About this file

This is a solicitation for a performance-based services contract to provide housing change of occupancy maintenance at U.S. Naval Air Facility Atsugi, Japan and surrounding areas. The contractor will provide all labor, management, tools, materials and equipment to complete recurring and non-recurring maintenance work items at family housing units. Typical recurring work includes cleaning. Non-recurring work involves tasks like replacing doors, windows, flooring, fixtures and appliances, as well as repairs to walls, ceilings, plumbing and electrical. The base period of performance is seven months with seven one-year option periods. The solicitation is a single-award indefinite delivery/indefinite quantity contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Rec

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
A001HOUSING FUND
A001AACOM, Atsugi, Townhouse, 2-Bedroom Unit
(Occupied Less Than 1 Year)1UN¥0
A001ABCOM, Atsugi, Townhouse, 2-Bedroom Unit
(Occupied 1 Year to 2 Years)2UN¥0
A001ACCOM, Atsugi, Townhouse, 2-Bedroom Unit
(Occupied More Than 2 Years)4UN¥0
A001ADCOM, Atsugi, Townhouse, 3-Bedroom Unit
(Occupied Less Than 1 Year)2UN¥0
A001AECOM, Atsugi, Townhouse, 3-Bedroom Unit
(Occupied 1 Year to 2 Years)4UN¥0
A001AFCOM, Atsugi, Townhouse, 3-Bedroom Unit
(Occupied More Than 2 Years)8UN¥0
A001AGCOM, Atsugi, Townhouse, 4-Bedroom Unit
(Occupied Less Than 1 Year)1UN¥0
A001AHCOM, Atsugi, Townhouse, 4-Bedroom Unit
(Occupied 1 Year to 2 Years)1UN¥0
A001AJCOM, Atsugi, Townhouse, 4-Bedroom Unit
(Occupied More Than 2 Years)2UN¥0
A001AKCOM, Atsugi, High-rise, 2-Bedroom Unit
(Occupied Less Than 1 Year)2UN¥0
A001ALCOM, Atsugi, High-rise, 2-Bedroom Unit
(Occupied 1 Year to 2 Years)2UN¥0
A001AMCOM, Atsugi, High-rise, 2-Bedroom Unit (Occupied More Than 2 Years)5UN¥0
A001ANCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied Less Than 1 Year)3UN¥0
A001APCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied 1 Year to 2 Years)3UN¥0
A001AQCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied More Than 2 Years)7UN
A001ARCOM, Atsugi, High-rise, 4-Bedroom Unit (Occupied Less Than 1 Year)1UN¥0
A001ASCOM, Atsugi, High-rise, 4 Bedroom Unit (Occupied 1 Year to 2 Years)1UN¥0
A001ATCOM, Atsugi, High-rise, 4 Bedroom (Occupied More Than 2 Years)2UN¥0
A001 FH Fund, Sub Total
TOTAL RECURRING WORK PRICE - BASE PERIODTOTAL ¥
NOTES:
(1) Abbreviation : UN = Units
(2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per
command (facility.)

