Attachment16_HOSP_Mountain_Tower_Space_Allocation_Plan_March_2024.pdf
PDF 22 MB Posted
- Solicitation number
- 140P2124R0035
About this file
This document appears to be the Attachment16_HOSP_Mountain_Tower_Space_Allocation_Plan_March_2024.pdf, which is related to the federal contract opportunity with Solicitation Number 140P2124R0035 for Planning, Design and Fabrication for Hot Springs National Park, issued by the Department of the Interior National Park Service National Office.
The document appears to be a space allocation plan for the Mountain Tower at Hot Springs National Park. It outlines the proposed space allocation and layout for various functions and operations within the tower. Key details include the square footage allocations for different areas such as visitor services, administration, and building support. The plan also includes a floorplan diagram showing the proposed layout of the different spaces within the tower. This document likely provides important contextual information for the overall planning, design, and fabrication requirements of the federal contract opportunity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNUP
'-6
20'-6" 20'-6"
20'-6"
53'-6"
FOYER
'-6
ELEV. 2 ELEV. 1
56 9
191' - 3"
STATE
NATIONAL PARK SERVICE
MIDWEST REGION REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF PROJECT DRAWING NO.
FMSS NO.
OF
SHEET
HOSP001-85725-UPPER OBSERVATION PLAN-6OF8
CONDITION ASSESSMENT
7 9
APRIL 17, 2023
85725
HOT SPRINGS MOUNTAIN TOWER
CONCESSION I.D. NO.
MIDWEST
HOT SPRINGS NATIONAL PARK
HOT SPRINGS MOUNTAIN TOWER
HOSP001
GARLAND ARKANSAS
TRUE
NORTH
PROJECT
NORTH
UPPER OBSERVATION
KEYED NOTES
9 - RECESSED FIRE
EXTINGUISHER CABINET
47 - COIN OPERATED VIEWING
TELESCOPE
52 - FLOOR DRAIN
53 - 48" ROOF OVERHANG
54 - COATED CABLE AND METAL
"L" FRAME GUARDRAIL
SYSTEM OVER 32" STEM
WALL (TOTAL 8'-0" A.F.F)
55 - OVERFLOW WALL SCUPPER
DRAIN
56 - ELEVATOR CONTROL PANEL
57 - EACH EXTERIOR WALL OF
ENTIRE FLOOR (ALL EIGHT
WALLS) HAS HIGH
CLEARSTORY WINDOWS 24"
TALL WITH HEAD AT 12'-10"
ABOVE FINISH FLOOR EACH
WALL HAS THREE EQUAL
WIDTH WINDOWS AND
EXTEND FROM ROOM
CORNER TO ROOM CORNER
110 - GLASS STOREFRONT SYSTEM
4 0 4 8
SCALE OF FEET
3/32" = 1'
0' - 0"
FINISHED SURFACE
ELEVATION, ABOVE BUILDING
MAIN FINISHED FLOOR
Feher, Peter Thomas Attachment 16: HOSP Mountain Tower Space Allocation Plan, March 2024
Feher, Peter Thomas NOTE: The open-air upper observation deck is potentially available for simple outdoor exhibits. This space shall be optional for exhibits, but should be considered while planning and designing the visitor experience at the Mountain Tower.
UP DN
19'-2" 19'-2"
50'-2"
19'-2"19 '-2
'-2
ELEV. 2 ELEV. 1
179' - 5"
48 46
STATE
NATIONAL PARK SERVICE
MIDWEST REGION REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF PROJECT DRAWING NO.
FMSS NO.
OF
SHEET
HOSP001-85725-LOWER OBSERVATION-5OF8
CONDITION ASSESSMENT
6 9
APRIL 17, 2023
85725
HOT SPRINGS MOUNTAIN TOWER
CONCESSION I.D. NO.
MIDWEST
HOT SPRINGS NATIONAL PARK
HOT SPRINGS MOUNTAIN TOWER
HOSP001
GARLAND ARKANSAS
TRUE
NORTH
PROJECT
NORTH
LOWER OBSERVATION/
KEYED NOTES
9 - RECESSED FIRE
EXTINGUISHER CABINET
42 - CEILING MOUNTED FAN
TYPICAL
43 - INTERCOM SPEAKER
44 - INTERCOM CONTROL BOX
45 - 12" VERTICAL SOFFIT DOWN TO
8'-2" ABOVE FINISH FLOOR AT
PERIMETER OF FLOOR
46 - CEILING MOUNTED
MECHANICAL
SPLIT UNITS TYPICAL
47 - COIN OPERATED VIEWING
TELESCOPE
48 - OPEN SQUARE TUBE
GUARDRAIL (42" TALL)
49 - CARPET WRAPPED COLUMN
SHROUD (30" ABOVE FINISH FLOOR)
WITH 7" DIAMETER STEEL
STRUCTURAL COLUMN TO CEILING
(TYPICAL ALL CORNER COLUMNS)
50 - 5'-0" TALL OBSERVING GLASS
CANTED OUT 12" AT CEILING LINE
51 - 4" STEEL CROSS BRACING
ROUND
TUBES
93 - UTILITY CHASE
SECOND FLOOR 4 0 4 8
SCALE OF FEET
3/32" = 1'
0' - 0"
FINISHED SURFACE
ELEVATION, ABOVE BUILDING
MAIN FINISHED FLOOR
The enclosed second-level ovservation deck shall be the primary exhibit space for this project.
UP
D N
8'-6" 1'-8" 47'-7" 1'-8" 7'-8" 5'-0"
1' -8
4'
-2
5' -0
'-1 1"
5' -0
1'
-8
1' -8
4'
-2
3' -1
0"
'-1 1"
'-8
'-6
1' -8
WMN'S BATH MEN'S BATH
OFFICE
ELEC
ROOM
'-5
72'-2"
4'-8" 1'-8" 47'-7" 1'-8" 7'-8" 5'-0"
ELEV. 2 ELEV. 1
LOBBY
3' -1
1"
3'-10"
0' - 0"
35 14
24 9
GIFT SHOP
COVERED
GALLERY
STATE
NATIONAL PARK SERVICE
MIDWEST REGION REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF PROJECT DRAWING NO.
FMSS NO.
OF
SHEET
HOSP001-85725-MAIN FLOOR PLAN-1OF8
CONDITION ASSESSMENT
1 9
APRIL 17, 2023
85725
HOT SPRINGS MOUNTAIN TOWER
CONCESSION I.D. NO.
MIDWEST
HOT SPRINGS NATIONAL PARK
HOT SPRINGS MOUNTAIN TOWER
HOSP001
GARLAND ARKANSAS
TRUE
NORTH
PROJECT
NORTHMAIN FLOOR
KEYED NOTES
1 - 6" STEEL TUBE SUPPORT
COLUMNS, TYPICAL
2 - CEILING MOUNTED RETURN
AIR REGISTER
3 - LAMINATE COUNTER
MOUNTED TO FRONT WALL WITH
TICKET WINDOW
4 0 4 8
SCALE OF FEET
3/32" = 1'
4 - 42" METAL GUARDRAIL
6 - CEILING DROP TO 7'-10"
ABOVE FINISH FLOOR
7 - HAND DRYER
9 - RECESSED FIRE
EXTINGUISHER CABINET
10 - WATER HEATER
11 - 10'-0" TALL CHAIN LINK
FENCE AT EXTERIOR STAIR
12 - CONCRETE WALK
13 - METAL STAIR SYSTEM
14 - SUSPENDED METAL
LANDING
15 - CONCRETE STORAGE
ROOM WITH 5'-0" CEILING
HEIGHT
16 - ELECTRICAL PANEL BOX
17 - CIRCUIT BREAKER BOX
18 - POWER TRANSFER
SWITCH BOX (GENERATOR)
19 - PHONE BOX
23 - CONCRETE RAFT FOOTING
80" BELOW MAIN FINISH
FLOOR
24 - MOP SINK
25 - 4'-0" DIAMETER CLEAR
DOME SKYLIGHT
27 - 6'-0" DIAMETER CLEAR
DOME SKYLIGHT
35 - 42" TALL METAL RAILING
52 - FLOOR DRAIN
88 - CONCRETE TOWER
BUTTRESS, TYPICAL
90 - DRINKING FOUNTAIN
91 - RELAY ELECTRICAL
BOXES
92 - TRANSFORMER BOX
BELOW ELECTRICAL PANELS
110 - GLASS STOREFRONT
SYSTEM
0' - 0"
FINISHED SURFACE
ELEVATION, ABOVE BUILDING
MAIN FINISHED FLOOR
A small area in the lobby will be made avaialble for simple exhibit orientation displays.
C ur re nt C on di ti on s
File details come from the government source that posted it. Updated .