This document appears to be the Attachment16_HOSP_Mountain_Tower_Space_Allocation_Plan_March_2024.pdf, which is related to the federal contract opportunity with Solicitation Number 140P2124R0035 for Planning, Design and Fabrication for Hot Springs National Park, issued by the Department of the Interior National Park Service National Office.

The document appears to be a space allocation plan for the Mountain Tower at Hot Springs National Park. It outlines the proposed space allocation and layout for various functions and operations within the tower. Key details include the square footage allocations for different areas such as visitor services, administration, and building support. The plan also includes a floorplan diagram showing the proposed layout of the different spaces within the tower. This document likely provides important contextual information for the overall planning, design, and fabrication requirements of the federal contract opportunity.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNUP

'-6

20'-6" 20'-6"

20'-6"

53'-6"

FOYER

'-6

ELEV. 2 ELEV. 1

56 9

191' - 3"

STATE

NATIONAL PARK SERVICE

MIDWEST REGION REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT DRAWING NO.

FMSS NO.

OF

SHEET

HOSP001-85725-UPPER OBSERVATION PLAN-6OF8

CONDITION ASSESSMENT

7 9

APRIL 17, 2023

85725

HOT SPRINGS MOUNTAIN TOWER

CONCESSION I.D. NO.

MIDWEST

HOT SPRINGS NATIONAL PARK

HOT SPRINGS MOUNTAIN TOWER

HOSP001

GARLAND ARKANSAS

TRUE

NORTH

PROJECT

NORTH

UPPER OBSERVATION

KEYED NOTES

9 - RECESSED FIRE

EXTINGUISHER CABINET

47 - COIN OPERATED VIEWING

TELESCOPE

52 - FLOOR DRAIN

53 - 48" ROOF OVERHANG

54 - COATED CABLE AND METAL

"L" FRAME GUARDRAIL

SYSTEM OVER 32" STEM

WALL (TOTAL 8'-0" A.F.F)

55 - OVERFLOW WALL SCUPPER

DRAIN

56 - ELEVATOR CONTROL PANEL

57 - EACH EXTERIOR WALL OF

ENTIRE FLOOR (ALL EIGHT

WALLS) HAS HIGH

CLEARSTORY WINDOWS 24"

TALL WITH HEAD AT 12'-10"

ABOVE FINISH FLOOR EACH

WALL HAS THREE EQUAL

WIDTH WINDOWS AND

EXTEND FROM ROOM

CORNER TO ROOM CORNER

110 - GLASS STOREFRONT SYSTEM

4 0 4 8

SCALE OF FEET

3/32" = 1'

0' - 0"

FINISHED SURFACE

ELEVATION, ABOVE BUILDING

MAIN FINISHED FLOOR

Feher, Peter Thomas Attachment 16: HOSP Mountain Tower Space Allocation Plan, March 2024

Feher, Peter Thomas NOTE: The open-air upper observation deck is potentially available for simple outdoor exhibits. This space shall be optional for exhibits, but should be considered while planning and designing the visitor experience at the Mountain Tower.

UP DN

19'-2" 19'-2"

50'-2"

19'-2"19 '-2

'-2

ELEV. 2 ELEV. 1

179' - 5"

48 46

STATE

NATIONAL PARK SERVICE

MIDWEST REGION REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT DRAWING NO.

FMSS NO.

OF

SHEET

HOSP001-85725-LOWER OBSERVATION-5OF8

CONDITION ASSESSMENT

6 9

APRIL 17, 2023

85725

HOT SPRINGS MOUNTAIN TOWER

CONCESSION I.D. NO.

MIDWEST

HOT SPRINGS NATIONAL PARK

HOT SPRINGS MOUNTAIN TOWER

HOSP001

GARLAND ARKANSAS

TRUE

NORTH

PROJECT

NORTH

LOWER OBSERVATION/

KEYED NOTES

9 - RECESSED FIRE

EXTINGUISHER CABINET

42 - CEILING MOUNTED FAN

TYPICAL

43 - INTERCOM SPEAKER

44 - INTERCOM CONTROL BOX

45 - 12" VERTICAL SOFFIT DOWN TO

8'-2" ABOVE FINISH FLOOR AT

PERIMETER OF FLOOR

46 - CEILING MOUNTED

MECHANICAL

SPLIT UNITS TYPICAL

47 - COIN OPERATED VIEWING

TELESCOPE

48 - OPEN SQUARE TUBE

GUARDRAIL (42" TALL)

49 - CARPET WRAPPED COLUMN

SHROUD (30" ABOVE FINISH FLOOR)

WITH 7" DIAMETER STEEL

STRUCTURAL COLUMN TO CEILING

(TYPICAL ALL CORNER COLUMNS)

50 - 5'-0" TALL OBSERVING GLASS

CANTED OUT 12" AT CEILING LINE

51 - 4" STEEL CROSS BRACING

ROUND

TUBES

93 - UTILITY CHASE

SECOND FLOOR 4 0 4 8

SCALE OF FEET

3/32" = 1'

0' - 0"

FINISHED SURFACE

ELEVATION, ABOVE BUILDING

MAIN FINISHED FLOOR

The enclosed second-level ovservation deck shall be the primary exhibit space for this project.

UP

D N

8'-6" 1'-8" 47'-7" 1'-8" 7'-8" 5'-0"

1' -8

4'

-2

5' -0

'-1 1"

5' -0

1'

-8

1' -8

4'

-2

3' -1

0"

'-1 1"

'-8

'-6

1' -8

WMN'S BATH MEN'S BATH

OFFICE

ELEC

ROOM

'-5

72'-2"

4'-8" 1'-8" 47'-7" 1'-8" 7'-8" 5'-0"

ELEV. 2 ELEV. 1

LOBBY

3' -1

1"

3'-10"

0' - 0"

35 14

24 9

GIFT SHOP

COVERED

GALLERY

STATE

NATIONAL PARK SERVICE

MIDWEST REGION REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT DRAWING NO.

FMSS NO.

OF

SHEET

HOSP001-85725-MAIN FLOOR PLAN-1OF8

CONDITION ASSESSMENT

1 9

APRIL 17, 2023

85725

HOT SPRINGS MOUNTAIN TOWER

CONCESSION I.D. NO.

MIDWEST

HOT SPRINGS NATIONAL PARK

HOT SPRINGS MOUNTAIN TOWER

HOSP001

GARLAND ARKANSAS

TRUE

NORTH

PROJECT

NORTHMAIN FLOOR

KEYED NOTES

1 - 6" STEEL TUBE SUPPORT

COLUMNS, TYPICAL

2 - CEILING MOUNTED RETURN

AIR REGISTER

3 - LAMINATE COUNTER

MOUNTED TO FRONT WALL WITH

TICKET WINDOW

4 0 4 8

SCALE OF FEET

3/32" = 1'

4 - 42" METAL GUARDRAIL

6 - CEILING DROP TO 7'-10"

ABOVE FINISH FLOOR

7 - HAND DRYER

9 - RECESSED FIRE

EXTINGUISHER CABINET

10 - WATER HEATER

11 - 10'-0" TALL CHAIN LINK

FENCE AT EXTERIOR STAIR

12 - CONCRETE WALK

13 - METAL STAIR SYSTEM

14 - SUSPENDED METAL

LANDING

15 - CONCRETE STORAGE

ROOM WITH 5'-0" CEILING

HEIGHT

16 - ELECTRICAL PANEL BOX

17 - CIRCUIT BREAKER BOX

18 - POWER TRANSFER

SWITCH BOX (GENERATOR)

19 - PHONE BOX

23 - CONCRETE RAFT FOOTING

80" BELOW MAIN FINISH

FLOOR

24 - MOP SINK

25 - 4'-0" DIAMETER CLEAR

DOME SKYLIGHT

27 - 6'-0" DIAMETER CLEAR

DOME SKYLIGHT

35 - 42" TALL METAL RAILING

52 - FLOOR DRAIN

88 - CONCRETE TOWER

BUTTRESS, TYPICAL

90 - DRINKING FOUNTAIN

91 - RELAY ELECTRICAL

BOXES

92 - TRANSFORMER BOX

BELOW ELECTRICAL PANELS

110 - GLASS STOREFRONT

SYSTEM

0' - 0"

FINISHED SURFACE

ELEVATION, ABOVE BUILDING

MAIN FINISHED FLOOR

A small area in the lobby will be made avaialble for simple exhibit orientation displays.

C ur re nt C on di ti on s

File details come from the government source that posted it. Updated .