&CUNCLASSIFIED/FOR OFFICIAL USE ONLY&R&9SRN17684588

&CAttachment J-0200000-06 Page&P

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Non

ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A707
Name of Offeror/Contractor:
ELINProduct NameDescription ExtendedEstimated Quantity (Maximum)Unit of IssueUnit Price (¥)Extended (Total) Price (¥)
A700Change of Occpancy Maintenance (COM)
A700AACOM, Atsugi, Townhouse, 2-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.10UN
A700ABCOM, Atsugi, Townhouse, 2-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.20UN
A700ACCOM, Atsugi, Townhouse, 2-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.35UN
A700ADCOM, Atsugi, Townhouse, 3-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.8UN
A700AECOM, Atsugi, Townhouse, 3-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.30UN
A700AFCOM, Atsugi, Townhouse, 3-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.55UN
A700AGCOM, Atsugi, Townhouse, 4-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.3UN
A700AHCOM, Atsugi, Townhouse, 4-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.5UN
A700AJCOM, Atsugi, Townhouse, 4-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.15UN
A700AKCOM, Atsugi, High-rise, 2-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.15UN
A700ALCOM, Atsugi, High-rise, 2-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.35UN
A700AMCOM, Atsugi, High-rise, 2-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.50UN
A700ANCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.10UN
A700APCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.15UN
A700AQCOM, Atsugi, High-rise, 3-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.50UN
A700ARCOM, Atsugi, High-rise, 4-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantity Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.5UN
A700ASCOM, Atsugi, High-rise, 4 Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantity Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.10UN
A700ATCOM, Atsugi, High-rise, 4 Bedroom (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantity Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.5UN
A700AUCOM, Atsugi, SOQ (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700AVCOM, Atsugi, SOQ (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700AWCOM, Atsugi, SOQ (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700AXCOM, Atsugi, Townhouse in SOQ Area, 3-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700AYCOM, Atsugi, Townhouse in SOQ Area, 3-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700AZCOM, Atsugi, Townhouse in SOQ Area, 3-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700BACOM, Atsugi, Townhouse in SOQ Area, 4-Bedroom Unit (Occupied Less Than 1 Year)This ELIN applies to the FH unit in which the last occupant stayed less than 1 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700BBCOM, Atsugi, Townhouse in SOQ Area, 4-Bedroom Unit (Occupied 1 Year to 2 Years)This ELIN applies to the FH unit in which the last occupant stayed 1 year to 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
A700BCCOM, Atsugi, Townhouse in SOQ Area, 4-Bedroom Unit (Occupied More Than 2 Years)This ELIN applies to the FH unit in which the last occupant stayed more than 2 year period. The Contractor shall participate in deficiency inspection and inspect FH unit including all equipments, fixtures and interior conditions, and shall perform the COM work items listed in Attachment J-1401000-05. When the Contractor found the work item need to be adjusted, maintained, repaired and/or replaced, and which is not listed in the COM work item list, or which exceeds specified Quantitly Limitation, the Contractor shall report to the Government immediately. In such case, applicable Non-Recurring work item or another contract will be issued.
The Contractor shall ensure that FH unit is fully functional with all equipments and fixtures, and is in quality conditions and that FH unit is free of dirt, stains, odors, smears, smudges, streaks and foreign matter, and debris.2UN
Sub Total, A700 (A700AA - A700BC):
A701Whole Unit Painting
A701AAWhole Unit Painting, Atsugi, Townhouse, 2-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item. The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.40UN
A701ABWhole Unit Painting, Atsugi, Townhouse, 3-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item. The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.30UN
A701ACWhole Unit Painting, Atsugi, Townhouse, 4-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item. The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.10UN
A701ADWhole Unit Painting, Atsugi, High-rise, 2-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item. The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.50UN
A701AEWhole Unit Painting, Atsugi, High-rise, 3-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item.
The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.40UN
A701AFWhole Unit Painting, Atsugi, High-rise, 4-Bedroom UnitThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item.
The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.20UN
A701AGWhole Unit Painting, Atsugi, SOQThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item.
The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.2UN
A701AHWhole Unit Painting, Atsugi, Townhouse in SOQ, 3-BedroomThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item.
The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.2UN
A701AJWhole Unit Painting, Atsugi, Townhouse in SOQ, 4-BedroomThe Contractor shall prepare and repaint all interior surfaces of FH unit, including concrete, mortar, board, wood, metal, steel and other painted surfaces, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area. Natural finish coating for wood surface is not included in this line item.
The Contractor shall ensure that all interior surfaces of FH unit are smooth, evenly and uniformly.4UN
Sub Total, A701 (A701AA - A701AJ):
A702Architectural work
A702AAPaint Interior surfacesThe Contractor shall prepare and paint interior surfaces, including concrete, mortar, board, wood, metal, steel or other surfaces designated by the Government, with proper materials in proper number of coat(s).
New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be chosen by the Government.80,000SM
A702ABPaint Interior wood natural varnish finish surfacesThe Contractor shall prepare and paint interior wooden natural varnish finish surfaces, including wooden frame, trims, moldings and wooden floor, with proper materials in proper number of coat(s). New paints shall match color and gloss of surrounding area.
New painted surfaces shall be smooth, evenly and uniformly.1,000SM
A702ACPaint Exterior surfacesThe Contractor shall prepare and paint exterior surfaces up to 2.5 meters height from ground (including concrete, mortar, board, wood, metal, steel or other surfaces designated by the Government) or height/location that does not require fall protection specified in EM 385-1-1, with proper materials in proper number of coat(s). This item includes textured pattern and the Contractor shall make textured pattern by spraying base material on exterior concrete or mortar surfaces, including application of sealer.
New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be chosen by the Government.20,000SM
A702ADPaint Exterior surfacesThe Contractor shall prepare and paint exterior surfaces over 2.5 meters height up to 9 meters height from ground (including concrete, mortar, board, wood, metal, steel or other surfaces designated by the Government) or height/location that requires fall protection in accordance with EM 385-1-1, with proper materials in proper number of coat(s). This item includes textured pattern and the Contractor shall make textured pattern by spraying base material on exterior concrete or mortar surfaces, including application of sealer.
New painted surfaces shall be smooth, evenly and uniformly. Painting colors will be chosen by the Government.2,000SM
A702AEPaint house ID numberThe Contractor shall prepare and paint house ID number on building or parking space. Line item shall include background painting if required. The same paint shall be used.100EA
A702AFReplace vinyl floor tile/vinyl simulated wood floor tileThe Contractor shall remove existing vinyl floor tiles/vinyl simulated wood floor tile, prepare surfaces to make smooth and even floor, and provide new vinyl floor tiles/vinyl simulated wood floor tiles. New floor tile shall be same material and color as existing. Line item shall include wax new vinyl floor unless otherwise directed by KO or HSG Officer.1,200SM
A702AGRe-adhesive loose vinyl floor tileThe Contractor shall re-adhesive loose vinyl floor tile.100SM
A702AHReplace vinyl floor sheet (including slip-retardant)The Contractor shall remove existing vinyl floor sheets, prepare surfaces to make smooth and even floor, and provide new vinyl floor sheets or slip-retardant vinyl floor sheets. New vinyl floor sheet shall be same material and color as existing. Line item shall include wax new vinyl floor sheets if necessary.500SM
A702AJSand wooden flooringThe Contractor shall prepare and sand wooden flooring to remove existing paint and make smooth and even floor.500SM
A702AKReplace hardwood flooringThe Contractor shall remove existing hardwood flooring, sub sheeting baord and proof sheet, prepare surfaces to make smooth and even floor, and provide new hardwood flooring, sub sheeting board and proof sheet. Hardwood flooring: tongue and grooved, thickness: up to 15mm. New hardwood flooring system shall match existing if replaced flooring is adjacent to another hardwood floor.300SM
A702ALRepair loose, holes or cracks of hardwood flooringThe Contractor shall repair loose, holes or cracks of hardwood flooring (refasten loose hardwood flooring and/or fill hole, cracks with wooden piece and putty, and sand it to make smooth and even surface)50SM
A702AMInstall or replace floor metal moldingThe Contractor shall provide new floor metal molding or replace floor metal molding with new one. New metal molding shall be same material and color as existing.200LM
A702ANReplace wooden stepThe Contractor shall remove existing and provide new wooden step board with riser board on stairway. New step shall be same material and color as exiting. Stair width: up to 1,500 mm/(EA), Unit: No. of step.20EA
A702APReplace stair non-slip nosingThe Contractor shall remove existing and provide new stair non-slip nosing on edge of step, Stainless steel, brass or aluminum with or without rubber strip. New stair non-slip nosing shall be same material and color as existing.100LM
A702AQReplace floor carpetThe Contractor shall remove existing carpet with underlayer padding, prepare surfaces to make smooth and even floor, and provide new carpet with underlayer padding. New floor carpet shall be same material and color as existing.3,000SM
A702ARReplace wooden baseboardThe Contractor shall remove existing and provide new wooden baseboard, Size: up to 25x200mm.300LM
A702ASReplace wooden quarter round ("TAMABUCHI")The Contractor shall remove existing and provide new wooden quarter round ("TAMABUCHI"), Size: up to 3/4".100LM
