Attch 1. Statement of Work.pdf

PDF 315 KB Posted

Attached to
EMCS Upgrade Federal contract opportunity
Solicitation number
FA4626-24-Q-0050
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a Performance Work Statement (PWS) for a contract to upgrade the Environmental Management Control System (EMCS) at Malmstrom Air Force Base. The key requirements are:

The contractor shall replace 28 JACE controllers with new JACE-9000 hardware, upgrade the software on the remaining 38 JACE controllers to Niagara N4 v4.13 or better, and integrate the new controllers with the existing N4 Web Supervisor. The contractor shall also provide training, security patches, and a 3-month follow-up inspection. The period of performance is 365 days from contract award.

The related federal contract opportunity is solicitation FA4626-24-Q-0050 issued by the Department of the Air Force Global Strike Command to procure the EMCS upgrade. The contractor shall replace 28 JACE 9000 controllers, upgrade 38 JACE 9000 controllers, and provide 20 hours of training on the upgraded system.

View the file

Other files for this federal contract opportunity

Other files attached to EMCS Upgrade, newest first.
File Type Posted
Q and A 09.03.2024.pdf PDF
Attch 2. Installation Perimeter Access Control.pdf PDF
COMBO 08.19.2024.pdf PDF
Attch 4. Technical Narrative.pdf PDF
Attch 3. CLIN 0001 Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Performance Work Statement (PWS) for

Civil Engineer EMCS Server and Workstation Upgrade

Malmstrom Air Force Base MONTANA

14 Feb 2024

SECTION 1

DESCRIPTION OF SERVICE

1. GENERAL REQUIREMENTS

1.1. The contractor shall provide all labor, equipment, software, installation, and incidentals necessary to upgrade the existing Environmental Management Control System (EMCS) JACE Controllers to operate N4 version 4.13 or better. The contractor will ensure a connection is made with the newly upgraded devices to the existing N4 Web Supervisor.

Contractor shall build graphics, trends, histories, meter data, alarms, and Certificates for the N4 server and migrate all data from existing JACE controllers.

1.2. SUMMARY OF WORK

1.3. Contractor shall replace 28 JACE controllers with new hardware to support N4. The Base has identified 4 controllers that will need a Software Maintenance Agreement renewal to facilitate the upgrading of the license. The remaining 38 JACE controllers will require a software upgrade. All JACE controllers will be upgraded from AX v3.8 to N4 4.13 or better.

1.4. If a new JACE Controller is required, it will be a JACE-9000 (No Wi-Fi) or better and be sized for the appropriate number of field controllers. If an existing JACE Controller needs to be upgraded the contractor shall renew the Software Maintenance Agreement and upgrade the JACE to the required version of software and licensing.

1.5. Contractor shall Install Niagara N4 v4.13 or better on each JACE controller. Contractor shall make Niagara net connections between the new N4 Web Supervisor and all MAFB buildings JACE’s running N4. Develop methods and programing for seamless integration of new N4 JACE’s into N4 Web Supervisor. The software used to interface with the JACE and Web Supervisor must be Windows 10 and 11 compatible.

1.6. Clean and visually inspect all JACES adjusting any settings or dip switches as necessary:

Label with appropriate IP addresses. Ensure all connections are secure and operating as intended.

1.7. Contractor shall provide copies of each JACE Station and Web Supervisor on portable hard drive upon completion of the project.

1.8. Contractor shall provide two 10-hour days of training after the system is fully installed. Base will provide the site.

1.9. Contractor shall provide security patches/updates sent on a disk to 341 CES for the JACES Computer Application quarterly.

1.10. Contractor shall conduct a 3-month follow up inspection coordinated with the POC (see para.

9.1) to ensure completeness and acceptability on all components.

1.11. Contactor will provide standard manufacturer warranty after installation on all components

2. PERIOD OF PERFORMANCE

2.1. Work must be completed within 365 days of contract being awarded; to include the 3-month follow up inspection.

2.2. Hours of Operation. The contractor will perform server and workstation upgrade in all uncontrolled facilities from 7:30 a.m. to 4:30 p.m., Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the CO. The contractor will perform server and workstation upgrade in all controlled facilities from 7:30 a.m. to 4:30 p.m. Tuesdays through Thursdays, excluding federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the contractor to work at times other than normal working hours. When the contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO, and reschedule the work to minimize disruption. When workload requires, the contractor may work in addition to the normal duty hours to perform to the standards outlined in this PWS.

2.3 Recognized Holiday’s. The contractor is not required to provide service on federal holidays, except in emergency situations; the holidays are:

• New Year’s Day

• Martin Luther King Day

• Washington’s Birthday

• Memorial Day

• Juneteenth

• Independence Day

• Labor Day

• Columbus Day

• Veteran’s Day

• Thanksgiving Day

• Christmas Day

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.

2.4 Base Closures. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

3 CONTRACTOR EMPLOYEES

3.1 Employee Certifications. Contractor shall ensure all personnel have the appropriate certifications necessary to perform the requirements of this statement of work.

4 MISHAP NOTIFICATION AND REPORTING. The contractor shall immediately report all injuries and damage involving contractor, Air Force civilian or military personnel to the QAE and the Wing Safety Office.

