estimate of repairs detailed quote to the COR for review prior to performing any repair services.

5.5.3 Contractor shall not perform any repair service prior to the approval of the Contracting Officer.

5.5.4 Contractor shall complete repairs within 10 business days upon issuance of the contract modification.

5.5.4.1 Contractor will notify COR if pending repairs require materials to be ordered and delivered prior to repair to adjust the repair completion date.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation M https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement M http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 M https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5400.11 Department of Defense Privacy and

Civil Liberties Programs

01/29/2019

A https://www.esd.whs.mil/Directives/issuances/dodi/

AFI 10-245

Antiterrorism

03/30/2017) M https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures

08/18/2020 M https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015

M https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 10-701

Operations Security 7/24/2019 (Change 1:

06/09/2020)

M https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131 https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method / By

Whom

5.2 Inspections Completed crane inspections

meet standards as outlined in DAFMAN 91.203, OSHA Reg 29 CFR 1926.554 and ASME B30.17

No deviation from Standards

Random Inspection / COR

5.3 Load test Completed crane load tests

meet standards as outlined in DAFMAN 91-203, chapter 12, paragraph 12.7.

No deviation from standards

Random Inspection / COR

5.5.1 Repair

services

Technician dispatched to troubleshoot inoperable hoist within 5 days of notification

No more than 2 instances of delayed scheduling.

Periodic Inspection / COR

5.5.4 Repairs completed within 10

business days of issuance of contract modification

No more than 1 instances of delayed completion

Periodic Inspection / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.1.3 Quality

Control

Provide within 10 calendar day after contract award

1 Electronic Submission

COR

1.4.5.3 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

5.4.1 Inspection

Report

Provide within 15 calendar days following the inspection is completion.

1 Electronic Submission

COR

5.4.3 Load Test

Certificate

Provide within 15 calendar days following the successful test.

1 Electronic Submission

COR

TECHNICAL EXHIBIT 3

Estimated Workload Data

ITEM NAME ANNUAL ESTIMATED

QUANTITY

1 Annual Hoist Inspections 5 2 Annual Hoist Load Tests 5

TECHNICAL EXHIBIT 4

Description of Hoist to be Inspected and Load Tested

MANUFACTURE TYPE S/N CAPACITY LIFTING

HEIGHT

HOOK

QTY

BUILDING

LOCATION

Coffing HOIST/ Chain 18957 2 TON 11' 1 326 / North Bay

Coffing HOIST/ Chain 18958 2 TON 11' 1 326 / South Bay

Coffing HOIST/ Chain ? 2 TON 34' 1 150 / Hangar

CM Cyclone HOIST/ Manual Chain ? 1/2 TON 10' 2 160 / Paint Booth