A702ATReplace interior/exterior ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tileThe Contractor shall remove existing and provide new interior/exterior ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tiles, and provide new interior/exterior ceramic, terrazzo, melamine resin laminated, quarry or mosaic floor tile, including mortar bed and joint cement. New floor tile shall be same material and color as exiting.400SM
A702AUReplace exterior stair nosing tileThe Contractor shall remove existing and provide new exterior stair nosing tile, including mortar bed and joint cement. New stair nosing tile shall be same material and color as existing.100LM
A702AVReplace wooden floor joistThe Contractor shall remove existing and provide new wooden floor joist, Size: up to 105/2x105mm, @300~455mm, Unit: floor area having damaged floor joist.50SM
A702AWReplace wooden sleeper hold ("Oobiki")The Contractor shall remove existing and provide new wooden sleeper hold ("Oobiki"), Size: up to 120x120mm, including wooden sleeper hold support ("Tsuka") @455~910mm.30LM
A702AXReplace wooden sheathing or water proof sheetingThe Contractor shall remove existing and provide new wooden diagonal sheathing or plywood sheathing or water proof sheathing, Thickness: up to 19mm.100SM
A702AYReplace wall or ceiling boardThe Contractor shall remove existing and provide new gypsum boards, non-asbestos cement boards, plywood or acoustical tile baord on wall or ceiling.30SM
A702AZReplace wall corner cover (Metal or Plastic)The Contractor shall remove existing and provide new wall corner cover, metal or plastic.50LM
A702BAReplace wall covering ("KABEGAMI" or "VINYL CLOTH")The Contractor shall remove existing wall covering, prepare surfaces and provide new wall covering ("KABEGAMI" or "VINYL CLOTH"). New wall covering shall be same material and color as existing.150SM
A702BBReplace wood batten strip ("OSHIBUCHI")The Contractor shall remove existing and provide new wood batten strip ("OSHIBUCHI") on wall or ceiling100LM
A702BCReplace ceramic wall tileThe Contractor shall remove existing and provide new ceramic wall tiles with mortar bed and joint cement. New wall tile shall be same material and color as existing.400SM
A702BDReplace plasterThe Contractor shall remove existing plaster, prepare surfaces and provide new plaster on wall or ceiling500SM
A702BEReplace wooden wall studThe Contractor shall remove existing and provide new wooden wall stud, Size: up to 105/2x105mm, @300~455mm, Unit: wall area having damaged wall stud50SM
A702BFReplace wooden frame for wall or ceiling boardThe Contractor shall remove existing and provide new wooden frame for wall or ceiling boards, Unit: Damaged wall or ceiling area.50SM
A702BGReplace batten strip or molding on wall or ceilingThe Contractor shall remove existing and provide new batten strip or molding on wall or ceiling.100LM
A702BHReplace wooden doorThe Contractor shall remove existing and provide new swinging or sliding wooden flush door (plywood facing or printed plywood facing) with/without glass and/or louver, including hardware. New door shall be same material and color as existing.
Door size: up to 2.0m²/(EA)20EA
A702BJReplace aluminum doorThe Contractor shall remove existing and provide new swinging aluminum flush door with/without glass, built-in screen window and/or louver, including hardware, aluminum door frame, wooden trims and restoration of wall and floor around door. New door shall be same material and color as existing.
Door size: up to 2.0m²/(EA)50EA
A702BKReplace aluminum screen doorThe Contractor shall remove exiting and provide new aluminum framed screen door with insect screen mesh and hardware. New screen door shall be same material and color as existing.
Screen door size: up to 2.0m²/(EA)30EA
A702BLReplace aluminum windowThe Contractor shall remove existing and provide new sliding, double hung or fixed type aluminum window with hardware, glass, aluminum window frame, wooden trims and restoration of wall and floor around window, New window shall be same material and color as existing. Window size: up to 2.0m²/(EA)30EA
A702BMReplace aluminum screen windowThe Contractor shall remove exiting and provide new aluminum framed screen window with insect screen mesh and hardware. New screen window shall be same material and color as exiting. Screen window size: up to 2.0m²/(EA)50EA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .