About this file

This document appears to be an Inspection Report for equipment at the Roudebush VA Medical Center as part of Project 20-147. The report provides a detailed master list of electrical panels, transformers, and other equipment located throughout multiple buildings and floors of the facility, including equipment ID, amperage, type, and brand information.

The related federal contract opportunity is for Triennial Electrical Breaker Testing services at the Roudebush VA Medical Center. The solicitation, Solicitation Number 36C25024Q0966, was issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 10. The contract will require the inspection, testing, and maintenance of electrical breakers and related equipment across the facility. No other details on pricing, set-asides, or award dates are provided in the available information.

View the file

Other files for this federal contract opportunity

Other files attached to H959--Triennial Electrical Breaker Testing, newest first.
File Type Posted
36C25024Q0966 0004.docx DOCX document
Attachment XIII - RFI Questions and Answers FINAL.pdf PDF
36C25024Q0966 0003.docx DOCX document
Attachment XII - 36C25024Q0966 RFI Template.docx DOCX document
Attachment XI - RFI Questions and Answers.docx DOCX document
Attachment X - Single Line Diagrams Updated.pdf PDF
Attachment IX - Arc Flash Survey Diagrams.pdf PDF
Attachment VIII - SOW Revised.docx DOCX document
36C25024Q0966 0002.docx DOCX document
36C25024Q0966 0001.docx DOCX document
36C25024Q0966.docx DOCX document
Attachment I - SCA WD.pdf PDF
Attachment IV - Specs.pdf PDF
Attachment V - Single Line Diagrams.pdf PDF
Attachment III - VHA Directive 1192-01.pdf PDF
Attachment VI - Panel Amperage and Locations.pdf PDF
Attachment II - Limitations on Subcontracting - Certificate of Compliance.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAGLE L sy

SU\"OSH

MECHANICAL'"C

MASTER LIST

920 Tomahawk Trail Suite B Indianapolis, In 46214 • Office: (317) 328-9225 • www.eaglemechanicalinc.net

EAGLE VOSB

~VF

C O N T R A C T O R S

Inspection Report — Equipment (Master) Date: 2021

Facility: Roudebush VA Medical Center Project Name: 20-147 a`

Area: Out Building Inspectors Name: Summit Electrical

Location Equipment ID Amps Type Brand Telecom Room PGLE1

Telecom Room PGHE1

Telecom Room PGHN1

Telecom Room PGLN1

BLDG T6 PANELA

BLDG T6 PANEL B

BLDG 19 PANEL19 DB

BLDG 19 PANEL19 ED1

BLDG 19 PANEL19 GDP

BLDG 19 19EM

BLDG 19 19PPH

BLDG 19 19LE1

BLDG 23 AC PANEL

Chiller Plant BLDG 22 MCC-C MAIN

Chiller Plant BLDG 22 22LN1

Chiller Plant BLDG 22 LP1

Chiller Plant BLDG 22 LP2

Chiller Plant BLDG 22 22HN4

Chiller Plant BLDG 22 22 HOS

Chiller Plant BLDG 22 22 LOS

Chiller Plant BLDG 22 22LE1

Chiller Plant BLDG 22 MCC-B

Chiller Plant BLDG 22 MCC-A

Chiller Plant BLDG 22 MCC-D

SUB-BASEMENT B5BHNDP1

Bldg 5 BSBLNDP1

Bldg 5 B5BLE1

Bldg 5 B5BHE1

Bldg 5 B5BLE2

F f EAGLE :

MECHANICAL' "C

BLDG l

AREA A

920 Tomahawk Trail Suite B Indianapolis, In 46214 • Office: (317) 328-9225 • www.eaglemechanicalinc.net

{ti_';

EAGLE U

CONTRACTORS

a Area: BLDG 1 Area A 1st Floor Inspectors Name: Summit Electrical Brad Austin

A1486 AIHEQDPI

Panel GE A1486 A1LCR1 100 Panel GE A1486 A1LN13 100 Panel GE

A1486 A1HLS1

A1486 A1HCR1

A1486 A1HN1

A1486 A1LN1

A1486 A1HLS1 80

A1486 A1HCR1 80

A1486 A1HN1 100

A1486 A1LN1 90

A1451 A1HN3

A1451 A1LN7

A1451 A1LCR6

A1451 UPSBA2 60 Panel Eaton

A1355 AISMLTI

A1124 A1HN4 100

A1124 AlLN11 90

A1124 AlLN4 90

A1124 Al LCR4 100

A1124 A1LN9 90

A1275 Al LCR2 80

A1275 Al HCR2 60

A1275 A1HLS2 60

A1275 A1HN2 100

A1275 AlLN12 90

A1275 A1LN2

EAGLE

SDV°SB

~ rV , n`o Area: BLDG 1 Area A 2nd Floor Inspectors Name: Summit Electrical Brad Austin

A2003 A2HNMCC1

A2003A A2LN12 100 Panel Challenger A2003A A2HN4 80 Panel GE A2003A A2LN4 80 Panel GE

A2148 A2LNDP1

A2148 A2LCR1

A2148 A2LN1 90 Panel GE A2148 A2LN8 90 Panel GE A2148 A2LLS1 60 Panel GE A2148 A2HLS1 80 Panel GE A2148 A2HCR1 80 Panel GE A2148 A2HN1 80 Panel GE

A2117 A2LCR4

A2117 A2LCR3

A2117 A2HEQDP1

A2117 A2LEQ1

A2117 A2LN7

A2117 A2LN6

A2056 A2LEQ3 200 Panel Eaton A2057 A2LNDP2 400 Panel GE A2057 A2LCR2 100 Panel GE A2057 A2HCR2 60 Panel GE A2057 A2LN3 80 Panel GE A2057 A2LLS2 60 Panel GE A2057 A2HLS2 60 Panel GE A2057 A2LN11 80 Panel GE A2057 A2LN10 80 Panel GE A2057 A2HN2 60 Panel GE A2057 A2LN2 90 Panel GE c EAGLE A9

