AttachmentF_CI5585_ElectricityBills.pdf
PDF 1 MB Posted
- Solicitation number
- CI5585
- Issued by
- Ventura County, California
About this file
The attached files contain electricity bills from Southern California Edison (SCE) and Clean Power Alliance (CPA) for the Thousand Oaks Municipal Service Center from December 2022 to December 2023, documenting monthly electricity usage and charges for a facility located at 1993 Rancho Conejo Blvd, Unit A. These bills are part of the supporting documentation for the Municipal Service Center Microgrid and Backup Power project, which aims to integrate an existing solar photovoltaic system, a new battery energy storage system (BESS), and a recently designed natural gas generator to enable off-grid autonomous operation, utility energy arbitrage, and peak demand reduction.
The electricity bills show a consistent monthly usage ranging from approximately 3,000 to 14,000 kilowatt-hours, with total monthly charges fluctuating between $2,900 and $6,100. The bills indicate the facility is on a Time-of-Use (TOU) rate plan with different pricing for peak, mid-peak, and off-peak hours, and is participating in a Net Energy Metering (NEM) program. The bills are split between Southern California Edison's delivery charges and Clean Power Alliance's generation charges, with the facility opting for a 100% Green Power option. The documents suggest the facility is preparing for increased energy resilience and sustainability through the planned microgrid project, which will likely help manage and potentially reduce electricity costs while providing backup power capabilities.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F – ELECTRICITY BILLS
SOUTHERN CALIFORNIA EDISON – FACILITY SERVICE ACCOUNT
(106 PAGES)
CI 5585 – MUNICIPAL SERVICE CENTER MICROGRID AND BACKUP
POWER
THOUSAND OAKS, CITY OF / Page 1 of 8
Your electricity bill
Customer Account 700341481470
2100 E THOUSAND OAKS
BLVD
THOUSAND OAKS, CA
91362-2999
Date bill prepared 01/10/23 Amount due $4,265.70
Due by 01/30/23
For billing and service inquiries 1-866-701-7869 www.sce.com
Your account summary Previous Balance $4,179.21 Payment Received 12/28/22 -$4,179.21 Balance forward $0.00 Your new charges $4,265.70
Total amount you owe by 01/30/23 $4,265.70
Net energy metering monthly billing month #5.
For information concerning your net consumption and generation, please refer to the "Details of your tracked charges" section of the bill.
Summary of your billing detail Service account Service address Billing period Your rate New charges
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
12/07/22 to 01/05/23 NEM TOU-GS-2-D $1,542.71
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
12/07/22 to 01/05/23 TOU-GS-2-D-APS-E
(SCE)
$2,722.99
$4,265.70
P.O. BOX 300
ROSEMEAD, CA 91772-0002
Customer account 700341481470 Please write this number on the memo line of your check. Make your check payable to Southern California Edison.
700341481470 0000485 000000000000426570000426570
Please return the payment stub below with your payment and make your check payable to Southern California Edison.
If you want to pay in person, call 1-800-747-8908 for locations, or you can pay online at www.sce.com.(14-574) Tear here Tear here
STMT 01102023 P1
THOUSAND OAKS, CITY OF
PW MSC FACILITY
2100 E THOUSAND OAKS BLVD
THOUSAND OAKS CA 91362-2999
Amount due by 01/30/23 $4,265.70
Amount enclosed $
THOUSAND OAKS, CITY OF / Page 2 of 8
Important information What are my options for paying my bill?
On-line Pay one-time or recurring on www.sce.com/bill Mail-in Check or Money order
In Person Authorized payment locations 1-800-747-8908 Phone QuickCheck 1-800-950-2356
Debit & credit card * 1-800-254-4123 *Residential customers only
Electronic check processing Your check payment will be processed as a one-time Electronic Fund Transfer (EFT). With EFTs, funds may be withdrawn from your account the day we receive your payment. Your check will not be returned, but will appear on your financial statement.
Rates and applicable rules: Available at www.sce.com or upon request.
Past due bills When is my bill past due? It is past due 20 days after the preparation date, which was 01/10/23.
• Reconnecting service that has been disconnected requires a Service Connection payment (non-residential only).
• Unable to pay: If payment arrangements were not extended to you by SCE pursuant to SCE’s filed tariffs, you may contact the California Public Utilities Commission.
• For safety reasons, if service is disconnected, please ensure any sensitive or potentially hazardous equipment is unplugged on the day of reconnection. For additional home safety tips, visit www.sce.com/safety or call SCE at 1-800-655-4555.
What is the Late Payment Charge (LPC)?
0.6% will be applied to the total unpaid balance if payment is not received by the due date on this bill (except for CARE and state agency accounts).
What is a rotating outage?
Rotating outages are controlled electrical outages used to avoid widespread or uncontrolled blackouts. Your Rotating Outage Group number is located on page 1, upper left, of your SCE bill. Your rotating outage group number may change at any time. For more information, visit www.sce.com/rotating outage.
What is the Power Charge Indifference Adjustment (PCIA)?
The PCIA is a charge to ensure that both SCE customers and those who have left SCE service to purchase electricity from other providers pay for the above market costs for electric generation resources that were procured by SCE on their behalf.
'Above market' refers to the difference between what the utility pays for electric generation and current market prices for the sale of those resources.
Disputed bills If you believe there is an error on your bill or have a question about your service, please call Southern California Edison (SCE) customer support at 1-800-655-4555. If you are not satisfied with SCE’s response, submit a complaint to the California Public Utilities Commission (CPUC) at www.cpuc.ca.gov/ complaints/. The CPUC’s Consumer Affairs Branch (CAB) handles billing and service complaints and can be reached by:
Telephone 1-800-649-7570 (8:30 AM - 4:30 PM, Monday - Friday) Mail CPUC, Consumer Affairs Branch, 505 Van Ness Ave., Room 2003, San Francisco, CA 94102 If you have limitations hearing or speaking, contact the California Relay Service, which is for those needing assistance relaying telephone conversations. Dial 711 or one of the numbers below to be routed to a California Relay Service provider in your preferred mode of communication.
Type of Call English Spanish
TTY/VCO/HCO to Voice 1-800-735-2929 1-800-855-3000
Voice to TTY/VCO/HCO 1-800-735-2922 1-800-855-3000
Speech-to-Speech Relay 1-800-854-7784 1-800-854-7784
To avoid having service turned off while waiting for the outcome of a complaint to the CPUC regarding the accuracy of your bill, contact CAB for assistance. If your case meets the eligibility criteria, CAB will instruct you on how to mail a check or money order to be impounded pending resolution of your case. You must continue to pay your current charges while your complaint is reviewed to keep your service turned on.
Definitions
• Baseline Credit: The baseline credit provides reduced electricity rates on electricity used up to the baseline allocation for the region that you live in.
• CA Climate Credit: Credit from state effort to fight climate change. Applied monthly to eligible businesses and semi-annually to residents.
• Wildfire Fund Charge: Supports the California Wildfire Fund which covers costs associated with catastrophic wildfires, including payment of bonds issued by the California Department of Water Resources (DWR)
• Public Purpose Programs Charge: Funds state-mandated programs for low income discounts, energy efficiency, renewable energy and R&D.
• SCE Generation: For recovering energy procurement and generation costs for that portion of your energy provided by SCE.
Change of mailing address: 700341481470
STREET# STREET NAME APARTMENT #
CITY STATE ZIP CODE
TELEPHONE # E-MAIL ADDRESS
To change your contact information or enroll in SCE's payment option, complete the form below and return it in the enclosed envelope.
Direct Payment (Automatic Debit) Enrollment: 700341481470 I hereby authorize SCE and my financial institution to automatically deduct my monthly payment from the checking account as shown on my enclosed check, ten calendar days after my bill is mailed.
Signature _____________________________________ Date ____________
To change your checking account information or to be removed from the Direct Payment program please call SCE at 1-800-655-4555.
Energy Assistance Fund (EAF): I want to help people pay their energy bill through EAF. For info visit www.sce.com/eaf or call (800) 205-8596.
Add this amount for EAF $ __________________ Select one box only and sign below for EAF:
Every Month
One Month only ________________________________________________________________
THOUSAND OAKS, CITY OF / Page 3 of 8
Things you should know Energy Price Change You may notice a change in your billing statement. Effective 01/01/2023, the billing rates used to calculate your bill have been modified.
For more information, please visit www.sce.com/bill_change.
Fixed Recovery Charge SCE has been permitted to issue bonds that enable it to recover more quickly certain costs related to preventing and mitigating catastrophic wildfires. Your bill for electric service includes a Fixed Recovery Charge that has been approved by the CPUC to repay those bonds. The right to recover the Fixed Recovery Charge has been transferred to a separate entity (called the Special Purpose Entity) that issued the bonds and does not belong to SCE. SCE is collecting the Fixed Recovery Charge on behalf of the Special Purpose Entity.
DWR Adjustment This is a refund from the California Department of Water Resources (DWR) relating to the purchase of power during the 2000-2001 energy crisis. The adjustment line item will only appear on bills of customers who previously paid the DWR Bond Charge.
THOUSAND OAKS, CITY OF / Page 4 of 8
Service account 8012476761 POD-ID Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
DELIVERY
SOUTHERN CALIFORNIA EDISON
delivers your electricity
Your cost varies by time of day Winter cost periods (Oct 01-May 31)
Weekdays Weekends & Holidays Mid peak 4pm - 9pm 4pm - 9pm Off peak 12am - 8am 12am - 8am
9pm - 12am 9pm - 12am Super off peak 8am - 4pm 8am - 4pm
Your past and current electricity usage Your next billing cycle for meter 259000-081080 will end on or about 02/05/23.
Reactive usage is 8,699 kVarh
Electricity (kWh) Demand (kW) Winter Season - Consumption Mid Peak 6,054 70 01/03/23 05:00pm-05:15pm Off peak 12,472 70 12/12/22 06:30am-06:45am Super off peak 1,030 58 01/03/23 03:45pm-04:00pm
Winter Season –Allocated Generation Mid Peak 0 Off peak -6 Super off peak -4,766
Total 14,784
Your daily average electricity usage (kWh)
Jan '21** Jan '22** Dec '22 Jan '23
* Irregular billing period ** No data available
Usage comparison Jan '21
Jan '22
Feb '22 Mar '22 Apr '22 May '22 Jun '22 Jul '22 Aug '22
Sep '22
Oct '22 Nov '22 Dec '22 Jan '23
Total kWh used 26,495 30,840 27,365 29,579 30,472 35,266 66,749 4,643 9,413 12,462 13,088 14,784
Number of days 29 32 29 30 32 30 54 7 29 30 33 30
Appx. average kWh used/day
913 963 943 985 952 1,175 1,236 663 324 415 396 492
Details of your new charges Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 12/07/22 to 01/05/23 (30 days)
Delivery charges - Cost to deliver your electricity Facilities rel demand 70 kW x $21.62000 x 25/30 days $1,261.17 Facilities rel demand 70 kW x $20.97000 x 5/30 days $244.65
(Continued on next page)
THOUSAND OAKS, CITY OF / Page 5 of 8
Details of your new charges (continued) Demand-Winter
Mid peak 70 kW x $2.20000 x 25/30 days $128.33 Mid peak 70 kW x $2.16000 x 5/30 days $25.20
Energy-Winter Mid peak 4,974 kWh x $0.02621 $130.37 Off peak 10,399 kWh x $0.02491 $259.04 Super off peak -3,588 kWh x $0.02417 -$86.72 Mid peak 1,080 kWh x $0.02079 $22.45 Off peak 2,067 kWh x $0.01951 $40.33 Super off peak -148 kWh x $0.01878 -$2.78
Customer charge $158.12 NEM Agg monthly fee $2.70 Customer charge $31.02
CCA cost responsibility surcharge PCIA 11,785 kWh x $0.00287 $33.82 PCIA 2,999 kWh x -$0.00335 -$10.05
Nonbypassable charges (NBCs) CTC, NDC, PPPC 16,055 kWh x $0.01914 $307.29 CTC, NDC, PPPC 3,501 kWh x $0.01807 $63.26 Fixed recovery charge 16,055 kWh x $0.00089 $14.29 Wildfire fund charge 16,055 kWh x $0.00652 $104.68 Fixed recovery charge 3,501 kWh x $0.00066 $2.31 Wildfire fund charge 3,501 kWh x $0.00530 $18.56 DWR adjustment 19,556 kWh x -$0.00208 -$40.68
Other charges or credits Generation Municipal Surcharge $15.63
Subtotal of your new charges $2,722.99 Your new charges $2,722.99
Your Delivery charges include:
· $354.23 transmission charges
· $1,714.14 distribution charges
· $123.59 new system generation charge
Your overall energy charges include:
· $25.05 franchise fees
Additional information:
· Service voltage: 208 volts
· Generation Municipal Surcharge
(GMS) factor: 0.009261
· 2010 Vintage CRS
THOUSAND OAKS, CITY OF / Page 6 of 8
Details of your tracked charges Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 12/07/22 to 01/05/23 (30 days)
Delivery charges - Cost to deliver your electricity Energy-Winter
Mid peak 4,974 kWh x $0.02621 $130.37 Off peak 10,399 kWh x $0.02491 $259.04 Super off peak -3,588 kWh x $0.02417 -$86.72 Mid peak 1,080 kWh x $0.02079 $22.45 Off peak 2,067 kWh x $0.01951 $40.33 Super off peak -148 kWh x $0.01878 -$2.78
CCA cost responsibility surcharge
PCIA 11,785 kWh x $0.00287 $33.82 PCIA 2,999 kWh x -$0.00335 -$10.05
Energy Charge Total $386.46
Additional information regarding your Net Consumption/Generation:
· Virtual Net Energy Metering Month
#5
· Your year-to-date energy generation credit as of previous month: $0.00
· Your current month energy generation credit: $0.00
· Your year-to-date energy generation credit: $0.00
· Your year-to-date net energy consumption/generation: $1,474.22
· Your year-to-date energy billed charges: $1,474.22
· Your year-to-date kWh: 54,390 kWh
THOUSAND OAKS, CITY OF / Page 7 of 8
Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
SUPPLY/GENERATION
CLEAN POWER ALLIANCE
supplies your electricity
Details of your new charges
CLEAN POWER ALLIANCE
Your rate: NEM TOU-GS-2-D Service Account: 8012476761 Billing period: 12/07/22 to 01/05/23 (30 days)
Generation Charges Demand - Mid-Peak - Winter 51 kW @ 5.07 $258.57 100% Green Power - Super OfPk - Winter
-3736 kWh @ 0.04619 -$172.57
100% Green Power - Off-Peak - Winter
12466 kWh @ 0.07364 $918.00
100% Green Power - Mid-Peak - Winter
6054 kWh @ 0.08825 $534.27
Energy Surcharge $4.44
Sub-Total of CPA Generation Charges $1,542.71
Your New Charges $1,542.71
Additional Information
· Your NEM Balance Owed is $0.00.
· Your cumulative kWh relevant period year-to-date: 54390 kWh
Things you should know Rate freeze for CARE, FERA and Medical Baseline customers ends October 1, 2022 The rate freeze for CARE, FERA and Medical Baseline customers, a bill subsidy implemented in May 2020 as a COVID-19 relief effort to keep rates unchanged for customers during the height of the pandemic, will end October 1, 2022. Standard discounted CARE, FERA and Baseline Medical rates will resume at that time. To learn more, visit CleanPowerAlliance.org/AssistanceInfo. If you need help with your bill, CPA customers are eligible for debt forgiveness and rate reduction programs. Learn more at CleanPowerAlliance.org/CPAbillhelp.
Stay up to date with CPA news and events Sign up for our newsletter at CleanPowerAlliance.org to receive CPA news and event information in your inbox. Also, follow us on social media to stay up to date. We're on Facebook, Instagram, LinkedIn, and Twitter.
CPA's Privacy Policy Clean Power Alliance's privacy policy is available at CleanPowerAlliance.org/privacy-policy.
THOUSAND OAKS, CITY OF / Page 8 of 8
Customer Account 700341481470
2100 E THOUSAND OAKS
BLVD
THOUSAND OAKS, CA
91362-2999
Date bill prepared 02/09/23 Amount due $3,977.09
Due by 03/01/23
For billing and service inquiries 1-866-701-7869 www.sce.com
Your account summary Previous Balance $4,265.70 Payment Received 01/25/23 -$4,265.70 Balance forward $0.00 Your new charges $3,977.09
Total amount you owe by 03/01/23 $3,977.09
Net energy metering monthly billing month #6.
For information concerning your net consumption and generation, please refer to the "Details of your tracked charges" section of the bill.
Summary of your billing detail Service account Service address Billing period Your rate New charges
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
01/06/23 to 02/05/23 TOU-GS-2-D-APS-E
(SCE)
$2,582.23
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
01/06/23 to 02/05/23 NEM TOU-GS-2-D $1,394.86
$3,977.09
P.O. BOX 300
ROSEMEAD, CA 91772-0002
Customer account 700341481470 Please write this number on the memo line of your check. Make your check payable to Southern California Edison.
700341481470 0000481 000000000000397709000397709
Please return the payment stub below with your payment and make your check payable to Southern California Edison.
If you want to pay in person, call 1-800-747-8908 for locations, or you can pay online at www.sce.com.(14-574) Tear here Tear here
STMT 02092023 P1
THOUSAND OAKS, CITY OF
PW MSC FACILITY
2100 E THOUSAND OAKS BLVD
THOUSAND OAKS CA 91362-2999
Amount due by 03/01/23 $3,977.09
What are my options for paying my bill?
On-line Pay one-time or recurring on www.sce.com/bill Mail-in Check or Money order
In Person Authorized payment locations 1-800-747-8908 Phone QuickCheck 1-800-950-2356
Debit & credit card * 1-800-254-4123 *Residential customers only
Electronic check processing Your check payment will be processed as a one-time Electronic Fund Transfer (EFT). With EFTs, funds may be withdrawn from your account the day we receive your payment. Your check will not be returned, but will appear on your financial statement.
Rates and applicable rules: Available at www.sce.com or upon request.
Past due bills When is my bill past due? It is past due 20 days after the preparation date, which was 02/09/23.
• Reconnecting service that has been disconnected requires a Service Connection payment (non-residential only).
• Unable to pay: If payment arrangements were not extended to you by SCE pursuant to SCE’s filed tariffs, you may contact the California Public Utilities Commission.
• For safety reasons, if service is disconnected, please ensure any sensitive or potentially hazardous equipment is unplugged on the day of reconnection. For additional home safety tips, visit www.sce.com/safety or call SCE at 1-800-655-4555.
What is the Late Payment Charge (LPC)?
0.6% will be applied to the total unpaid balance if payment is not received by the due date on this bill (except for CARE and state agency accounts).
What is a rotating outage?
Rotating outages are controlled electrical outages used to avoid widespread or uncontrolled blackouts. Your Rotating Outage Group number is located on page 1, upper left, of your SCE bill. Your rotating outage group number may change at any time. For more information, visit www.sce.com/rotating outage.
What is the Power Charge Indifference Adjustment (PCIA)?
The PCIA is a charge to ensure that both SCE customers and those who have left SCE service to purchase electricity from other providers pay for the above market costs for electric generation resources that were procured by SCE on their behalf.
'Above market' refers to the difference between what the utility pays for electric generation and current market prices for the sale of those resources.
Disputed bills If you believe there is an error on your bill or have a question about your service, please call Southern California Edison (SCE) customer support at 1-800-655-4555. If you are not satisfied with SCE’s response, submit a complaint to the California Public Utilities Commission (CPUC) at www.cpuc.ca.gov/ complaints/. The CPUC’s Consumer Affairs Branch (CAB) handles billing and service complaints and can be reached by:
Telephone 1-800-649-7570 (8:30 AM - 4:30 PM, Monday - Friday) Mail CPUC, Consumer Affairs Branch, 505 Van Ness Ave., Room 2003, San Francisco, CA 94102 If you have limitations hearing or speaking, contact the California Relay Service, which is for those needing assistance relaying telephone conversations. Dial 711 or one of the numbers below to be routed to a California Relay Service provider in your preferred mode of communication.
Type of Call English Spanish
TTY/VCO/HCO to Voice 1-800-735-2929 1-800-855-3000
Voice to TTY/VCO/HCO 1-800-735-2922 1-800-855-3000
Speech-to-Speech Relay 1-800-854-7784 1-800-854-7784
To avoid having service turned off while waiting for the outcome of a complaint to the CPUC regarding the accuracy of your bill, contact CAB for assistance. If your case meets the eligibility criteria, CAB will instruct you on how to mail a check or money order to be impounded pending resolution of your case. You must continue to pay your current charges while your complaint is reviewed to keep your service turned on.
Definitions
• Baseline Credit: The baseline credit provides reduced electricity rates on electricity used up to the baseline allocation for the region that you live in.
• CA Climate Credit: Credit from state effort to fight climate change. Applied monthly to eligible businesses and semi-annually to residents.
• Wildfire Fund Charge: Supports the California Wildfire Fund which covers costs associated with catastrophic wildfires, including payment of bonds issued by the California Department of Water Resources (DWR)
• Public Purpose Programs Charge: Funds state-mandated programs for low income discounts, energy efficiency, renewable energy and R&D.
• SCE Generation: For recovering energy procurement and generation costs for that portion of your energy provided by SCE.
Change of mailing address: 700341481470
STREET# STREET NAME APARTMENT #
CITY STATE ZIP CODE
TELEPHONE # E-MAIL ADDRESS
To change your contact information or enroll in SCE's payment option, complete the form below and return it in the enclosed envelope.
Direct Payment (Automatic Debit) Enrollment: 700341481470 I hereby authorize SCE and my financial institution to automatically deduct my monthly payment from the checking account as shown on my enclosed check, ten calendar days after my bill is mailed.
Signature _____________________________________ Date ____________
To change your checking account information or to be removed from the Direct Payment program please call SCE at 1-800-655-4555.
Energy Assistance Fund (EAF): I want to help people pay their energy bill through EAF. For info visit www.sce.com/eaf or call (800) 205-8596.
Add this amount for EAF $ __________________ Select one box only and sign below for EAF:
Every Month
Fixed Recovery Charge SCE has been permitted to issue bonds that enable it to recover more quickly certain costs related to preventing and mitigating catastrophic wildfires. Your bill for electric service includes a Fixed Recovery Charge that has been approved by the CPUC to repay those bonds. The right to recover the Fixed Recovery Charge has been transferred to a separate entity (called the Special Purpose Entity) that issued the bonds and does not belong to SCE. SCE is collecting the Fixed Recovery Charge on behalf of the Special Purpose Entity.
DWR Adjustment This is a refund from the California Department of Water Resources (DWR) relating to the purchase of power during the 2000-2001 energy crisis. The adjustment line item will only appear on bills of customers who previously paid the DWR Bond Charge.
Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
DELIVERY
SOUTHERN CALIFORNIA EDISON
delivers your electricity
Your cost varies by time of day Winter cost periods (Oct 01-May 31)
Weekdays Weekends & Holidays Mid peak 4pm - 9pm 4pm - 9pm Off peak 12am - 8am 12am - 8am
9pm - 12am 9pm - 12am Super off peak 8am - 4pm 8am - 4pm
Your past and current electricity usage Your next billing cycle for meter 259000-081080 will end on or about 03/06/23.
Reactive usage is 9,150 kVarh
Electricity (kWh) Demand (kW) Winter Season - Consumption Mid Peak 5,643 58 01/09/23 04:00pm-04:15pm Off peak 12,582 77 01/19/23 06:45am-07:00am Super off peak 963 58 01/09/23 08:30am-08:45am
Winter Season –Allocated Generation Mid Peak -22 Off peak -4 Super off peak -6,578
Total 12,584
Your daily average electricity usage (kWh)
Feb '21** Feb '22 Jan '23 Feb '23
* Irregular billing period ** No data available
Usage comparison Feb '21
Feb '22 Mar '22 Apr '22 May '22 Jun '22 Jul '22 Aug '22
Sep '22
Oct '22 Nov '22 Dec '22 Jan '23 Feb '23
Total kWh used 26,495 30,840 27,365 29,579 30,472 35,266 66,749 4,643 9,413 12,462 13,088 14,784 12,584
Number of days 29 32 29 30 32 30 54 7 29 30 33 30 31
Appx. average kWh used/day
913 963 943 985 952 1,175 1,236 663 324 415 396 492 405
Details of your new charges Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 01/06/23 to 02/05/23 (31 days)
Delivery charges - Cost to deliver your electricity Facilities rel demand 77 kW x $20.97000 $1,614.69 Demand-Winter
Mid peak 58 kW x $2.16000 $125.28
Energy-Winter
Mid peak 5,621 kWh x $0.02079 $116.86 Off peak 12,578 kWh x $0.01951 $245.40 Super off peak -5,615 kWh x $0.01878 -$105.45
Customer charge $186.14 NEM Agg monthly fee $2.70
CCA cost responsibility surcharge PCIA 12,584 kWh x -$0.00335 -$42.16
Nonbypassable charges (NBCs) CTC, NDC, PPPC 19,188 kWh x $0.01807 $346.73 Fixed recovery charge 19,188 kWh x $0.00066 $12.66 Wildfire fund charge 19,188 kWh x $0.00530 $101.70 DWR adjustment 19,188 kWh x -$0.00208 -$39.91
Other charges or credits Generation Municipal Surcharge $17.59
Subtotal of your new charges $2,582.23 Your new charges $2,582.23
Your Delivery charges include:
· $368.85 transmission charges
· $1,743.98 distribution charges
· $53.73 new system generation charge
Your overall energy charges include:
· $23.73 franchise fees
Additional information:
· Service voltage: 208 volts
· Generation Municipal Surcharge
Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 01/06/23 to 02/05/23 (31 days)
Delivery charges - Cost to deliver your electricity Energy-Winter
Mid peak 5,621 kWh x $0.02079 $116.86 Off peak 12,578 kWh x $0.01951 $245.40 Super off peak -5,615 kWh x $0.01878 -$105.45
CCA cost responsibility surcharge
PCIA 12,584 kWh x -$0.00335 -$42.16 Energy Charge Total $214.65
Additional information regarding your Net Consumption/Generation:
· Virtual Net Energy Metering Month
#6
· Your year-to-date energy generation credit as of previous month: $0.00
· Your current month energy generation credit: $0.00
· Your year-to-date energy generation credit: $0.00
· Your year-to-date net energy consumption/generation: $1,688.87
· Your year-to-date energy billed charges: $1,688.87
· Your year-to-date kWh: 66,974 kWh
Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
SUPPLY/GENERATION
CLEAN POWER ALLIANCE
supplies your electricity
Details of your new charges
CLEAN POWER ALLIANCE
Your rate: NEM TOU-GS-2-D Service Account: 8012476761 Billing period: 01/06/23 to 02/05/23 (31 days)
Generation Charges Demand - Mid-Peak - Winter 45 kW @ 5.07 $228.15 100% Green Power - Super OfPk - Winter
-5615 kWh @ 0.04619 -$259.36
100% Green Power - Off-Peak - Winter
12578 kWh @ 0.07364 $926.24
100% Green Power - Mid-Peak - Winter
5621 kWh @ 0.08825 $496.05
Energy Surcharge $3.78
Sub-Total of CPA Generation Charges $1,394.86
Your New Charges $1,394.86
Additional Information
· Your NEM Balance Owed is $0.00.
· Your cumulative kWh relevant period year-to-date: 66974 kWh
Things you should know Rate freeze for CARE, FERA and Medical Baseline customers ends October 1, 2022 The rate freeze for CARE, FERA and Medical Baseline customers, a bill subsidy implemented in May 2020 as a COVID-19 relief effort to keep rates unchanged for customers during the height of the pandemic, will end October 1, 2022. Standard discounted CARE, FERA and Baseline Medical rates will resume at that time. To learn more, visit CleanPowerAlliance.org/AssistanceInfo. If you need help with your bill, CPA customers are eligible for debt forgiveness and rate reduction programs. Learn more at CleanPowerAlliance.org/CPAbillhelp.
Stay up to date with CPA news and events Sign up for our newsletter at CleanPowerAlliance.org to receive CPA news and event information in your inbox. Also, follow us on social media to stay up to date. We're on Facebook, Instagram, LinkedIn, and Twitter.
THOUSAND OAKS, CITY OF / Page 1 of 10
Customer Account 700341481470
2100 E THOUSAND OAKS
BLVD
THOUSAND OAKS, CA
91362-2999
Date bill prepared 03/09/23 Amount due $3,420.95
Due by 03/29/23
For billing and service inquiries 1-866-701-7869 www.sce.com
Your account summary Previous Balance $3,977.09 Payment Received 03/02/23 -$3,977.09 Balance forward $0.00 Your new charges $3,420.95
Total amount you owe by 03/29/23 $3,420.95
Net energy metering monthly billing month #7.
For information concerning your net consumption and generation, please refer to the "Details of your tracked charges" section of the bill.
Summary of your billing detail Service account Service address Billing period Your rate New charges
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
02/06/23 to 03/06/23 TOU-GS-2-D-APS-E
(SCE)
$2,291.02
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
02/06/23 to 03/06/23 NEM TOU-GS-2-D $1,129.93
$3,420.95
P.O. BOX 300
ROSEMEAD, CA 91772-0002
Customer account 700341481470 Please write this number on the memo line of your check. Make your check payable to Southern California Edison.
700341481470 0000489 000000000000342095000342095
Please return the payment stub below with your payment and make your check payable to Southern California Edison.
If you want to pay in person, call 1-800-747-8908 for locations, or you can pay online at www.sce.com.(14-574) Tear here Tear here
STMT 03092023 P1
THOUSAND OAKS, CITY OF
PW MSC FACILITY
2100 E THOUSAND OAKS BLVD
THOUSAND OAKS CA 91362-2999
Amount due by 03/29/23 $3,420.95
THOUSAND OAKS, CITY OF / Page 2 of 10
What are my options for paying my bill?
On-line Pay one-time or recurring on www.sce.com/bill Mail-in Check or Money order
In Person Authorized payment locations 1-800-747-8908 Phone QuickCheck 1-800-950-2356
Debit & credit card * 1-800-254-4123 *Residential customers only
Electronic check processing Your check payment will be processed as a one-time Electronic Fund Transfer (EFT). With EFTs, funds may be withdrawn from your account the day we receive your payment. Your check will not be returned, but will appear on your financial statement.
Rates and applicable rules: Available at www.sce.com or upon request.
Past due bills When is my bill past due? It is past due 20 days after the preparation date, which was 03/09/23.
• Reconnecting service that has been disconnected requires a Service Connection payment (non-residential only).
• Unable to pay: If payment arrangements were not extended to you by SCE pursuant to SCE’s filed tariffs, you may contact the California Public Utilities Commission.
• For safety reasons, if service is disconnected, please ensure any sensitive or potentially hazardous equipment is unplugged on the day of reconnection. For additional home safety tips, visit www.sce.com/safety or call SCE at 1-800-655-4555.
What is the Late Payment Charge (LPC)?
0.6% will be applied to the total unpaid balance if payment is not received by the due date on this bill (except for CARE and state agency accounts).
What is a rotating outage?
Rotating outages are controlled electrical outages used to avoid widespread or uncontrolled blackouts. Your Rotating Outage Group number is located on page 1, upper left, of your SCE bill. Your rotating outage group number may change at any time. For more information, visit www.sce.com/rotating outage.
What is the Power Charge Indifference Adjustment (PCIA)?
The PCIA is a charge to ensure that both SCE customers and those who have left SCE service to purchase electricity from other providers pay for the above market costs for electric generation resources that were procured by SCE on their behalf.
'Above market' refers to the difference between what the utility pays for electric generation and current market prices for the sale of those resources.
Disputed bills If you believe there is an error on your bill or have a question about your service, please call Southern California Edison (SCE) customer support at 1-800-655-4555. If you are not satisfied with SCE’s response, submit a complaint to the California Public Utilities Commission (CPUC) at www.cpuc.ca.gov/ complaints/. The CPUC’s Consumer Affairs Branch (CAB) handles billing and service complaints and can be reached by:
Telephone 1-800-649-7570 (8:30 AM - 4:30 PM, Monday - Friday) Mail CPUC, Consumer Affairs Branch, 505 Van Ness Ave., Room 2003, San Francisco, CA 94102 If you have limitations hearing or speaking, contact the California Relay Service, which is for those needing assistance relaying telephone conversations. Dial 711 or one of the numbers below to be routed to a California Relay Service provider in your preferred mode of communication.
Type of Call English Spanish
TTY/VCO/HCO to Voice 1-800-735-2929 1-800-855-3000
Voice to TTY/VCO/HCO 1-800-735-2922 1-800-855-3000
Speech-to-Speech Relay 1-800-854-7784 1-800-854-7784
To avoid having service turned off while waiting for the outcome of a complaint to the CPUC regarding the accuracy of your bill, contact CAB for assistance. If your case meets the eligibility criteria, CAB will instruct you on how to mail a check or money order to be impounded pending resolution of your case. You must continue to pay your current charges while your complaint is reviewed to keep your service turned on.
Definitions
• Baseline Credit: The baseline credit provides reduced electricity rates on electricity used up to the baseline allocation for the region that you live in.
• CA Climate Credit: Credit from state effort to fight climate change. Applied monthly to eligible businesses and semi-annually to residents.
• Wildfire Fund Charge: Supports the California Wildfire Fund which covers costs associated with catastrophic wildfires, including payment of bonds issued by the California Department of Water Resources (DWR)
• Public Purpose Programs Charge: Funds state-mandated programs for low income discounts, energy efficiency, renewable energy and R&D.
• SCE Generation: For recovering energy procurement and generation costs for that portion of your energy provided by SCE.
Change of mailing address: 700341481470
STREET# STREET NAME APARTMENT #
CITY STATE ZIP CODE
TELEPHONE # E-MAIL ADDRESS
To change your contact information or enroll in SCE's payment option, complete the form below and return it in the enclosed envelope.
Direct Payment (Automatic Debit) Enrollment: 700341481470 I hereby authorize SCE and my financial institution to automatically deduct my monthly payment from the checking account as shown on my enclosed check, ten calendar days after my bill is mailed.
Signature _____________________________________ Date ____________
To change your checking account information or to be removed from the Direct Payment program please call SCE at 1-800-655-4555.
Energy Assistance Fund (EAF): I want to help people pay their energy bill through EAF. For info visit www.sce.com/eaf or call (800) 205-8596.
Add this amount for EAF $ __________________ Select one box only and sign below for EAF:
Every Month
THOUSAND OAKS, CITY OF / Page 3 of 10
Fixed Recovery Charge SCE has been permitted to issue bonds that enable it to recover more quickly certain costs related to preventing and mitigating catastrophic wildfires. Your bill for electric service includes a Fixed Recovery Charge that has been approved by the CPUC to repay those bonds. The right to recover the Fixed Recovery Charge has been transferred to a separate entity (called the Special Purpose Entity) that issued the bonds and does not belong to SCE. SCE is collecting the Fixed Recovery Charge on behalf of the Special Purpose Entity.
DWR Adjustment This is a refund from the California Department of Water Resources (DWR) relating to the purchase of power during the 2000-2001 energy crisis. The adjustment line item will only appear on bills of customers who previously paid the DWR Bond Charge.
03/01/2023 Energy Price Change You may notice a change in your billing statement. Effective 03/01/2023 the billing rates used to calculate your bill have been modified.
For more information please visit www.sce.com/bill_change.
THOUSAND OAKS, CITY OF / Page 4 of 10
Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
DELIVERY
SOUTHERN CALIFORNIA EDISON
delivers your electricity
Your cost varies by time of day Winter cost periods (Oct 01-May 31)
Weekdays Weekends & Holidays Mid peak 4pm - 9pm 4pm - 9pm Off peak 12am - 8am 12am - 8am
9pm - 12am 9pm - 12am Super off peak 8am - 4pm 8am - 4pm
Your past and current electricity usage Your next billing cycle for meter 259000-081080 will end on or about 04/04/23.
