This is a pricing template for Fairy Lake Road Phase 2, a construction project involving road improvements, trailhead amenities, and trail restoration work.
The project is organized into four primary work categories: Main Road and Trailhead Items, Fairy and Cache Creek Area of Potential Effect (AOP) Items, Trail Items, and a Trail Alternative A featuring Bound Surface Treatment (BST) surfacing additive. Main Road and Trailhead work includes mobilization, soil erosion control, clearing and grubbing, roadway excavation and embankment (13,065 cubic yards in main sections plus 1,636 cubic yards for trailhead areas), subbase and surfacing course aggregates, culvert installation (18-inch, 24-inch, and 36-inch corrugated steel pipes totaling 430 linear feet), guardrail systems (6,300 linear feet of G3 box beam weathering steel with six terminal ends), and recreational fixtures (picnic tables, vault toilets, bear boxes, fire rings, bulletin boards, and well drilling for water supply). The Fairy and Cache Creek AOP Items address stream restoration with culvert removal and replacement, imported riprap (Classes 4 and 5), grade control structures, and equipment rental. Trail work encompasses 200 linear feet of new Trail Class 1 construction, restoration of existing trails spanning five classes (200 to 2,413 linear feet per class), trail turnouts, rock retaining walls, and stairway maintenance. Trail Alternative A provides options for BST surfacing on select trail segments. All items require unit pricing to the nearest cent, with contractors providing their company name, contact information, and SAM registration UEI number on the form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_Amendment0001.pdf | ||
| Amend1_FillableScheduleofItems_Attachment2.xlsx | XLSX spreadsheet | |
| QuestionsAnswers_4-09-26.pdf | ||
| Attachment5_Plans.pdf | ||
| Attachment1 _SolicitationTermsConditions.pdf | ||
| Attachment4_Specifications_FSSS.pdf | ||
| Attachment 6 DavisBaconWageDetermination.pdf | ||
| Attachment7_AreaMap_FairyLakeRd.png | PNG image | |
| Attachment3_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fairy Lake Road Phase 2 - Road and Trailhead Items
Item Number Description Unit Estimated Quantity Unit Price Total Notes
1240LU26
Q0012
15101-0000 MOBILIZATION LS 1 -$
15701-0000 SOIL EROSION CONTROL LS 1 -$
20102-0000 CLEARING AND GRUBBING, DISPOSAL METHOD (c) LS 1 -$
20401-0000 ROADWAY EXCAVATION & EMBANKMENT, COMPACTION FSSS 204.11(d), TOLERANCE CLASS C CUBIC YARD 13065 -$ Section 1 7950 CY, Section 2 - 2485 CY, Section 3 - 2630 CY
20401-0001 ROADWAY EXCAVATION & EMBANKMENT, COMPACTION FSSS 204.11(d), TOLERANCE CLASS C, TRAILHEAD AREAS CUBIC YARD 1636 -$ Fairy lake TH - 1016 CY, Winter TH - 600 CY, Shafthouse - 20 CY
20401-0002 ROADWAY EXCAVATION & EMBANKMENT, COMPACTION FSSS 204.11(d), TOLERANCE CLASS C, CAMPGROUND SPUR
IMPROVEMENTS
EA 2 -$
20401-0003 ROADWAY EXCAVATION & EMBANKMENT, ROADWAY TURNOUT, COMPACTION FSSS 204.11(d), TOLERANCE CLASS C
EA 15 -$
20470-0000 BOULDER, PLACE AS STAKED, ACTUAL QUANTITY EA 200 -$ Fairy TH -140, Winter - 13, Shafthouse - 31, misc. 16
20701-1000 GEOTEXTILE, TYPE 1, WOVEN, ACTUAL QUANTITY SQYD 2000 -$
30105-1000 SUBBASE COURSE AGGREGATE, GRADING A, COMPACTION FSSS 204.11(d), COMMERCIAL SOURCE CUBIC YARD 7848 -$ See sheet 2 for breakdown
30110-0000 SURFACING COURSE AGGREGATE, GRADING G, COMPACTION FSSS 204.11(d), COMMERCIAL SOURCE CUBIC YARD 5026 -$ See sheet 2 for breakdown
30301-6000 ROADWAY RECONDITIONING, COMPACTION 204.11(d) MILE 3.6 -$ Includes CG road and loop
31101-3000 STABILIZED AGGREGATE SURFACE COURSE, CALCIUM CHLORIDE, IN PLACE AGGREGATE MILE 6.5 -$ Includes CG road and loop
60201-600 18 INCH PIPE CULVERT, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD 204.11(a)1 LF 300 -$
60202 18 INCH PIPE CULVERT EXTENSION, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD 204.11(a)1 LF 62 -$
60203 24 INCH PIPE CULVERT EXTENSION, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD 204.11(a)1 LF 56 -$
60204 36 INCH PIPE CULVERT EXTENSION, CORRUGATED STEEL, 14 GAGE, COMPACTION METHOD 204.11(a)1 LF 12 -$
60502-0000 SHOULDER UNDERDRAIN SYSTEM, ACTUAL QUANTITY LF 750 -$
60915-1000 WHEELSTOP, CONCRETE, BLUE EA 2 -$
61701-1150 GUARDRAIL SYSTEM G3, BOX BEAM, WEATHERING STEEL LF 6300 -$
61701-1151 GUARDRAIL SYSTEM G3, TERMINAL ENDS, BOX BEAM, WEATHERING STEEL EA 6 -$
62201-2850 MOTORIZED ROAD GRADER, 12' BLADE MINIMUM HR 16 -$
62201-3150 EXCAVATOR WITH A THUMB, 1 CUBIC YARD CAPACITY, 3' WIDTH BUCKET MINIMUM HR 16 -$
63302-1000 PERMANENT TRAFFIC CONTROL, INSTALL GOVERNMENT-FURNISHED TRAFFIC SIGNS, CONTRACTOR PROVIDE AND
INSTALL POSTS
EA 8 -$
63301-0000 PERMANENT TRAFFIC CONTROL, HANDICAP PARKING - TRAFFIC SIGN EA 2 -$
64603-0700 FIXTURE, PICNIC TABLE EA 4 -$
64603-1000 FIXTURE, VAULT TOILET, SINGLE EA 1 -$
64603-1001 FIXTURE, VAULT TOILET, DOUBLE EA 1 -$
64603-1002 FIXTURE, 1000 GALLON VAULT WITH RISER(S) EA 1 -$
64603-1100 FIXTURE, PICNIC PAD EA 3 -$
64603-1400 FIXTURE, BEAR BOX, INSTALLED WITH POLE MOUNTING KIT - BEARSAVER FS24-UP, OR APPROVED EQUAL EA 13 -$
64603-1600 FIXTURE, FIRE RING - PILOT ROCK FSW/SL-30 WITH 11 3/8" SIDES, OR APPROVED EQUAL EA 1 -$
64603-1700 WELL DRILLING, 6-INCH CASING WITH SURFACE GROUT SEAL, WELL DEVELOPMENT, AND WELL DISINFECTION (RATE
FOR FIRST 90 FEET)
LF 90 -$
64603-1701 WELL DRILLING, 6 INCH, PER FOOT, AS NEEDED OVER 90 FEET, ACTUAL QUANTITY LF 50 -$
64603-1702 HAND PUMP, INSTALLED, WITH ALL NEEDED ACCESSORIES INCLUDING CONCRETE SLAB, DESCRIBED ON PUMP WELL
DETAIL SHEET
LS 1 -$
646051000 FIXTURE, BULLETIN BOARD EA 2 -$
64620-0800 REMOVE AND RESET VAULT TOILET EA 1 -$
64620-0801 REMOVE AND DISPOSE VAULT TOILET EA 2 -$
64703-4000 TREATED TIMBER BARRIER, ACTUAL QUANTITY LF 1165 -$
Fairy Lake Road Phase 2 - Fairy and Cache Ck AOP Items
Item Number Description Pay Unit Estimated Quantity Unit Price Total
15101-AOP MOBILIZATION LS 1 -$
15701-AOP SOIL EROSION CONTROL LS 1 -$
20102-AOP CLEARING AND GRUBBING, DISPOSAL METHOD F LS 1 -$
20302 REMOVAL AND DISPOSAL OF EXISTING CULVERT EA 2.0 -$
20404 IMPORTED BORROW, COMPACTION FSSS 204.11(d) CY 160.0 -$
20410 SELECT BORROW, STREAMBED MATERIAL CY 27.0 -$
25101-4a IMPORTED CLASS 4 RIP RAP ON UPSTREAM EMBANKMENT CY 20.0 -$
25101-4b IMPORTED CLASS 4 RIP RAP INSIDE CULVERT CY 110.0 -$
25101-5 IMPORTED CLASS 5 RIP RAP, GRADE CONTROL CY 50.0 -$
25210 GRADE CONTROL STRUCTURE, BOULDER WEIRS EA 10.0 -$
60301 14' SPAN X 4'8" RISE MULTI-PLATE OPEN BOTTOM ARCH CULVERT, 10 GAUGE, COMPACTION METHOD 204.11(d) EA 2.0 -$
62201 RENTAL EQUIPMENT, HYDRAULIC EXCAVATOR HR 16.0 -$
Fairy Lake Road Phase 2 - Trail Items
Item Number Description Pay Unit Estimated Quantity Unit Price Total
90701 MOBILIZATION LS 1 -$
91102 CONSTRUCT NEW TRAIL. TRAIL CLASS 1. TYPE ETR-1. HSR-1. LF 200.00 -$
91106-1 EXISTING TRAIL RESTORATION. TRIAL CLASS 1. TYPE ETR-1, HSR-1 LF 1715 -$
91106-2 EXISTING TRAIL RESTORATION TRAIL CLASS 2. TYPE ETR-2. LF 815 -$
91106-3 EXISTING TRAIL RESTORATION TRAIL CLASS 3. TYPE ETR-3. LF 317 -$
91106-4 EXISTING TRAIL RESTORATION TRAIL CLASS 3. TYPE ETR-4. LF 1650 -$
91106-5 EXISTING TRAIL RESTORATION TRAIL CLASS 5. TYPE ETR-5. LF 2413 -$
91115 OBLITERATION LS 1 -$
92101 CULVERT-12" CMPx15LF WITH HEADWALLS EA 1 -$
91601 CONSTRUCT NEW TURNOUT. TRAIL CLASS 5. TYPE ETR-1, TOS-1, 2. LF 25 -$
91602 CONSTRUCT NEW TURNOUT. TRAIL CLASS 3. TYPE ETR-4, TOS-3. LF 10 -$
93501 CONSTRUCT ROCK RETAINING WALL. 4FT HT W/ MORTAR. TRAIL CLASS 5 LF 80 -$
93502 CONSTRUCT ROCK RETAINING WALL. 4FT HT TRAILL CLASS 3. LF 30 -$
93602 STAIRWAY MAINTENANCE LS 1 -$
62202 EQUIPMENT RENTAL HYDRUALIC EXACAVATOR 1/2CY BUCKET HR 16 -$
$ 0.00
$ 0.00
TRAIL Alternative. A- BST SURFACING ADDITIVE
Item Number Description Pay Unit Estimated Quantity Unit Price Total
90701-A MOBILIZATION LS 1 -$
91102-A CONSTRUCT NEW TRAIL. TRAIL CLASS 1. TYPE ETR-1. HSR-1A. LF 200 -$
91106-1A EXISTING TRAIL RESTORATION. TRIAL CLASS 1. TYPE ETR-1, HSR-1A. LF 1715 -$
91601-A CONSTRUCT NEW TURNOUT. TRAIL CLASS 5. TYPE ETR-1. HSR-1A LF 25 -$
62202 EQUIPMENT RENTAL HYDRUALIC EXACAVATOR 1/2CY BUCKET HR 16 -$
$ 0.00 $ 0.00
$ 0.00 Measurements - AQ = Actual Quantity, DQ = Design Quantity, CY = Cubic Yard, LSQ = Lump Sum Quantity, LF = Lineal Feet, SY = Square Yard & EA = Each Notes: Contractors must price all items above and round to the nearest cent.
Name: _______Company Name: ____________________________ E-Mail: _______________________________________ Phone No. ___________________________________ SAM Registered UEI # ___________________________________
Project Total
Trail Total
Fairy and Cache Ck AOP Total
Main Road Total
Trail Total
Project Total
Alternative A TOTAL