Attachments 25QA012.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ25QA012
About this file
This Performance Work Statement (PWS) details grounds maintenance services for the U.S. Army Corps of Engineers at Birch Hill Dam and Tully Lake Dam in Royalston, Massachusetts for the year 2025. The document outlines specific maintenance requirements including weekly mowing, pavement cleaning, and spring/fall cleanup for both dam locations, with geospatial maps (Figures 1-7) precisely delineating the areas and scope of work.
The procurement is set aside for small businesses under NAICS code 561730 with a small business size standard of $9.5 million. Contractors must provide all necessary equipment, materials, labor, and transportation to perform grounds maintenance services. Key requirements include maintaining designated areas through regular mowing, cleaning pavements, and conducting comprehensive spring and fall cleanup operations. Vendors must have an active SAM.gov registration to be considered responsive, and the work must be completed in strict accordance with the performance specifications outlined in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ25QA012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUNDS MAINTENANCE SERVICES
U.S. ARMY CORPS OF ENGINEERS
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
PERFORMANCE WORK STATEMENT
Figure 1: Tully Lake Spring and Fall Clean Up Recreational Area
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 2: Tully Lake Weekly Mow and Weekly Pavement Clean
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 3: Tully Lake Spring and Fall Clean Up Administrative Area
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 4: Birch Hill Dam Weekly Mow, Pavement Cleaning, and Spring Cleanup
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 5: Birch Hill Dam Weekly Mow, Pavement Cleaning, and Spring Cleanup
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 6: Birch Hill Dam Weekly Mow, Pavement Cleaning, and Spring Cleanup
BIRCH HILL DAM AND TULLY LAKE DAM
ROYALSTON, MA
Figure 7: Birch Hill Dam Spring Cleanup
File details come from the government source that posted it. Updated .