This document is a pre-solicitation notice for the BCLH Stewardship IRSC Phase 1 federal contract opportunity. The project, located approximately 2 to 12 miles east of Detroit, Oregon, aims to reduce the risks of hazardous fuels along important access routes within the 2020 fire-affected road system. Key work activities include cutting and removing fire-killed trees within 100 feet of roads, performing small fuels treatment, road reconstruction, pre-haul/during-haul/post-haul road maintenance, and delivering non-commercial fish logs. The work is broken out as Mandatory and Optional, with the Government's construction estimate ranging from $5,000,000 to $10,000,000 for Mandatory and $500,000 to $1,000,000 for Optional. A pre-solicitation site visit is scheduled for October 4, 2024, and the final Request for Proposals is anticipated to be issued on or around January 15, 2025, with an award planned for approximately March 21, 2025. The contract will be awarded using a best value source selection method, and bonding will be required for the construction portion.

View the file

Other files for this federal contract opportunity

Other files attached to BCLH Stewardship IRSC Phase 1, newest first.
File Type Posted
SiteVisitNotes_110424.pdf PDF
DRAFT_Phase1_Appendix A_103024.docx DOCX document
DRAFT_Phase1_Appendix B_103024.docx DOCX document
DRAFT Slope Table_102924.xlsx XLSX spreadsheet
Excerpt_DRAFT_RFP_Phase1_102924.pdf PDF
DRAFT_ConstructionTypicals_102924.pdf PDF
DRAFT_BCLH_Phase 1 CAM_101924.pdf PDF
DRAFT_Phase1_Construction_FSSS_102924.pdf PDF
DRAFT_Phase 1_AppendixC_102924.pdf PDF
DRAFT Phase1 Burn Severity Map_102924.pdf PDF
Attachment2_ProjectAreaAccessInstructions.docx DOCX document
Attachment1_VICINITY MAPS.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Acres of Burn SeverityACRES BY SEVERITY BY PHASE
PhaseUnitMandatory/ OptionalTotal Acre Within 100' of RoadwayLOW 0-25%Mod 26-50%High 51-100%FS Rte.LOW BA MORTALITY (0-25%) ACRESMODERATE BA MORTALITY (26-50%) ACRESHIGH BA MORTALITY (>50%) ACRES
1LH-11M131.929.730.2724685000PHASE 1 TOTAL188.1171.2741.1
1LH-11AM18.700.218.54685330MANDATORY96.1104.6532.9
1LH-11BM92.12.510.878.84685310OPTIONAL9266.6208.2
1LH-11BAM28.800.728.14685312PHASE 2 TOTAL236.5162.2677.6
1LH-12O81.327.120.134.14688000MANDATORY10172.8269.5
1LH-12AO24.46.53.9144688240OPTIONAL135.589.4408.1
1LH-12BO0.80.20.30.34688133PHASE 3 TOTAL107.2176.3742.2
1LH-56M17.9755.92231000MANDATORY26.5106.8511.1
1LH-56AM24.512.51.210.82231701OPTIONAL80.869.5231.1
1LH-56BO14.96.74.14.12231721
1LH-56CO44.84.4436.42231730
1LH-56DO79.77.26.765.84693000
1LH-56EO28.76.1616.64693640
1LH-57M47.65.98.133.62231000
1LH-57AO11.24.72.24.32231847
1LH-58M151.17.212.2131.72231870
1LH-58AO1.6001.62231900
1LH-58BO20022231878
1LH-58CO1.6001.62231873
1LH-59M745.67.960.52231850
1LH-59AO0.6000.62231844
1LH-60M32.46.14.421.92231840
1LH-60AO5.1005.12231846
1LH-61M7.12.31.23.62231810
1LH-62M5916.220.622.22231810
1LH-65O7.43.30.33.82231518
1LH-67M48.51.12.145.32231000
1LH-9O58.82518.115.74600033
1LH-9AO3.90.80.92.24600030
TOTAL PHASE 11100.4188.1171.2741.1
Acres of Burn Severity
PhaseUnitMandatory/ OptionalTotal AcreLOW 0-25%Mod 26-50%High 51-100%FS Rte.
2BC-8M15.911.14.40.42212000
2LH-1M48.62.54.741.42200020
2LH-13O37.58.710.318.52233628
2LH-14M82.412.212.557.72233620
2LH-14AO33.40.80.132.52233624
2LH-15M72.818.61836.22233000
2LH-15AO29.112.37.69.22233609
2LH-15BO3.701.52.22233607
2LH-15CO29.43.13.922.42233505
2LH-15CAO7.3007.32233506
2LH-15DO25.600.325.32233601
2LH-15EO1.40.40.30.72233611
2LH-15FO1.70.90.70.12233600
2LH-3AO74.41.74.967.82243440
2LH-3BO9.63.53.72.42243302
2LH-3CO200.21.82243100
2LH-4O29.124.13.61.42200040
2LH-4AO11.36.91.23.22200045
2LH-50O1883.26.82234000
2LH-51M61.612.14.644.92234100
2LH-51AM1.91.40.20.32236000
2LH-52O33.314.29.39.82234205
2LH-52AO3.33.3002234000
2LH-52BO0.50.5002234205
2LH-52CO0.40.4002234207
2LH-53O15.40.60.714.12234000
2LH-54M61.513.87.140.61003000
2LH-54AO8.54.32.61.61011000
2LH-54BO6.30.31.54.51003420
2LH-54CO16.50.63.712.21003308
2LH-54DO9.97.11.90.91003416
2LH-55O75.94.59.4622242805
2LH-55AO55.217.910.826.52242000
2LH-55BO29.10029.12242806
2LH-55CO18.30.9314.42242810
2LH-55DO15.800.115.72242840
2LH-6O0.70.20.30.22200023
2LH-63M19.47.57.74.22233000
2LH-64M9.83.54.41.92233000
2LH-64AO52.70.51.82233630
2LH-64BM3.10.41.11.62233515
2LH-66M54.910.6539.32233000
2LH-66AO12.600.212.42233651
2LH-72O7.54.62.30.62234000
2LH-74O5.331.60.72200420
2LH-75M11.47.33.111000000
TOTAL PHASE 21076.3236.5162.2677.6
Acres of Burn Severity
PhaseUnitMandatory/ OptionalTotal AcreLOW 0-25%Mod 26-50%High 51-100%FS Rte.
3BC-1DO33.29.34.619.32223520
3BC-2M145.49.622.3113.52225000
3BC-2AO19.30.81.816.72225450
3BC-2BO33.63.86.223.62225458
3BC-2BBO5.3005.32225461
3BC-3M278.212.554.3211.42207000
3BC-4M75.93.912602209000
3BC-5M144.90.518.2126.22209201
3BC-6O3.7003.72207214
3BC-7O2.201.212207215
3LH-10O47.822.715.39.84696701
3LH-7O94.37.610.875.94695000
3LH-7AO64.610.311.442.94695130
3LH-7AAO5.43.10.91.44695134
3LH-7ABO16.66.12.97.64695132
3LH-7BO42.212.612.517.14695120
3LH-7CO13.24.51.96.84695110
TOTAL PHASE 31025.8107.3176.3742.2