Attachment1_Statement of Work.pdf

PDF 263 KB Posted

Attached to
LOLO NATIONAL FOREST Roof & Foundation Repair at Savenac Historic Site
Solicitation number
1240LU26Q0100
Issued by

About this file

This is a Statement of Work (SOW) issued by the US Department of Agriculture (USDA) for historic repairs at the Savenac facility on the Lolo National Forest, Superior Ranger District near Haugan, Montana 59867.

The project encompasses two primary repair scopes: repairing wind storm damage to the administrative building roof, and repairing the rotting foundation and siding of the East Cottage caused by moisture and poor drainage. For the administrative building, work includes removing damaged materials, repairing damaged rafters, replacing sheathing, installing new underlayment, and installing government-furnished metal shingles, with all work matching the historic character of the structure. For the East Cottage, work includes removing and replacing the rotten sill log, removing and repairing the concrete patio as necessary, and repairing and replacing siding to match existing historic quality. The contractor is responsible for all labor, materials, equipment, tools, transportation, and supplies. Prior to beginning work, the contractor must submit seven items for government approval within a 10-day processing period: roof sheathing, roof paper, sill log lumber, concrete mix, wall vapor barrier, construction sequence, and construction schedule, all written in layperson's language. The contract price range is between $25,000 and $100,000, with an estimated start date of July 2026 and a completion deadline of 90 calendar days from notice to proceed, no later than October 1, 2026. The contractor is responsible for waste disposal, site cleanup, equipment security, and staging area coordination. Government-furnished items include roof shingles, aggregate source, and East Cottage siding. On-site potable water, wastewater facilities, and electrical service are available for contractor use, and a pre-bid tour will be scheduled during the bidding period by the Contracting Officer.

View the file

Other files

File Type Posted
SF_30_Amendment0001.pdf PDF
1240LU26Q0100.pdf PDF
Attachment2_Specifications.pdf PDF
Attachment4_DB WageDetermination.pdf PDF
Attachment3_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Historic Savenac Repairs

Contents Project General Information

1.0 Scope of Work

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Cleanup and Disposal

9.0 Security Requirements

Attachments

Project Historic Savenac Repairs

The Historic Savenac on the Lolo National Forest, Superior Ranger District near Haugan, MT 59867.

General Information

1.0 Scope of Work

The intent of this project is to repair damage to the roof of the administrative building caused recent wind storm and repair the rotting foundation of the East Cottage caused by moisture and poor drainage.

Contractor Requirements

2.0 Technical Requirements / Tasks

The work on the administrative building shall include repairing the damaged area shown on the plans. Work shall include but is not limited to removing all damaged material, repairing damaged rafters, repairing and replacing damaged sheathing, installing new underlayment material, and installing Government Furnishing metal shingles. All work shall match the historic character of the building.

The work on the east cottage shall include but is not limited to removing and replacing rotten sill log, removing and repairing concrete patio as necessary to complete sill log replacement, and repairing and replacing siding. Contractor is responsible for the means and methods for achieving this work. Contractor is responsible for replacing incidental material tear-off to match existing historic quality.

The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. All work shall be completed in accordance with the content of this scope of work, specifications, and attached drawings.

The Contractor shall be responsible for verifying all measurements to determine necessary quantities and sizes of materials to be furnished.

3.0 Government Furnished

Roof Shingles, aggregate source and east cottage siding

4.0 Deliverables / Schedule

All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms.

It is the Contractor’s responsibility to submit all items prior to beginning work. The Contractor shall allow 10-days for processing of submittals by the Government. Approvals must be obtained before starting work. Submittals are required for the following:

• Roof sheathing

• Roof paper

• Sill Log lumber

• Concrete mix

• Wall vapor barrier

• Construction Sequence

• Construction Schedule

Price Range – Between $25,000 and $100,000

Pre-bid Tour – Pre bid tour will be scheduled during the biding period and will be scheduled by the CO.

Start Work - It is estimated that work will begin in July 2026.

Period of Performance – Contract to be completed in 90 calendar days from the notice to proceed and no later the October 1st, 2026. Contractor may, upon approval of CO, opt to work over weekends. If contractor would like to exercise this option, provide work schedule, and discuss with CO.

Disturbances – Contractor shall not block or inhibit access to this building or egress through hallways.

Staging Area – The Contractor shall coordinate with the CO on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping.

Potable Water – The contractor may use the water on-site from location approved by the CO.

Wastewater Facilities –Wastewater facilities will be provided on site and designated by the CO.

Electrical – The Contractor may use on-site electrical service.

5.0 Cleanup and Disposal

The Contractor shall be responsible for solid waste disposal. The Contractor shall always keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.

6.0 Security Requirements

Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.

The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

Project
General Information
1.0 Scope of Work
Contractor Requirements
2.0 Technical Requirements / Tasks
3.0 Government Furnished
4.0 Deliverables / Schedule
5.0 Cleanup and Disposal
6.0 Security Requirements