AttachmentC_CI5585_AsBuiltDrawings.pdf

PDF 179 MB Posted

Attached to
Municipal Service Center Microgrid and Backup Power
Solicitation number
CI5585
Issued by
Ventura County, California

About this file

The file "AttachmentC_CI5585_AsBuiltDrawings.pdf" is associated with the City of Thousand Oaks' Municipal Service Center Microgrid and Backup Power project in Ventura County, California. The project involves integrating an existing 283 kW-AC solar photovoltaic system with a new battery energy storage system (BESS) of at least 500 kWh capacity and a new 120 kW natural gas generator. The successful contractor will be responsible for procurement and construction of the generator and switchboard, and design and engineering of the BESS, meters, data acquisition systems, electrical infrastructure, controls hardware and software, and monitoring software. A mandatory pre-proposal meeting is scheduled for August 6, 2025, with proposal submissions due by September 3, 2025. The project is planned in two phases, with Phase 1 (generator construction and microgrid design) to be completed by June 30, 2026, and Phase 2 (microgrid construction) to be completed by August 31, 2027.

The project is partially funded by a Federal Emergency Management Agency (FEMA) grant and is eligible for clean energy tax benefits under the Inflation Reduction Act's Direct Pay/Elective Pay provision. Contractors must possess a Class A license, Class C-10 license, and have a California-licensed Professional Engineer in Electrical Engineering. Proposers will be evaluated based on project understanding, key personnel qualifications, subcontractor qualifications, past experiences, creativity, schedule reasonableness, cost, and client references. The procurement appears to be open to qualified contractors without specific set-aside designations for disadvantaged enterprises. The existing electrical infrastructure includes a Time-of-Use (TOU) rate plan with monthly electricity usage ranging from 3,000 to 14,000 kilowatt-hours and monthly charges between $2,900 and $6,100. The City will own all components of the generator and microgrid, with a separate agreement to cover the one-year Operations and Maintenance (O&M) period.

View the file

Other files

File Type Posted
Municipal_Service_Center_Microgrid_and_Backup_Power_(Addendum_#3_Revision).pdf PDF
AttachmentN_CI5585_MSC_GeneratorReplacementDesign_Updated_8.21.25.pdf PDF
Municipal_Service_Center_Microgrid_and_Backup_Power.pdf PDF
AttachmentH_GeneralConditions.pdf PDF
AttachmentH_GeneralConditions.pdf PDF
AttachmentK_SampleAgreement.pdf PDF
AttachmentK_SampleAgreement.pdf PDF
AttachmentN_CI5585_MSC_GeneratorReplacementDesign.pdf PDF
AttachmentI_DesignGuidelines.pdf PDF
AttachmentI_DesignGuidelines.pdf PDF
AttachmentJ_CPM_Specifications.pdf PDF
AttachmentJ_CPM_Specifications.pdf PDF
AttachmentA_CI5585_ScopeOfWork.pdf PDF
AttachmentA_CI5585_ScopeOfWork.pdf PDF
AttachmentL_FEMA_Requirements.pdf PDF
AttachmentL_FEMA_Requirements.pdf PDF
AttachmentC_CI5585_AsBuiltDrawings.pdf PDF
AttachmentD_CI5585_Utility_PotholingReports.pdf PDF
AttachmentF_CI5585_ElectricityBills.pdf PDF
AttachmentE_CI5585_GeotechReports.pdf PDF
AttachmentG_CI5585_Utility_Solar_IntervalData.csv CSV file
AttachmentM_Performance_PaymentBonds.pdf PDF
AttachmentD_CI5585_Utility_PotholingReports.pdf PDF
AttachmentE_CI5585_GeotechReports.pdf PDF
AttachmentG_CI5585_Utility_Solar_IntervalData.csv CSV file
AttachmentM_Performance_PaymentBonds.pdf PDF
AttachmentF_CI5585_ElectricityBills.pdf PDF
AttachmentB_CI5585_VicinityLocationMaps.pdf PDF
AttachmentB_CI5585_VicinityLocationMaps.pdf PDF
General_Services_Agreement_Template_Revision_9.18.23.docx DOCX document
General_Services_Agreement_Template_Revision_9.18.23.docx DOCX document
PS_Template_Update_9.18.23.docx DOCX document
PS_Template_Update_9.18.23.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .