Attachmnet A Schedule of Items.pdf
PDF 669 KB Posted
- Attached to
- Repair residences at Womble Ranger District
- Solicitation number
- 12445123Q0034
About this file
This schedule of items outlines the work required to repair two residences at the Womble Ranger District. The contractor will return the Assistant Ranger House to livable condition, including abating mold, replacing flooring and fixtures, repairing structural elements, and performing exterior and yard work. For the Ranger House, the contractor will remove and abate mold throughout, replacing all affected materials. Optional work includes replacing the roofs on both houses. The contractor will dispose of all removed materials in accordance with specifications in the related solicitation from the USDA Forest Service Southern Region to repair the residences under solicitation number 12445123Q0034. Pricing is provided for lump sum costs for each work item or optional item.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMBLE RANGER AND ASSISTANT RANGER HOUSES RENOVATIONS
SCHEDULE OF ITEMS
# UNIT QUANTITY UNIT
COST
ITEM
DESCRIPTION TOTALS
01 Lump Sum 1
The contractor shall provide all labor, tools, equipment, and materials to return the Assistant Ranger House to livable condition (including abating mold; removing the chimney and inside brick and repairing the wall;
removing and replacing carpeting and padding; repairing a few floor joists; changing the attic access; replacing 2 doors; replacing a ceiling fan; installing a bathroom fan; remove and replace damaged paneling and trim; prep and paint interior; construct crawl space door; reinstall crawl space vent; power wash exterior; clean and service the HVAC and ductwork; evaluate and return to operation: plumbing and electrical systems; install a water heater; replace from porch column(s); clean entire interior; mow and weed eat the yard) in accordance with the specifications for the Womble Ranger and Assistant Ranger Houses Renovations.
02 Lump Sum 1
The contractor shall provide all labor, tools, equipment, and materials to remove and abate the mold in the Ranger House (including removing wall and ceiling coverings and trim in two main floor bedrooms, main floor bathroom and main floor hallway; removing all fixtures and cabinets from the main floor bathroom; remove all carpeting and padding; removing plywood ceiling and insulation from basement; pressure washing the exterior and repairing damaged siding) in accordance with the specifications for the Womble Ranger and Assistant Ranger Houses Renovations.
Option
Lump Sum 1
The contractor shall provide all labor, tools, equipment, and materials to remove and replace the roof of the Ranger House (including replacing any damaged decking, facia trim, gutters or downspouts) in accordance with the specifications for the Womble Ranger and Assistant Ranger Houses Renovations.
Option
Lump Sum 1
The contractor shall provide all labor, tools, equipment, and materials to remove and replace the roof of the Assistant Ranger House (including replacing any damaged decking, facia trim, gutters or downspouts) in accordance with the specifications for the Womble Ranger and Assistant Ranger Houses Renovations.
TOTAL COST $
Notes: Contractor shall dispose of all removed items.
Attachment A 12445123Q0034
Schedule of Items
File details come from the government source that posted it. Updated .