Reactive usage is 8,986 kVarh
Electricity (kWh) Demand (kW) Winter Season - Consumption Mid Peak 4,726 58 02/07/23 06:30pm-06:45pm Off peak 11,462 70 02/06/23 06:15am-06:30am Super off peak 203 38 02/24/23 08:00am-08:15am
Winter Season –Allocated Generation Mid Peak -108 Off peak -69 Super off peak -8,376
Total 7,838
Your daily average electricity usage (kWh)
Mar '21** Mar '22 Feb '23 Mar '23
* Irregular billing period ** No data available
Usage comparison Mar '21
Mar '22 Apr '22 May '22 Jun '22 Jul '22 Aug '22
Sep '22
Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23
Total kWh used 30,840 27,365 29,579 30,472 35,266 66,749 4,643 9,413 12,462 13,088 14,784 12,584 7,838
Number of days 32 29 30 32 30 54 7 29 30 33 30 31 29
Appx. average kWh used/day
963 943 985 952 1,175 1,236 663 324 415 396 492 405 270
Details of your new charges Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 02/06/23 to 03/06/23 (29 days)
Delivery charges - Cost to deliver your electricity Facilities rel demand 70 kW x $20.97000 x 23/29 days $1,164.20 Facilities rel demand 70 kW x $20.79000 x 6/29 days $301.10
THOUSAND OAKS, CITY OF / Page 5 of 10
Demand-Winter
Mid peak 58 kW x $2.16000 x 23/29 days $99.36 Mid peak 58 kW x $2.14000 x 6/29 days $25.68
Energy-Winter Mid peak 3,839 kWh x $0.02079 $79.81 Off peak 9,165 kWh x $0.01951 $178.81 Super off peak -6,156 kWh x $0.01878 -$115.61 Mid peak 779 kWh x $0.02062 $16.06 Off peak 2,228 kWh x $0.01936 $43.13 Super off peak -2,017 kWh x $0.01863 -$37.58
Customer charge $147.63 NEM Agg monthly fee $2.70 Customer charge $38.08
CCA cost responsibility surcharge PCIA 6,848 kWh x -$0.00335 -$22.94 PCIA 990 kWh x -$0.00342 -$3.39
Nonbypassable charges (NBCs) CTC, NDC, PPPC 13,289 kWh x $0.01807 $240.13 CTC, NDC, PPPC 3,102 kWh x $0.01801 $55.87 Fixed recovery charge 16,391 kWh x $0.00066 $10.82 Wildfire fund charge 16,391 kWh x $0.00530 $86.87 DWR adjustment 16,391 kWh x -$0.00208 -$34.09
Other charges or credits Generation Municipal Surcharge $14.38
Subtotal of your new charges $2,291.02 Your new charges $2,291.02
Your Delivery charges include:
· $335.53 transmission charges
· $1,561.51 distribution charges
· $33.45 new system generation charge
Your overall energy charges include:
· $21.06 franchise fees
Additional information:
· Service voltage: 208 volts
· Generation Municipal Surcharge
THOUSAND OAKS, CITY OF / Page 6 of 10
Your rate: TOU-GS-2-D-APS-E (SCE) Billing period: 02/06/23 to 03/06/23 (29 days)
Delivery charges - Cost to deliver your electricity Energy-Winter
Mid peak 3,839 kWh x $0.02079 $79.81 Off peak 9,165 kWh x $0.01951 $178.81 Super off peak -6,156 kWh x $0.01878 -$115.61 Mid peak 779 kWh x $0.02062 $16.06 Off peak 2,228 kWh x $0.01936 $43.13 Super off peak -2,017 kWh x $0.01863 -$37.58
CCA cost responsibility surcharge
PCIA 6,848 kWh x -$0.00335 -$22.94 PCIA 990 kWh x -$0.00342 -$3.39
Energy Charge Total $138.29
Additional information regarding your Net Consumption/Generation:
· Virtual Net Energy Metering Month
#7
· Your year-to-date energy generation credit as of previous month: $0.00
· Your current month energy generation credit: $0.00
· Your year-to-date energy generation credit: $0.00
· Your year-to-date net energy consumption/generation: $1,827.16
· Your year-to-date energy billed charges: $1,827.16
· Your year-to-date kWh: 74,812 kWh
THOUSAND OAKS, CITY OF / Page 7 of 10
Service address 1993 RANCHO CONEJO
BLVD UNIT A
THOUSAND OAKS, CA
101760940005495298
Rotating outage Group A038
SUPPLY/GENERATION
CLEAN POWER ALLIANCE
supplies your electricity
Details of your new charges
CLEAN POWER ALLIANCE
Your rate: NEM TOU-GS-2-D Service Account: 8012476761 Billing period: 02/06/23 to 03/06/23 (29 days)
Generation Charges Demand - Mid-Peak - Winter 51 kW @ 5.07 $258.57 100% Green Power - Super OfPk - Winter
-8173 kWh @ 0.04619 -$377.51
100% Green Power - Off-Peak - Winter
11393 kWh @ 0.07364 $838.98
100% Green Power - Mid-Peak - Winter
4618 kWh @ 0.08825 $407.54
Energy Surcharge $2.35
Sub-Total of CPA Generation Charges $1,129.93
Your New Charges $1,129.93
Additional Information
· Your NEM Balance Owed is $0.00.
· Your cumulative kWh relevant period year-to-date: 74812 kWh
Things you should know Time-of-Use rates provide options to save energy and money on your bill Electricity costs on TOU rate plans are based on the time of day and season. Costs are lower during the day when clean, inexpensive solar power is abundant. TOU rates encourage you to use energy when it is cleanest and least expensive. Learn how to save at cleanpoweralliance.org/timematters.
CPA is celebrating the 5th anniversary of service to our customers!
Thank you for being a loyal CPA customer and helping make Southern California greener, healthier, and more sustainable.
Stay up to date with CPA news and events Sign up for our newsletter at CleanPowerAlliance.org to receive CPA news and event information in your inbox. Also, follow us on social media to stay up to date. We're on Facebook, Instagram, LinkedIn, and Twitter.
THOUSAND OAKS, CITY OF / Page 8 of 10
March 2023
Not Seeing Eye-to-Eye With Your Bill?
If you believe the amount you have been billed is incorrect, call our customer service phone number at the top of your bill to request an explanation. We will be happy to look into your concerns.
Be Prepared for Outage Emergencies
If your home or business is located in an area designated as a Tier 2 or Tier 3 high fire risk zone, you may want to consider adding a power station or a portable generator to your emergency preparedness plans. These devices may provide backup power for your personal electronics such as a cell phone, computer, or other important household appliances such as refrigerators, lighting, garage door opener and medical devices which helps you to be more prepared for an outage or other emergency.
Rebates are available for the purchase of qualifying products.
Watch our backup power educational videos, learn more about available solutions and apply for rebates in the SCE Marketplace at sce.com/rebates.
To learn more about the process and method the California Public Utilities Commission used to determine High Fire Threat District maps, visit:
cpuc.ca.gov/industries-and-topics/wildfires/fire -threat-maps-and-fire-safety-rulemaking
Stay Safe Around Electricity: Metallic Balloon Safety
· Keep metallic balloons indoors. They should always be tied to a weight.
· Never release them outside. They can cause electrical outages if they touch wires.
· Never remove the weight. Puncture balloons before disposing of them.
· Stay away and call 911. Do not attempt to retrieve a balloon or kite tangled in wires.
Visit us at sce.com/staysafe for more safety tips. Stay aware. Stay safe.
Support for Customers Affected by a Major Disaster If you or someone you know has been affected by a disaster for which a state of emergency has been declared, please visit sce.com/disastersupport for information about consumer protections, programs and services SCE has available.
Be Aware of Potential Payment Scams
· All SCE customers are advised to be aware of potential payment scams.
· We do not have a disconnection department and an SCE agent will not call you to demand payment over the phone.
· We do not request or accept prepaid cards (like money-pack), cryptocurrency (like Bitcoin) or payment apps (like Cash-App, Zelle or Venmo).
