This document is a U.S. Army Corps of Engineers Department of the Army Permit for Brevard County, Florida, authorizing the continued use of an artificial reef site in the Atlantic Ocean. The permit (SAJ-1993-00620) allows Brevard County to deploy various artificial reef materials within a 3,085-acre site located approximately 15.5 nautical miles east of Port Canaveral. The permit is valid until April 30, 2032, with the county anticipating one or two deployments annually, totaling approximately 15 deployments over the next decade. Authorized materials include prefabricated reef modules, concrete structures, natural rock boulders, steel vessels over 60 feet long, and other clean, durable materials weighing at least 500 pounds.

The project aims to increase marine habitat for recreational and commercial fish species, including snapper, grouper, black sea bass, and wreckfish, with potential economic benefits for local businesses. The reef site was selected for its sandy bottom and lack of hard features, with depths ranging from 76.3 to 88.4 feet. Brevard County will conduct monitoring through photo-documentation and fish surveys, ensuring compliance with environmental regulations. The county must follow strict deployment guidelines, including maintaining a 200-foot buffer from existing marine features, avoiding deployment during right whale conservation periods, and obtaining necessary inspections and clearances for all materials.

View the file

Other files for this state and local contract opportunity

Other files attached to Artificial Reef Construction, newest first.
File Type Posted
Addendum_2.pdf PDF
Addendum_1.pdf PDF
REVISED_pages_11-14.pdf PDF
B-8-25-36_Inv&Specs.pdf PDF
B-8-25-36_Inv&Specs.pdf PDF
Attachments_A-E.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

NOAA Referenced Location Map

Cocoa Beach

Port Canaveral

Center of Site 28° 23.0017’ N 80° 17.6967’ W

Center of Site: 28° 23.0017’ (28.38336°) N, 80° 17.6967’ (80.29494°) W

N

NOAA Chart No. 11476, Cape Canaveral to Bethel Shoal , July 2006

Center 28° 23.0017’ N 80° 17.6967’ W

NW Corner: 28° 24.5067’ (28.40844°) N, 80° 18.9450’ (80.31575°) W / NE Corner: 28° 24.6700’ (28.41117°) N, 80° 17.7467’ (80.29578°) W SW Corner: 28° 21.1633’ (28.35272°) N, 80° 17.6483’ (80.29414°) W / SE Corner: 28° 21.5367’ (28.35894°) N, 80° 16.4967’ (80.27494°) W

NW Corner 28° 24.5067’ N 80° 18.9450’ W

NE Corner 28° 24.6700’ N 80° 17.7467’ W

SW Corner 28° 21.1633’ N 80° 17.6483’ W

SE Corner 28° 21.5367’ N 80° 16.4967’ W

Site Area:

3085 Acres

N

NOAA Chart No. 11476, Cape Canaveral to Bethel Shoal , July 2006

ATTACHMENT B

Depth Survey

Deployment Site & Existing Materials sandy.johnson Typewritten Text

DEPTHS ARE REFERENCED TO

MEAN LOWER LOW WATER

DEPTH RANGES FROM 76.3 TO 88.4 FT

ATTACHMENT C

Reef Permit

DEPARTMENT OF THE ARMY PERMIT

Permittee: BREVARD COUNTY

2725 JUDGE FRAN JAMIESON WAY

BUILDING A, ROOM 219

VIERA, FL 32940

Permit No: SAJ-1993-00620 (SP-JDP) Modification - #2

Issuing Office: U.S. Army Engineer District, Jacksonville

NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the U.S. Army Corps of Engineers (Corps) having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.

You are authorized to perform work in accordance with the terms and conditions specified below.

Project Description: This permit modification authorizes the continued use of the Brevard County Artificial Reef Site 2 (BCAR Site 2) for deployment of authorized material within the reef site for an additional ten (10) years. Material authorized for use by this permit are prefabricated artificial modules, concrete and steel culverts, steel hulled or ferro cement vessels (without engines), concrete blocks, slabs, natural limestone boulder size rocks, concrete bridge material and construction grade aluminum alloys and ferrous metals such as bridges. All materials shall be clean and free from asphalt, creosote, petroleum, other hydrocarbons, toxic residues, lose free floating material, and/or other deleterious substances. Divers will examine the ocean floor prior to each deployment to ensure that there is no live bottom. This reef site consists of 3,085 acres. The work described above is to be completed in accordance with the 7 pages of drawings and 4 attachments affixed at the end of this permit instrument.

