Attachment6 - ShepsHightlifterCoversionTopo.pdf
PDF 1 MB Posted
- Solicitation number
- 1240LU26Q0107
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a map depicting the Sheps Solar Pump Conversion project located within the Townsend Ranger District as of May 2026. The map illustrates a water conveyance system consisting of a Headbox, a Highlifter Pump/Solar location, two storage tanks (Tank 1 and Tank 2), and associated infrastructure. The system includes fenced exclosures and pipelines connecting the various components, with the pipeline network extending approximately 0.1 miles across the mapped area based on the scale provided. The conversion referenced in the title indicates a transition from traditional pump operation to solar-powered pumping capability.
The map serves as a visual reference for the physical layout and geographic distribution of the Sheps Highlifter Water System components. The contour lines indicate mountainous terrain in the ranger district, with the infrastructure positioned strategically across the landscape. This documentation appears to support project planning, implementation, or operational management for the water system conversion initiative within U.S. Forest Service lands managed by the Townsend Ranger District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headbox
Highlifter Pump/Solar location
Storage Tank
Tank 1
Tank 2 Copyright:© 2013 National Geographic Society, i-cubed
Townsend Ranger District Sheps Solar Pump Conversion
May 2026
Legend # Sheps Highlifter Water System
Sheps Highlifter Water System fences and pipelines
TYPE
EXCLOSURE
PIPELINE
0.1 0 0.10.05 Miles
File details come from the government source that posted it. Updated .