Attachment1-B308 - SOW OSS Carpet Replacment (1).pdf

PDF 186 KB Posted

Attached to
OSS Bldg. 308 Sustainment Project
Solicitation number
FA309926Q1020
Issued by

About this file

This is a Statement of Work (SOW) for carpet replacement services at Laughlin Air Force Base, Building 308.

The project involves removing and replacing carpet, transition strips, and cove base on the first floor of Building 308, specifically in the 47th OSS offices and conference room. The scope covers 2,840 square feet of commercial-grade Mohawk Group 589 New Basics III carpet installation, approximately 2,080 linear feet of 4-inch black vinyl cove base, and two commercial-grade transition strips. The contractor is responsible for furnishing all materials, labor, tools, equipment, transportation, supervision, and waste disposal at an off-site commercial facility; disposal in government facilities is prohibited. All work must comply with federal, state, local, and Air Force regulations, including OSHA requirements. The contractor must conduct a site visit, verify measurements, obtain necessary permits from the authority having jurisdiction, and provide a detailed installation plan including sequencing and material delivery schedules. The period of performance is 30 business days from issuance of the Notice to Proceed, with the contractor required to notify the government 14 days before project commencement. Quality verification includes walkthroughs, seam integrity inspections, and final inspection with a government representative. The contractor must maintain a safe and clean jobsite, remove all movable furniture prior to work commencement, and repair any property damage caused by contractor operations at no cost to the Government. Project closeout requires submission of warranty documentation, Operations & Maintenance manuals, and as-built drawings within 10 days if DD Form 1354 is required. Payment is made upon completion of work and verification of all required documentation, with no upfront GPC payment required.

View the file

Other files

File Type Posted
FA309926Q1020 Combo Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

BLDG. 308– Carpet Replacement on First Floor

LAUGHLIN AFB, TEXAS

1.0 DESCRIPTION OF SERVICES: The Contractor shall furnish all materials, labor, tools, equipment, transportation, supervision, and all other incidentals required to complete the work described in this Statement of Work (SOW) at Laughlin Air Force Base, Building 308.

The work consists of removing and replacing the carpet, transition strip, and cove base on the first floor within the 47th OSS offices and conference room, utilizing the 589 New Basics III carpet manufactured by Mohawk Group. The Contractor shall also replace all cove base in the rooms identified above. All work shall be performed in accordance with all applicable federal, state, local, and Air Force regulations, including requirements governing installation, safety, disposal, and workmanship. The Contractor shall ensure continuous management oversight throughout contract execution. The Period of Performance for this project shall be

30 business days from issuance of the Notice to Proceed (NTP).

2.0 PROJECT BACKGROUND: The first‑floor area of Building 308 identified for renovation encompasses 2,840 square feet, as shown in the Space Utilization Study floor plan. This section of the facility, occupied by the 47th OSS offices and conference room, has experienced significant wear to its existing carpet, transition strips, and cove base due to sustained operational use and high foot traffic. The Government has procured Mohawk

Group’s 589 New Basics III carpet specifically for this replacement effort, and the project is initiated to install new carpet across the full 2,840‑square‑foot footprint and replace approximately 2,080 linear feet of cove base along the perimeter of the designated rooms.

This work is required to restore interior conditions, maintain a safe and professional environment, and align the facility with current Air Force standards for appearance, durability, and functional support of mission activities.

3.0 DESCRIPTION OF ASSESSMENT AND PLANNING: The Contractor shall:

3.1 Conduct a site visit to assess and verify measurements for all specified rooms in

Building 308.

3.2 Verify the required carpet type, cove base quantities, and transition strip locations to ensure proper installation.

3.3 Obtain necessary permits from the local authority having jurisdiction (AHJ), if required.

3.4 Provide a detailed installation plan including sequencing, material delivery schedule, and management oversight to ensure compliance with all applicable federal, state, local, and Air Force regulations.

4.0 DESCRIPTION OF PRODUCT: All material for the project shall be at the cost of the contractor.

4.1 Supply 2,840 square feet of commercial‑grade 589 New Basics III carpet from

Mohawk Group for the 47th OSS offices and conference room on the first floor of

Building 308.

4.2 Supply approximately 2,080 linear feet of 4‑inch black cove base for the perimeter of the designated rooms.

4.3 Provide two (2) new carpet transition strips for installation at entrances and doorway thresholds.

4.4 Include all necessary adhesive, tack strips, and other ancillary materials as needed for a complete installation.

5.0 DESCRIPTION OF INSTALLATION: The Contractor shall:

5.1 Remove and dispose of all existing carpet, padding, and transition strips in the designated rooms. All waste materials must be transported to and disposed of at a commercial waste management facility located off government property. Disposal in any government or base‑owned facility, including dumpsters, is strictly prohibited.

5.2 The Contractor shall remove all movable furniture prior to commencement of work.

Contractor shall work around any furniture or equipment that cannot be removed.

5.3 Prepare the subfloor, ensuring it is clean, smooth, and ready for installation in accordance with manufacturer’s recommendations and industry best practices.

5.4 Install new 2,840 square feet of Mohawk Group 589 New Basics III carpet in the designated rooms, ensuring proper alignment and secure attachment.

5.5 Install approximately 2,080 linear feet of 4‑inch black vinyl cove base along the perimeter of all designated rooms.

5.6 Install two (2) commercial‑grade transition strips at entrances and doorway thresholds to ensure safe and clean transitions between flooring surfaces.

5.7 Ensure all seams are properly sealed, edges are neatly tucked, and installation meets applicable federal, state, local, and Air Force regulations.

5.8 Remove and properly dispose of all construction debris, including old carpet, padding, cove base, and waste materials, at an off‑site commercial facility.

6.0 DESCRIPTION OF TESTING AND VERFICATION: The Contractor shall:

6.1 Conduct a walkthrough to inspect the final installation of each room as work is completed for quality, including seam integrity, adhesion, and overall appearance.

6.2 Verify that all transitions and baseboards are secure and provide a smooth and safe transfer between floor surfaces.

6.3 Conduct a final inspection with a representative to ensure all work meets the requirements of this SOW.

7.0 SITE-MAINTENANCE: The Contractor shall:

7.1 Work areas shall be maintained in a neat, clean, safe condition and shall, at a minimum, be cleaned with all waste and packing materials removed at the end of each shift.

8.0 PROJECT CLOSEOUT: The Contractor shall:

8.1 The contractor shall submit draft DD Form 1354 if required prior to closing

8.2 The contractor only has 10 days to process the DD Form 1354 if required.

8.3 The contractor shall provide all warranty documentation for government warranty management.

8.3.1 The contractor shall be responsible for any warranty and service calls throughout the manufacturer’s warranty period.

8.3.2 Once warranty and service calls have been requested, the contractor shall follow manufacturer’s warranty terms and conditions, and work with a government representative until issues are resolved.

8.4 The contractor shall provide all Operations & Maintenance manuals or documentation.

8.5 The contractor shall provide all drawings or As-built to the government.

9.0 COMPLIANCEWITH LAWS: The Contractor shall comply and ensure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, and standards.

9.1 Provide licensed and insured electricians to perform all work.

9.2 Ensure compliance with NEC and local codes.

9.3 Obtain and cover costs for permits and inspections.

10.0 PERIOD OF PERFORMANCE: The Contractor shall notify the government 14 days before they start the project. The total number of working days it should take to complete this project should not exceed more than 30 days.

11.0 PLACE OF PERFORMANCE: The installation of all products shall be carried out in building 308. Contractors shall be able to bring all material needed for the project and stage anything they need in a designated area agreed with by the project point of contact (POC).

Repair any damage to the property caused by the contractor at no cost to the Government.

12.0 SAFETY: All construction operations shall be accomplished in accordance with the applicable state statues and U.S. Occupational Safety and Health Administration (OSHA)

Regulations

12.1 JOBSITE: Maintain the jobsite in a safe, neat, and workman like manner at all times. Job safety shall not be compromised.

12.1.1 Any unsafe or unattractive nuisance shall be removed or otherwise taken care of when directed by the government.

12.2 CONTRACTOR IS RESPONSIBLE FOR PROTECTION AND/OR SAFETY

OF THE CONSTRUCTION SITE, SITE PERSONNEL,

SUBCONTRACTORS, MATERIALS AND SAFETY OF THE

CONSTRUCTION.

12.3 OSHA PUBLIC LAW 91:Comply with the OSHA Public Law 91-596, Occupational Safety and Health Act of 1970 and the resulting standards (e.g., 29

CFR 1910, Occupational Safety and Health Standards, 29 CFR 1926, Safety and

Health Regulations for Construction), national consensus standards of the United

States (e.g., National Fire Protection Association and National Electrical Codes), and all applicable federal, state, local, and Department of Defense, environmental, safety, and occupational health statues, policies, and regulations).

12.3.1 It is the contractor’s responsibility to make certain that all safety requirements, equipment, and training are met and provided to their employees.

12.3.2 Additionally, the contractor is responsible to ensure compliance with safety and health standards by all sub-contractor employees.

12.3.3 Air Force Safety, Fire Protection, and Bioenvironmental Engineering officials may periodically enter a contractor’s workplace to verify working conditions of personnel or to make inspections for protection of

Government facilities, personnel, and equipment.

12.3.4 If an improper procedure or unsafe condition exists, the contractor shall notify the applicable Wing Representative/CO and immediately correct the unsafe condition within 24 hours after occurrence. Department of Labor

OSHA inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They are, for the most part, “NO NOTICE” inspections.

13.0 DELIVERABLES/SCHEDULE: Complete all work within 30 days after contract modification has been completed. GPC payment is not required upfront. Payment is made after the work is complete, and all necessary documentation has been submitted and verified.

END OF STATEMENT OF WORK