° Area: A-wing 3rd, 4th and 5th floors Inspectors Name: Summit Electrical

A-3006 UPSBA1

A-3006 A3LEQ1

A-3006 A3HN1

A-3006 A3LN1

A-3006 A3 H E Q1

A-3007 A3HEQDP1

A-3001 A3EMCC1

A-4173 A4LLS1

A-4173 A4LCR1

A-4173 A4HLS1

A-4173 A4HCR1

A-4173 A4H N 1

A-4173 A4LN1

A-4064 A4LN4

A-4064 A4LN5

A-4064 A4LN6

A-4064 A4HCR3

A-4064 A4LLS3

A-4064 A4LCR5

A-4064 A4LCR4

A-4064 A4LCR3

A-4064 A4H N 3

A-4064 A4HLS3

A-4027 A4LIP2

A-4027 A4LIP1

A-4027 A4LEQ1

A-5007 A5HCRDPI

A-5007 A5LEQ1

A-5007 A5 H N 1

A-5007 A5LN1

A-5007 A5LN2

A-5007 A5HEQ1

A-5005 A5HEQ2

A-5005 NO LABLE

A-5005 A5HEMCC2

A-5003 A5LEQ2

A-5 A5LNDP1

s°~oSB

° n`. Area: A-wing 6th floor Inspectors Name: Summit Electrical

A-6173 A6LCRDP1

A-6173 A6HNDP1

A-6173 A6LNDP1

A-6173 A6LN1

A-6173 A6HLS1

A-6173 A6LLS1

A-6030 A6LCR1

A-6030 A6LCR2

A-6030 A6HCR1

A-6030 A6HN1

A-6030 A6LN3

A-6030 A6LN2

A-6145 A6LN4

A-6145 A6LN5

A-6145 A6LCR3

A-6145 A6LCR3A

A-6145 A6LN4A

A-6145 A6HCR2

A-6145 A6 H N 2

A-6075 A6LN6

A-6075 A6LN7

A-6075 A6HN3

A-6075 A6HCR3

A-6075 A6HNDP2

A-6075 A6LCR5

A-6075 A6LCR4

A-6144 A6HEMCCI

A-6144 A6EMCC1

EAGLE t, ° a` Area: Inspectors Name: Summit Electrical

A-7098B A7LN3

A-7142 A7LCR3

A-7142 A7LCR4

A-7142 A7HCR2

A-7142 A7 H N 2

A-7142 A7LN4

A-7142 A7LN5

A-7142 A7LN6

A-7142 A7LCR5

A-7112 A7LCR2

A-7112 A7LCR1

A-7112 A7HCR1

A-7112 A7HN1

A-7112 A7LN1

A-7112 A7LN2

A-8098B A8LLS1

A-8098B 8HLS1

A-8098B A8LCR5

A-8098B A8LN3

A-8086 A8HEQDP1

A-8086 A8EMCC1

A-8139 A8LCR4

A-8139 A8LCR3

A-8139 A8HCR2

A-8139 A8 H N 2

A-8139 A8LN4

A-8139 A8LN5

A-8139 A8LN6

A-8112 A8LCR2

A-8112 A8LCR1

A-8112 A8HCR1

A-8112 A8H N 1

A-8112 A8LN1

A-8112 A8LN2

EAGLE snvose

Inspection Report — Equipment (Master) Date:2021

U Facility: Roudebush VA Medical Center Project Name: 20-147 a`

Area: BLDG 1 Area A Basement Inspectors Name: Summit Electrical Brad Austin

AB140 ABHEQDPI

AB140 ANLNDP3

AB140 ABHNDP1

AB140 ABLEQDP1

A B140 ABHCRDP1

AB140 ABHEQ3 100

AB140 ABLLS3 100

AB140 ABLCRDP1

AB140 ABHLS3

AB147 ABLN5

AB147 ABHN3

AB147 ABLCR2

AB147 ABLEQ3 80

AB147 ABHCR3 80

AB147 ABLN6

AB106 ABLN12

AB106 ABLN13

AB107 ABLN14

AB109 ABLN10

AB109 ABLN11

AB104 ABLN9

AB104 ABLN3

AB104 ABLN3A 225

AB103 ABLNB

AB103 ABHN5

AB153 ABLCR1

AB153 ABLNDP1

AB153 AAUPS 225

AB153 ABLLS1 60

AB153 ABHLS1 80

AB153 ABHCR1 80

AB153 ABHEQL 60

AB153 ABLN1 80

AB153 ABH N 1 80

AB139 ABLLS4 60

AB148 ABHEQ5 400

AB148 ABLEQ5 400

AB031 ABLN16 100

AB031 ABLN7 80

AB090 ABLNDP2 350

AB090 ABHEQ2 125

AB090 ABHLS2 60

AB090 ABLLS2 60

AB090 ABLEQ2 150

AB090 ABHN2 125

AB090 ABLN15 80

AB090 ABLN2 80

MECHANICAL'"C

BLDG 1

B-WING

920 Tomahawk Trail Suite B Indianapolis, In 46214 • Office: (317) 328-9225 • www.eaglemechanicalinc.net

EAGLE E5

° Area: B-wing Inspectors Name: Summit Electrical

Location Equipment ID Amps Type Brand

B-B018 BBHN1

B-B018 BBLN1

B-8018 BBLN2

B-B018 BBLN3

( MECHANICAL' "C

BLDG 1

C-WING

920 Tomahawk WaiI Suite B Indianapolis. In 46214 • Office: (317) 328-9225 • www.eaglemechanicalinc.net

~SDVOSB'-

EAG L E..~r

CONTRACTORS

Inspection Report — Equipment (Master) Date: 2021

U d a Area: C-wing 15t and 2"d floors Inspectors Name: Summit Electrical

C-1101 C1LE6

C-1101 C1LN10

C-1100 C1LN9

C-1156 C1LN13

C-1156 C1LN14

C-1126 C1LN12

C-1126 C1LE7

C-1041 C1LLS1

C-1039 C1LN1

C-1039 C1LE1

C-1039 C1AC1

C-1030 C1LE2

C-1178 C1LN5

C-1178 C1LN4

C-1178 C1LN3

C-1178 C1NDP1

C-1183 C1LE3

C-1183 C1LN2

C-1202A C1LN15

Mech Room roof C2LEMCP1

Mech Room C2LE8

C-2027 C2HE1

C-2027 C2LE2

C-2055 C2HE2

C-2055 C2LN9

C-2055 C2LN8

C-2055 C2LE7

C-2187 C2LE4

C-2169 C2LE3

C-2169 C2LN3

C-2036A C21E1

C-2169 C2AC1

C2036C C2LLS1

C2036C C2LN1

C-2102 C2LE9

E G EsD~ a Area: C-wing 2nd 3rd and 4'h floors Inspectors Name: Summit Electrical

C-2101 C2LN 10

C-2101 C2LN11

C-2161 C2HNMCC1

C-2161 C2LE6

C-2161 C2HNDP1

C-2161 C2LN7

C-2161 C2LN6

C-3045 C3LE2

C-3045 C3 LN 6

C-3056 C3LN1

C-3056 C3LE1

C-3056 C3AC1

C-3157 C3LE3

C-3157 C3LE3A

C-3157 C3 H E 1

C-3145 C3LN2

C-3066 C3LLS1

C-3076 C3LE6

C-3101 C3LN3

NEXT TO ROOM C-

C3LE5

C-4136 C4LE5

C-4136 C4LN6

C-4121 (EIeV.) C4LN2

C-4033 C4LE3

C-4033 C4LE2

C-4033 C4LE4

C-4038 C4H N 1

C-4043 C4LN1

C-4043 C4LE1

C-4043 C4AC1

C-4050 C4LL51

C-4091 C4LN4

C-4091 C4LN3

C-4090 C4LE6

EAGLE z

~~s°r.~

.VF

U a Area: C- wing 5th 6th and 7th floors Inspectors Name: Summit Electrical

C5105 C5LN2

NO ROOM # C5LE6

C5105 CSLE5

C5026 C5LE2

C5058A C5LE1

C5058A C5AC1

C5058A C4LN1

C5058B C5LLS1

C5058B C5LN1

C-6142 C6LE6

C-6142 C6LE5

C-6075 C6LE9

C-6075 C6LE10

C-6075 C6LE11

C-6087 C6LE8

C-6087 C6LE7

C-6019 C6LE2

C-6036 C6HCX

C6AC1 C6LN1

C6AC1 C61E1

C6AC1 C6043

C-6130 C6LE2

C-6130 C6LE4

ELEVATOR LAB C6LN2

C-7059 C7LE4

C-7059 C7LN1

C-7059 C7LE1

C-7059 C7AC1

° Area: C-wing Basement I Inspectors Name: Summit Electrical

C-B188 CBLE3

C-B188 CBLN7

C-B188 CBLNS

C-B159 CBLE2

C-B159 CBLNDP2

C-B159 CBLN5

C-8159 CBLN6

C-B031 CBLN3

C-B003A CBUPS

C-B064 CBLN12

C-B064 CBLN11

C-B065 UPSBC2

C-B065 CBLE5

C-B074 CBLN7

C-B092 CBLN19

C-B069 CBLE6

C-B069 CBLN16

C-B069 CBLE13

C-B021 UPS-BC1

C-B021 CBLLS1

C-B020 CBAC1

C-B020 CBLN1

C-B020 CBLN2

C-B019 CBLEDP2

C-B019 CBLEDP3

C-B019 CBLE1

C-B034 CBLE4

C-B034 CBLN10

C-B034 CBLN9

C-B178 XCUPS1

C-B178 XCUPS2

C-B022A CBLE12

C-B022A APCUPS1

C-B027A CBLE11

EAGLE SD':

