AttachmentC_CI5585_AsBuiltDrawings.pdf
PDF 179 MB Posted
- Solicitation number
- CI5585
- Issued by
- Ventura County, California
About this file
The file "AttachmentC_CI5585_AsBuiltDrawings.pdf" is associated with the City of Thousand Oaks' Municipal Service Center Microgrid and Backup Power project in Ventura County, California. The project involves integrating an existing 283 kW-AC solar photovoltaic system with a new battery energy storage system (BESS) of at least 500 kWh capacity and a new 120 kW natural gas generator. The successful contractor will be responsible for procurement and construction of the generator and switchboard, and design and engineering of the BESS, meters, data acquisition systems, electrical infrastructure, controls hardware and software, and monitoring software. A mandatory pre-proposal meeting is scheduled for August 6, 2025, with proposal submissions due by September 3, 2025. The project is planned in two phases, with Phase 1 (generator construction and microgrid design) to be completed by June 30, 2026, and Phase 2 (microgrid construction) to be completed by August 31, 2027.
The project is partially funded by a Federal Emergency Management Agency (FEMA) grant and is eligible for clean energy tax benefits under the Inflation Reduction Act's Direct Pay/Elective Pay provision. Contractors must possess a Class A license, Class C-10 license, and have a California-licensed Professional Engineer in Electrical Engineering. Proposers will be evaluated based on project understanding, key personnel qualifications, subcontractor qualifications, past experiences, creativity, schedule reasonableness, cost, and client references. The procurement appears to be open to qualified contractors without specific set-aside designations for disadvantaged enterprises. The existing electrical infrastructure includes a Time-of-Use (TOU) rate plan with monthly electricity usage ranging from 3,000 to 14,000 kilowatt-hours and monthly charges between $2,900 and $6,100. The City will own all components of the generator and microgrid, with a separate agreement to cover the one-year Operations and Maintenance (O&M) period.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .