Attachment1-ProposalBreakdown-W912C324R0003-GeneralRepairsB509_20240628.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W912C324R0003
About this file
This document is an attachment providing a cost breakdown for a proposal responding to Solicitation W912C324R0003 for General Repairs to Building 509 at Fort Buchanan, Puerto Rico. The solicitation is a Firm Fixed Price contract issued as a 100% Total Small Business set-aside, with an estimated value between $1,000,000 and $5,000,000. The North American Industry Classification System (NAICS) code is 236200 for Commercial and Institutional Building Construction. The proposal breakdown provides a detailed accounting of material costs, labor, and equipment for the required repairs, with subtotals for overhead, profit, bonds, insurance, and taxes. The solicitation is posted on the Contract Opportunities website at SAM.gov, and all amendments must be signed and submitted with the proposal. Proposals are due by July 31, 2024 at 10:00 AM local time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT 1- PROPOSAL BREAKDOWN | |
| Solicitation Number: | W912C324R0003 |
| Description of Work: | General Repairs BLDG.509 Fort Buchanan, PR 00934 |
| Contractor: |
| WORK DESCRIPTION | MATERIALS | LABOR | EQUIPMENT | ||||||
| QTY | UNIT of Measure | Unit Cost | SUB-TOTAL | Unit Cost | SUB-TOTAL | Unit Cost | SUB-TOTAL | TOTAL | |
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| 0 | 0 | 0 | $ - 0 | ||||||
| SUBTOTAL (1) before overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| OVERHEAD | % | - 0 | |||||||
| SUBTOTAL (2) before Profit | $ - 0 | ||||||||
| Profit | % | - 0 | |||||||
| SUBTOTAL (3) Project cost | $ - 0 | ||||||||
| Bonds | % | - 0 | |||||||
| Insurance | % | - 0 | |||||||
| Municipal Patent and Taxes | % | - 0 | |||||||
| Sales Taxes | % | - 0 | |||||||
| GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .