This document outlines the instructions for accessing the project area associated with the BCLH Stewardship IRSC Phase 1 federal contract opportunity. The key details are:

The project area is located 2-12 miles east of Detroit, OR within the Beachie Creek Fire and Lionshead Fire burn scars. Contractors must obtain a road use permit and risk assessment from the Forest Service to access the project area. This process requires providing 2 days' notice and completing the required paperwork. The permit will be valid for the solicitation period and allow access to the entire project area. The contract opportunity has a tentative completion date of October 15, 2027 for mandatory work and October 15, 2028 for optional work. The work includes mitigation of fire-damaged trees, fuels reduction, road reconstruction, and road maintenance over approximately 533 mandatory acres and 208 optional acres. Contractors are encouraged to attend the pre-solicitation site visit on October 4, 2024 to view the project area.

View the file

Other files for this federal contract opportunity

Other files attached to BCLH Stewardship IRSC Phase 1, newest first.
File Type Posted
SiteVisitNotes_110424.pdf PDF
DRAFT_Phase1_Appendix B_103024.docx DOCX document
DRAFT_Phase1_Appendix A_103024.docx DOCX document
DRAFT_Phase 1_AppendixC_102924.pdf PDF
DRAFT Phase1 Burn Severity Map_102924.pdf PDF
DRAFT_ConstructionTypicals_102924.pdf PDF
DRAFT Burn Severity Table_102924.xlsx XLSX spreadsheet
DRAFT_BCLH_Phase 1 CAM_101924.pdf PDF
DRAFT_Phase1_Construction_FSSS_102924.pdf PDF
DRAFT Slope Table_102924.xlsx XLSX spreadsheet
Excerpt_DRAFT_RFP_Phase1_102924.pdf PDF
Attachment1_VICINITY MAPS.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Area Access for BCLH IRSC solicitation

For contractors seeking to view treatment units within the BCLH IRSC project area, access approval must be granted by the Ranger District. This document outlines the process for obtaining a road use permit to access areas within the Forest Closure area.

Step 1: Provide at least two working days’ notice to Heidi Andersen (heidi.andersen@usda.gov), Brett Blundon (brett.blundon@usda.gov), and Darrin Neff (Darrin.neff@usda.gov) via email. Given the holiday season, it is prudent to email all three of these contacts to ensure that someone will be available to process this request.

Step 2: A road use permit and risk assessment will be sent to the requestor. The road use permit needs to be filled out and signed electronically. The risk assessment needs to be read and signed by all personnel that will be entering the closure area. These completed documents need to be returned to the Forest Service contact via email.

Step 3: The Ranger or their acting will sign the road permit and the risk assessment and email back to the contractor along with gate codes. This permit will be valid for the duration of the solicitation period and will grant access to the entire project area. The contractor will be required to carry this permit with them at all times while accessing the closure areas. Marion County Sheriff’s department does patrol these areas and the permit will be needed to avoid a citation.