Project Location: The project would affect waters of the United States (WOTUS) associated with the BCAR Site 2 deployment location within the Atlantic Ocean. The project site is located approximately 15 nautical miles east of Port Canaveral, Brevard County, Florida. This is a previously permitted artificial reef site and is currently plotted on NOAA Chart 11476, Cape Canaveral to Bethel Shoal.

Directions to site: From Jacksonville, take I-95 South; exit onto SR 528 East towards Port Canaveral; proceed from Port Canaveral by vessel approximately 15 nautical miles east into the Atlantic Ocean, seaward of Brevard County, Florida.

PERMIT NUMBER: SAJ-1993-00620 (SP-JDP)

PERMITTEE: BREVARD COUNTY

Approximate Central Coordinates:

Location Latitude Longitude NW Corner 28° 24.5067' North (28.408445) 80° 18.9450' West (-80.315750) NE Corner 28° 24.6700' North (28.411166) 80° 17.7467' West (-80.295778) Center 28° 23.0017' North (28.383361) 80° 17.6967' West (-80.294945) SE Corner 28° 21.5367' North (28.358945) 80° 16.4967' West (-80.274945) SW Corner 28° 21.1633' North (28.352721) 80° 17.6483' West (-80.294138)

Permit Conditions

General Conditions:

1. The time limit for completing the work authorized ends on April 30, 2032. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.

4. If you sell the property associated with this permit, you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.

5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.

6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Special Conditions:

1. Reporting Addresses: The Permittee shall reference this permit number, SAJ- 1993-00620 (SP-JDP), on all correspondence. Unless specifically notified to the contrary, the Permittee shall use the following addresses for transmitting correspondence to the referenced agencies:

a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).

For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.

b. National Oceanic and Atmospheric Administration Marine Chart Division Office of Coast Survey, N/CS26, Sta. 7317 1315 East-West Highway Silver Springs, MD 20910-3282 or email (preferred) at ocs.ndb@noaa.gov

c. Commander, U.S. Coast Guard (USCG) Sector Miami 100 McArthur Causeway Miami Beach, Florida 32139

d. Florida Fish and Wildlife Conservation Commission Artificial Reef Program 620 S. Meridian Street, Box 4B2 Tallahassee, Florida 32399 or email at artificialreefdeployments@MyFWC.com

2. Initial Agency Notification: The Permittee shall provide to the U.S. Army Corps of Engineers (Corps), National Oceanic and Atmospheric Administration (NOAA), and U.S. Coast Guard (USCG) written notification of the planned deployment start date at least 2 weeks prior to the initial deployment on the authorized artificial reef site.

mailto:SAJ-RD-Enforcement@usace.army.mil

3. Permit Availability: The Permittee shall provide all contractors associated with construction of the authorized activities a copy of the permit, drawings, and attachments. A copy of the permit shall be available on the work vessels and at the construction site at all times.

4. Authorized Reef Materials: No reef materials or module will weigh less than 500 pounds. Reef materials shall be clean and free from asphalt, petroleum, other hydrocarbons and toxic residues, loose free-floating material or other deleterious substances. All artificial reef materials and/or structures will be selected, designed, constructed, and deployed to create stable and durable marine habitat. The Permittee shall deploy only the following authorized reef materials:

a. Prefabricated artificial reef modules composed of ferrous and/or aluminum-alloy metals, ¼ inch or more in thickness, concrete, rock, or a combination of these materials.

b. Natural rock boulders and other pre-cast concrete material such as culverts, stormwater junction boxes, power poles, railroad ties, jersey barriers, or other similar concrete material.

c. Clean steel and concrete bridge or large building demolition materials such as slabs or pilings with all steel reinforcement rods severed as close to the concrete surface as possible but not to extend more than 6 inches to ensure the rod will not create a fishing tackle or diver ensnaring hazard.