To learn more go to sce.com/scamalert
March 2023 Page 10 of 10
Connect With Us Get energy-saving tips, safety and outage updates, and much more.
Proposition 65 Warnings WARNING: The Safe Drinking Water and Toxic Enforcement Act of 1986, commonly referred to as
Proposition 65, requires the governor to publish a list of chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. It also requires California businesses to warn the public of potential exposures to these chemicals that result from their operations.
Providing safe and reliable service to all of our customers is a top priority for Southern California Edison and we want you to be aware of these chemicals so that you can reduce exposure to chemicals associated with electricity generation and distribution. We handle all equipment and materials at our sites carefully for your good health as well as ours. However, if you are at or near our facilities and work sites, you can be exposed to the following chemicals on the state’s Proposition 65 list. Reduce, limit, or avoid activities at and near the sources of exposure described below. For more information go to:
www.P65Warnings.ca.gov
1. Diesel Generation: Diesel Exhaust: SCE uses diesel-fueled emergency generators during emergencies and other times to help minimize the interruption of our customers’ supply of electricity. The generators are used at some SCE facilities like substations and service centers, and at locations where repairs are made to the electrical system. SCE also uses diesel as the primary fuel for electricity generation on Catalina Island and in many service vehicles used throughout our service territory. Diesel engines produce exhaust as a by-product of the combustion of diesel fuel. Breathing diesel engine exhaust exposes you to chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. You should avoid breathing diesel fumes whenever possible.
2. Wooden Utility Poles: SCE uses wooden poles that have been treated with chemical preservatives.
These chemicals include pentachlorophenol, which is known to the State of California to cause cancer, and petroleum products such as diesel fuel, which contains chemicals including toluene and benzene that are known to the State of California to cause cancer and birth defects or other reproductive harm. If you come into contact with a wooden utility pole or the dust, debris, soil surrounding the pole, or water runoff that may contain dust, debris, and soil previously in contact with the pole, you could be exposed to these chemicals. Avoid contact with wooden utility poles and the dust, debris, soil surrounding the poles, or water runoff that may contain dust, debris, soil surrounding the poles, or water runoff that may contain dust, debris, and soil previously in contact with the poles.
3. Painted Structures: SCE utilizes metal and wood structures and equipment that may have been coated with paints containing chemicals, such as lead-based paint, that are known to the State of California to cause cancer and birth defects or other reproductive harm. When the paint on these on these structures deteriorates, flakes of paint can impact the soil adjacent to the structure. To avoid exposure, you should avoid contact with any paint flakes or soil near any structure with deteriorating paint.
Los usarios con acceso al Internet podran leer y descargar esta notificacion en espanol en el sitio Web de SCE:
www.sce.com/avisos www.facebook.com/sce www.instagram.com/sce www.twitter.com/sce_business
Customer Account 700341481470
2100 E THOUSAND OAKS
BLVD
THOUSAND OAKS, CA
91362-2999
Date bill prepared 04/10/23 Amount due $2,981.50
Due by 05/01/23
For billing and service inquiries 1-866-701-7869 www.sce.com
Your account summary Previous Balance $3,420.95 Payment Received 03/22/23 -$3,420.95 Balance forward $0.00 Your new charges $2,981.50
Total amount you owe by 05/01/23 $2,981.50
Net energy metering monthly billing month #8.
For information concerning your net consumption and generation, please refer to the "Details of your tracked charges" section of the bill.
Summary of your billing detail Service account Service address Billing period Your rate New charges
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
03/07/23 to 04/04/23 TOU-GS-2-D-APS-E
(SCE)
$2,160.67
8012476761 1993 RANCHO CONEJO BLVD
UNIT A
THOUSAND OAKS, CA
03/07/23 to 04/04/23 NEM TOU-GS-2-D $820.83
$2,981.50
P.O. BOX 300
ROSEMEAD, CA 91772-0002
Customer account 700341481470 Please write this number on the memo line of your check. Make your check payable to Southern California Edison.
700341481470 0000482 000000000000298150000298150
Please return the payment stub below with your payment and make your check payable to Southern California Edison.
If you want to pay in person, call 1-800-747-8908 for locations, or you can pay online at www.sce.com.(14-574) Tear here Tear here
STMT 04102023 P1
THOUSAND OAKS, CITY OF
PW MSC FACILITY
2100 E THOUSAND OAKS BLVD
THOUSAND OAKS CA 91362-2999
Amount due by 05/01/23 $2,981.50
What are my options for paying my bill?
On-line Pay one-time or recurring on www.sce.com/bill Mail-in Check or Money order
In Person Authorized payment locations 1-800-747-8908 Phone QuickCheck 1-800-950-2356
Debit & credit card * 1-800-254-4123 *Residential customers only
Electronic check processing Your check payment will be processed as a one-time Electronic Fund Transfer (EFT). With EFTs, funds may be withdrawn from your account the day we receive your payment. Your check will not be returned, but will appear on your financial statement.
Rates and applicable rules: Available at www.sce.com or upon request.
Past due bills When is my bill past due? It is past due 20 days after the preparation date, which was 04/10/23.
• Reconnecting service that has been disconnected requires a Service Connection payment (non-residential only).
• Unable to pay: If payment arrangements were not extended to you by SCE pursuant to SCE’s filed tariffs, you may contact the California Public Utilities Commission.
• For safety reasons, if service is disconnected, please ensure any sensitive or potentially hazardous equipment is unplugged on the day of reconnection. For additional home safety tips, visit www.sce.com/safety or call SCE at 1-800-655-4555.
What is the Late Payment Charge (LPC)?
0.6% will be applied to the total unpaid balance if payment is not received by the due date on this bill (except for CARE and state agency accounts).
What is a rotating outage?
Rotating outages are controlled electrical outages used to avoid widespread or uncontrolled blackouts. Your Rotating Outage Group number is located on page 1, upper left, of your SCE bill. Your rotating outage group number may change at any time. For more information, visit www.sce.com/rotating outage.
What is the Power Charge Indifference Adjustment (PCIA)?
The PCIA is a charge to ensure that both SCE customers and those who have left SCE service to purchase electricity from other providers pay for the above market costs for electric generation resources that were procured by SCE on their behalf.
'Above market' refers to the difference between what the utility pays for electric generation and current market prices for the sale of those resources.
Disputed bills If you believe there is an error on your bill or have a question about your service, please call Southern…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .