Attachmt B-Coefficient Schedule.pdf

PDF 330 KB Posted

Attached to
Poland IDIQ Job Order Contract
Solicitation number
N3319124R9007
Issued by

About this file

This document is an Attachment B - Coefficient Schedule for Solicitation N3319124R9007 issued by the Department of the Navy Naval Facilities Engineering Command for a Poland IDIQ Job Order Contract.

The Coefficient Schedule requires offerors to provide proposed coefficients for four pricing elements: pre-priced material/equipment, pre-priced labor, non-pre-priced material/equipment, and non-pre-priced labor. Offerors must calculate estimated amounts for each coefficient and provide a Total Evaluated Price. The completed Coefficient Schedule will become part of the contract award. The example values provided are for price evaluation purposes only, and the actual distribution of work may differ. Coefficients must not exceed two decimal places. In the event the offeror calculates the Example Value with Coefficient incorrectly, the government will use the proposed coefficient to recalculate it. All coefficients will remain in effect for the life of the contract, including option periods. Multiple awards will not be made.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

COEFFICIENT SCHEDULE

SOLICITATION N3319124R9007

NAVFAC POLAND AREA OF RESPONSIBILITY JOB ORDER CONTRACT

Coeff. # DESCRIPTION PROPOSED

COEFFICIENT

EXAMPLE

VALUE

EXAMPLE

VALUE

W/COEFFICIENT

Pre-Priced (RS Means)

1 Material and Equipment Coefficient X $100,000 =

2 Labor Coefficient X $100,000 =

Non Pre-Priced

3 Material and Equipment Coefficient X $100,000 =

4 Labor Coefficient X $100,000 =

TOTAL EVALUATED PRICE (TEP)

NOTES:

(1) The Offeror is to provide Proposed Coefficients for Coefficients 1 through 4, calculate the Estimated Amounts, and provide a Total Evaluated Price.

(2) The completed Coefficient Schedule is to be submitted with the Price Proposal and will become a part of the contract award.

(3) The value of work estimated for Coefficients 1 through 4 is for price evaluation purposes only. The actual distribution of work may differ significantly from that shown. Therefore, the Contractor should ensure that the coefficient properly reflects its costs for each category.

(4) Coefficients are not to exceed more than two places to the right of the decimal.

(5) In the event the Example Value W/Coefficient is calculated incorrectly by the offeror, the Government will use the Proposed Coefficient to correctly calculate the Example Value W/Coefficient in order to calculate the Total Evaluated Price.

(6) All coefficients will remain in effect throughout the life of contract including all option periods.

(7) Multiple awards will not be made.

File details come from the government source that posted it. Updated .