d. Heavy gauge ferrous & aluminum alloy metal material components or structures, ¼ inch or more in thickness, such as utility poles and antenna towers.

e. Heavy gauge ferrous and aluminum alloy metal hulled vessels which equal or exceed 60 feet hull length prepared and deployed in accordance with all applicable U.S. Coast Guard, U.S. Environmental Protection Agency, Florida Fish and Wildlife Conservation Commission, or other applicable state or federal agency regulations or policies. The vessel shall not be deployed until all necessary inspections and clearances have been obtained or waived and a stability analysis has been completed demonstrating the vessel will be stable during a 50-year storm event based on vessel and deployment site characteristics. The Permittee shall follow the national guidance regarding preparation of vessels for deployment as artificial reefs which are available at http://www.epa.gov/owow/oceans/habitat/artificialreefs/index.html. The Permittee shall provide a record of all inspections, clearances or waivers to the Corps along with the pre-deployment notification.

5. Reef Parameters: The Permittee shall deploy all reef materials within the site boundaries as defined in Attachment 1. A minimum clearance of 50 feet from the top of the deployed material relative to mean low water (MLLW) shall be maintained.

6. Emergency Reef Parameters Notification: In the event reef material is deployed in a location or manner contrary to the Reef Parameters Special Condition, the Permittee shall immediately notify the USCG Station and provide information as requested by the station. The Permittee shall notify NOAA, USCG and Corps in writing within 24 hours of the occurrence. The written notification shall include but is not limited to a timeline of events leading to the unanticipated deployment, a description of the material, a description of the vessel traffic in the area, the deployment location in nautical miles at compass bearing from obvious landmarks, the location of the unauthorized material in latitude and longitude coordinates (degree, minute, decimal minute format to the third decimal place), and the water depth above the material from MLW. The document will list the information provided by telephone to the USCG as noted above and include the time of the call and the name of the USCG personnel receiving the information.

7. Protection of Existing Resources: The Permittee shall not deploy artificial reef materials until an assessment of the bottom conditions have been accomplished by diver, submersible video camera, fathometer, depth/bottom sounder (e.g., “fish finder”), or side-scan sonar. The inspection of the deployment area may occur at the time of deployment, but no more than 1 year prior to deployment. The Permittee shall maintain a deployment buffer of at least 200 feet from any submerged beds of seagrasses, coral reefs, live bottom, areas supporting growth of sponges, sea fans, soft corals, and other sessile macroinvertebrates generally associated with rock outcrops, oyster reefs, scallop beds, clam beds, or areas where there are unique or unusual concentrations of bottom-dwelling marine organisms. Should the assessment find any evidence of cultural/archaeological resources such as sunken vessels, ballast, historic refuse piles, or careenage areas, the Permittee shall also maintain a deployment buffer of at least 200 feet from any of these resources.

The Permittee shall provide of the information obtained from the assessment to the Corps no less than 14 days prior to deployment of material on an artificial reef in conjunction with the pre-deployment notification.

8. Pre-Deployment Notification: No less than 14 days prior to deployment of material on an artificial reef, the Permittee shall transmit by electronic mail (“email”) a complete and signed “Florida Artificial Reef Materials Cargo Manifest and Pre- Deployment Notification” form (Attachment 2), to the Corps and Florida Fish and Wildlife Conservation Commission (FWC) to allow inspection of the proposed reef materials as deemed necessary by the agencies. Inspection is allowable at the staging area. By signing the Pre-Deployment Notification, the Permittee certifies all materials are free from asphalt, petroleum, other hydrocarbons and toxic residues. The Permittee shall not deploy material if notified by the Corps or FWC that the material is questionable. The material needs to be evaluated before it is released for deployment.

Any material deemed unacceptable for reef material will be disposed in an approved upland disposal site.

Deployment of the material shall not occur until after the end of the 14-day inspection period. The Permittee shall ensure both a copy of this permit and the signed “Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification” form are maintained aboard the deployment vessel at all times during loading, transit, and deployment.

9. Post-Deployment Placement Report/As-Built Drawing: Within 30 days after deployment of materials, the Permittee shall transmit by email to the Corps, FWC, and NOAA a complete and signed “Florida Artificial Reef Materials Placement Report and Post-Deployment Notification” form (Attachment 3). Please note, the Corps requires the latitude and longitude to be accurate within 5 meters horizontal distance on the post-deployment report. The report shall include an as-built drawing containing the approximate deployment configurations and the height of the material after placement.

Depth shall be verified utilizing fathometer, depth sounder, or similar device accurate to within 1 meter. Also, include information on the condition of the material at the time of deployment. The report and drawing shall be limited to a few pages per deployment.

Representative photographs and/or video, if available, should be submitted.

10. Ownership/Maintenance/Liability: By signing this permit, the Permittee certifies and acknowledges ownership of all artificial reef materials deployed on the reef, accepts responsibility for maintenance of the artificial reef, and possesses the financial ability to assume liability for all damages that may arise with respect to the artificial reef.

11. Manatee Construction Conservation Measures:

a. The Standard Manatee Construction Conditions for In-water Work (2011) must be followed for all in-water activity (Attachment 4).

b. Boats, Tugs, and Accessory Vessels: In any instance where there are two or more vessels operating in the same location or accessory vessels (tugs, barges, boats, etc.) mooring adjacent to one another the vessels shall be outfitted with mooring fenders that provide a minimum of a four foot stand-off distance under maximum compression between the two vessels.

12. Jacksonville District Programmatic Biological Opinion (JAXBO): Structures and activities authorized under this permit will be constructed and operated in accordance with all applicable PDCs contained in the JAXBO, based on the permitted activity. Failure to comply with applicable PDCs will constitute noncompliance with this permit. In addition, failure to comply with the applicable PDCs, where a take of listed species occurs, would constitute an unauthorized take. The NMFS is the appropriate authority to determine compliance with the Endangered Species Act. The most current version of JAXBO can be accessed at the Jacksonville District Regulatory Division website in the Endangered Species section of the Sourcebook located at:

http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx

JAXBO may be subject to revision at any time. The most recent version of these JAXBO must be utilized during the design and construction of the permitted work.

13. Right Whale Protection: Artificial reef material shall not be transported or deployed between November 15 and April 15 for the conservation of the endangered Northern Right Whale within the boundaries of the National Marine Fisheries Service designated Northern Right Whale Southeastern United States critical habitat area.

14. Florida Department of State, Division of Historical Resources: If prehistoric or historic artifacts, such as pottery or ceramics, projectile points, dugout canoes, metal implements, historic building materials, or any other physical remains that could be associated with Native American, early European, or American settlement are encountered at any time within the project site area, the permitted project shall cease all activities involving subsurface disturbance in the vicinity of the discovery. The applicant shall contact the Florida Department of State, Division of Historical Resources, Compliance and Review Section at (850) 245-6333. Project activities shall not resume without verbal and/or written authorization. In the event that unmarked human remains are encountered during permitted activities, all work shall stop immediately and the proper authorities notified in accordance with Section 872.05, Florida Statutes.

Further Information:

1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:

(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx

( ) Section 404 of the Clean Water Act (33 U.S.C. 1344)

( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413)

( ) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408)

2. Limits of this authorization.

a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.

b. This permit does not grant any property rights or exclusive privileges.

c. This permit does not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federal projects.

3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:

a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.

b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation of this permit.

4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.

5. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:

a. You fail to comply with the terms and conditions of this permit.

b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).

c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

6. Extensions: General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit.

25 March 2022

When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY, STATE, AND ZIP CODE)

Attachments to Department of the Army Permit Number SAJ-1993-00620 (SP-JDP)

1. PERMIT DRAWINGS: 7 pages

2. PRE-DEPLOYMENT NOTIFICATION: 2 pages, Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification form

3. POST-DEPOLYMENT PLACEMENT REPORT:

Post-Deployment Placement Report/As-Built Drawing: 1 page, Florida Artificial Reef Materials Placement Report and Post-Deployment Notification form

4. MANATEE CONDITIONS: 2 pages, Standard Manatee Conditions for In-Water Work – 2011

ATTACHMENT 1

PERMIT DRAWINGS: 7 pages

SAJ-1993-00620 (SP-TSD)

Brevard Reef Site 2 Page 1

BREVARD COUNTY ARTIFICIAL REEF SITE 2

(a.k.a. Louis Dubois Artificial Reef Site)

Project Purpose: Brevard County is pursuing reauthorization of Brevard County Artificial Reef

Site 2 based on linked ecological, recreational and economic objectives. By developing a well managed artificial reef site, the County seeks to increase viable habitat for key recreational and commercial fish species along Florida’s Central Atlantic coast. Key fisheries (species) include but are not limited to snapper, grouper, black sea bass, and wreckfish. It has been shown that well managed artificial reef sites can be a driving factor for recreational and commercial fishing and diving in the associated coastal regions. An increase in recreational and commercial use relates directly to an increase in expenditures at regional waterfront business such as bait shops, fishing and diving charters/businesses, and boat sales locations, thus motivating the economy of the associated shoreline community and the region (Florida Sea Grant TP-178, 2011).

Site Description: Located approximately 15.5 nautical miles due east out of Port Canaveral.

This is a previously permitted artificial reef site and is currently plotted on NOAA Chart 11476, Cape Canaveral to Bethel Shoal. Site depth ranges from a minimum of 76.3 ft MLLW at the NW corner to a maximum of 88.4 ft MLLW at the SE corner.

This 3085-acre site was selected due to its lack of hard bottom features and its expanse of open sandy bottom. The area was initially selected and surveyed at 28 bottom locations by the

Kennedy Space Center Barracuda Dive Club in 1987. A detailed side-scan sonar hydrographic survey of the site was conducted by Applied Technology & Management, Inc. for Brevard

County in April 2011. Additional in-field bottom surveys to assess conditions at the project site were conducted by Brevard County on 26 occasions between 2007 and 2021. The sites sandy bottom is mostly uninhabited, with the exception of scattered starfish, sea urchins, and calico scallops.

Material Deployment: Material deployments are not expected to have any negative impacts.

All materials deployed shall avoid those areas previously identified as ledges, contact points, clusters, deployed materials and existing shipwrecks. All newly deployed materials shall be placed a minimum of 200 ft from existing bottom features. The presence and stability of a variety of previously deployed artificial reef materials indicates stable bottom type for future artificial reef placement and stability during extreme storm events. The incidental disturbance of any existing bottom features will be offset by the net positive impact related to the habitat created by materials deployed.

The overall pattern of materials deployed on the reef site will be dependent upon the type and size of materials available for deployment. Brevard County will work closely with the Florida

Fish and Wildlife Conservation Commission to determine the best location for the materials available at each deployment. To ensure that all deployments are maintained within the project site, all materials shall be placed a minimum of 500 feet from the perimeter of the site. The

County anticipates one or two deployments each year, with approximately fifteen deployments expected over the next ten years.

Brevard Reef Site 2 Page 2

In order to confirm bottom conditions, the County shall make reconnaissance dives at deployment sites prior to the placement of any materials. Prior to the deployment of any artificial reef materials, completed materials manifest and pre-deployment notification forms shall be submitted to the Army Corps of Engineers, Florida Fish & Wildlife Conservation Commission and/or the U.S. Coast Guard, as required. Materials will be transported to the site by barge or tow vessel. To avoid manatee entrapment, if more than one barge is used for a deployment, fenders will be utilized to maintain separation between barges.

Brevard County will employ required precautionary measures and comply with all threatened or endangered species requirements related to manatee, sea turtles and whales. No reef materials shall be transported or deployed between November 15 and April 14 for the conservation of the

Northern Right Whale.

All deployed materials shall maintain a minimum clearance of 50 ft from the surface.

Typical Site Diagram – (not to scale)

Height of reef material will be 50 feet minimum from surface.

Proposed Material: Material deployed to the reef site will be durable and stable in a 20 year return storm event at the site depths. Materials to be deployed may include:

• Prefabricated artificial reef modules composed of ferrous and/or aluminum-alloy metals ¼ inch or more in thickness, concrete, rock or a combination of these materials.

• Natural rock boulders and other pre-cast concrete material, such as, culverts, stormwater junction boxes, power poles, railroad ties, jersey barriers, or other similar concrete material.

• Large concrete building demolition materials, such as bridges, with all steel reinforced rods severed to ensure the rods will not create a fishing tackle or diver ensnaring hazard.

• Heavy gauge ferrous & aluminum alloy metal material components of structures, ¼ inch or more in thickness, such as utility poles and antenna towers.

The above materials will weigh in excess of 500 pounds and be clean and free from asphalt, creosote, petroleum, other hydrocarbons and toxic residues, and loose of free floating

Bottom

Surface

80’ MLLW (average)

50’ min.

Material Typical

Brevard Reef Site 2 Page 3 materials or other deleterious substances. Materials will be designed, selected and deployed in a manner as to avoid entrapping marine life.

• Heavy gauge ferrous & aluminum alloy metal hulled vessels which equal or exceed 60 ft hull length prepared and deployed in accordance with all applicable U.S. Coast Guard, USEPA, Florida Fish & Wildlife Conservation Commission, or other applicable state or federal agency regulations or policies. The vessel will not be deployed until all necessary inspections or clearances have been obtained or waived and a stability analysis has been completed.

Monitoring: Reef monitoring will be conducted by the Brevard County Natural Resources

Management Office. Monitoring shall take place during suitable weather and consist of photo-documentation of the reef site. Photography will be used to relate reef age and colonization rates.

Pelagic fish surveys will also be conducted. At the minimum, monitoring will take place during the Fall and Spring.

Contact Information: Brevard County Natural Resources Management Department

Boating & Waterways Program

C/o Mr. Matt C. Culver

2725 Judge Fran Jamieson Way

Building A, Room 219

Viera, FL 32940

Site Location Information

Port Carrav~ I . ....ra Entrance t C~nter of Site, 11:ss o mi. • s enter of Site 28° 23.0017' N 80° 17.6967' w

Center of Site: 28° 23.0017' (28.38336°) N, 80° 17.6967' (80.29494°) W

I I

_/1, I at t, ~ ., s

Site Location Information

NW Corner 28° 24.5067' N 80° 18.9450' w n

NE Corner 28° 24.6700' N

Center 28° 23.0017' N 80° 17 .6967' W

Site Area:

3085 Acres

(;Q

1 I t 11

I I

OI

11:, /. fLt ,., SE Corner

28° 21.5367' N 80° 16.4967' W

SW Corner 28° 21.1633' N 80° 17 .6483' W

:I

NW Corner: 28° 24.5067' (28.40844°) N, 80° 18.9450' (80.31575°) W / NE Corner: 28° 24.6700' (28.41117°) N, 80° 17.7467' (80.29578°) W SW Corner: 28° 21.1633' {28.35272°) N, 80° 17.6483' (80.29414°) W / SE Corner: 28° 21.5367' (28.35894°) N, 80° 16.4967' (80.27494°) W

\ 78

75 )</

WATER DEPTHS

DEPTHS ARE REFERENCED TO

MEAN LOWER LOW WATER

DEPTH RANGES FROM 76.3 TO 88.4 FT

Submerged Site Features Natural, Pre-existing & Deployed Site Features

A

., . A

Legend

A Deployed rvlaterials

• Natural Features & Existing rvlaterials

0 Permitted Reef Area

• ~'""""!l•..,=ii:t"-m"'r:Ji'"

A

I);

rnr

ATTACHMENT 2

PRE-DEPLOYMENT NOTIFICATION: 2 pages, Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification form k3rdnjdp Rectangle

ATTACHMENT 3

POST-DEPOLYMENT PLACEMENT REPORT:

Post-Deployment Placement Report/As-Built Drawing: 1 page, Florida Artificial Reef Materials Placement Report and Post-Deployment

Notification form

ATTACHMENT 4

MANATEE CONDITIONS: 2 pages, Standard Manatee Conditions for In- Water Work – 2011

Attachment D

FWC Project Grant

Attachment E

Reef Materials

reeflocation.pdf