4.1 Cooperate fully and assist government personnel in any government investigation of the mishap, until released by the mishap investigative authority through the CO. Safety personnel shall have the right, at any time, to investigate and report all mishaps involving Air Force personnel and property. The CO and contractor Safety representative may accompany Air Force mishap investigation personnel but may not release information.

4.2 Regarding the mishap without written approval of the AF Safety investigating official or senior installation commander.

4.3 Maintain records of contractor employee’s occupational injuries, illnesses, and other related activities as required.

5 FIRE PREVENTION. Establish and implement procedures to ensure careful handling and storage of flammable and combustible products IAW National Fire Protection Association (NFPA) Standard 30 and National Fire Codes.

6 SECURITY REQUIREMENTS

6.1 Anti-Terrorism Awareness Training. In accordance with DoDI O-2000.16v1_AFI 10- 245-O, Antiterrorism (AT) Program Implementation, ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. The training will be provided by the government. The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures.

6.2 Entry Authorization List (EAL)/Escort Required. Contractor will provide all necessary information required to be added to an EAL for the duration of the contract period. Contractor personnel will be escorted at all times by 341 Civil Engineer Squadron personnel while working in the server room.

6.3 Force Protection. Contractor personnel are required to abide by all real world Force Protection Condition (FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

7 HOUSEKEEPING AND CUSTODIAL SERVICES. The contractor must maintain the contractor assigned areas in a clean, safe, and sanitary condition. Remove trash from all the work areas and store all flammables in an approved flammable storage container and ensure the area is left in an orderly manner at the end of the duty day.

7.1 Sanitary Facilities. The Contractor’s employees may use the nearest sanitary facilities.

The

Contractor shall not use facilities in controlled or restricted areas IAW security requirements.

7.2 Refuse Collection. Waste generated by the Contractor in performance of the services specified with this SOW shall be disposed of by contractor off base in compliance with State and Local ordinances, including hazardous materials in which proper disposal instructions shall be complied with. All trash, debris, and refuse caused by the job shall be removed and disposed and shall be deposited in an approved receptacle or container furnished by the Contractor. The job site shall be cleaned at the end of each workday.

8 ADMINISTRATIVE RECORDS. All records, documents, and associated papers provided by the government and generated during the period of this contract become government property and will remain in place upon contract termination or completion. During the period of the contract, records, documents, and associated papers shall be available for review.

9 INSPECTION

9.1 Point of Contact (POC). The 341st Civil Engineering Squadron will provide a point of contact (Point of Contact) to verify accomplishment of work

• Ms. Stephanie Marthell, 341 CES/CEIAI, 406-731-6589, stephanie.marthell2..@us.af.mil

• Mr. Joseph Bernard, 341 CES/CEOIH, 406-731-6564, joseph.bernard@us.af.mil The contractor will notify the POC within 2 workdays (between 7:30 a.m. and 4:30 p.m., Tuesday through Thursday) of their arrival to begin work.

Controversies between the POC and the Contractor will be resolved by the Contracting Officer. If, for some reason, a change in the primary or alternate POC is required, the Contractor will be notified in writing by the Contracting Officer. The Contractor shall coordinate Contractor activities with the 341st Civil Engineering Squadron.

9.2 Final Inspection. The Contractor will notify the POC of their estimated work completion date at least 7 days in advance, to verify accomplishment of work and receive contractor work report. A 3-month follow up inspection will be accomplished to prove full system operation and for the work to be officially accepted. This inspection must be completed within the 365-day period of performance. Any deficiencies found shall be rectified by the Contractor and the Contractor shall inform the POC upon completion.

mailto:stephanie.marthell2..@us.af.mil mailto:joseph.bernard@us.af.mil

1.2. SUMMARY OF WORK
1.3. Contractor shall replace 28 JACE controllers with new hardware to support N4. The Base has identified 5 controllers that will need a Service Maintenance Agreement renewal to facilitate the upgrading of the license. The remaining 38 JACE control...
1.4. If a new JACE Controller is required, it will be a JACE-9000 (No Wi-Fi) or better and be sized for the appropriate number of field controllers. If an existing JACE Controller needs to be upgraded the contractor shall renew the service maintenan...
1.5. Contractor shall Install Niagara N4 v4.13 or better on each JACE controller. Contractor shall make Niagara net connections between the new N4 Web Supervisor and all MAFB buildings JACE’s running N4. Develop methods and programing for seamless i...
1.6. Clean and visually inspect all JACES adjusting any settings or dip switches as necessary: Label with appropriate IP addresses. Ensure all connections are secure and operating as intended.
1.7. Contractor shall provide copies of each JACE Station and Web Supervisor on portable hard drive upon completion of the project.
1.8. Contractor shall provide two 10-hour days of training after the system is fully installed. Base will provide the site.
1.9. Contractor shall provide security patches/updates sent on a disk to 341 CES for the JACES Computer Application quarterly.
1.10. Contractor shall conduct a 3-month follow up inspection coordinated with the POC (see para. 9.1) to ensure completeness and acceptability on all components.
1.11. Contactor will provide standard manufacturer warranty after installation on all components
2. PERIOD OF PERFORMANCE
2.1. Work must be completed within 365 days of contract being awarded; this includes the 3-month follow up inspection.
3 CONTRACTOR EMPLOYEES
6 SECURITY REQUIREMENTS
9 INSPECTION