C O N T R A C TOR S

Inspection Report — Equipment (Master) Date: 2021

U Facility: Roudebush VA Medical Center Project Name: 20-147

° Area: C-wing basement 2 Inspectors Name: Summit Electrical

C-B021 SNOW MELT

C-B021 UPSDP2

C-B021 UPSBDP2

C-B021 UPSDP1

C-B060 CBLN15

C-B060 CBLN14

C-BNE CBLN21

Gen Room CBLE8

C-WEST CBLEDP4

Switchgear

Room

CBLE9

CBLN22

C-wing Sub basement C5BHN1

CBSHNDP2

C-wing Sub basement CSBLNDPDP2

CSBLNDP3

C-wing Sub basement CBSLE2

CBSLNS

C-wing Sub basement CBSLN6

CSBLN7

C-wing Sub basement Panel IHI

CSBHMCC1

C-wing Sub basement CSBLNDP1

CSBLN3

C-wing Sub basement CSBLN2

CSBLEDP1

C-wing Sub basement CSBHNDP1

CSBH DP1-A

CSBLC1

EAGLE Su~ nSu

MECHANICAL' "C

BLDG 1

D-WING

920 Tomahawk Trail Suite 13 Indianapolis, In 46214 • Office: (517) 328-9225 • www.eaglemechanicalinc.net

E AG L ES° B

a Area: D-wing 5th 6th and 7th floors Inspectors Name: Summit Electrical

D-5019 D5HE1

D-5019 D5LE1

D-5019 D5LN1

D-5019 D5H N 1

D-5005 D5LN2

D-5005 D5LN3

D-6022 D6LE1

D-6022 D6HN2

D-6022 D6H N 1

D-6022 D6LN1

D-7019 D7HE1

D-7019 D7LE1

D-7019 D7LN2

D-7019 D7LN1

D-7019 D7H N 1

D-7002 D7LE2

D-7005 D7LE3

EAGLE 4 DV°SB€

C O N T R A C T O R S a-

Area: D-wing basement 1St 2nd 3rd and 4th floors

Inspectors Name: Summit Electrical

D-B003 DBHEDP1

D-B003 DBLE1

D-B003 DBLN1

D-B003 DBHN1

D-B009 UPS-DB1

D-B009 DBLE2

D-B009 DBHEDP2

D-B009 DNHNDP1

OLD LAWN DRY ROOM DBLN2

D-1009 D1LN2

D-1009 D1LN2

D-1031 D1HE1

D-1031 D1LE1

D-1031 DLE2

D-1031 D1LV1

D-1031 D1HN1

D-2020 D2LE2

D-2020 D2HN2

D-2020 D2LN1

D-2020 D2HN1

D-2012 D2LN3

LAB D2LN4

D-2004 D2LE2

D-3016 D3LN2

D-3005 D3LE1

D-3005 D3LE2

D-3007 D3LN3

D-3025 D3HE1

D-3025 D3LN1

D-3025 D3HN1

D-4017 D4LN1

D-4017 D4HN1

D-4018 D4HE1

D-4018 D4LE1

D-4018 D4LN2

EAGLE SU\OSN

T MECHANICAL Ic

BLDG 1

E-WING

920 Tomahawk Trail Suite B Indianapolis, In 46214 • Office: (317) 328-9225 • www.eaglemechanicalinc.net

EAGLE voSB o-

Area: E-wing basement, 151, 2nd 3rd and 4th floors

Inspectors Name: Summit Electrical

E-B030 EBHN1

E-1001 E1HE1

E-1001 E1LE1

E-1001 EIHNDPI

E-1001 E1LN1

E-1001 E1LND1

E-2002 E2LLS1

E-2002 E2HLS1

E-2002 E2HC1

E-2002 E2HN1

E-2002 E2LC1

E-2002 E2LN2

E-2002 E2LN 1

E-3063 E3LLS1

E-3063 E3HLS1

E-3063 E3HC1

E-3063 E3HN1

E-3063 E3LC1

E-3063 E3LN3

E-3063 E3LN2

E-3063 E3LN1

E-4060 E4CH1

E-4060 E4H N 1

E-4060 E4LC1

E-4060 E4LN3

E-4060 E4LN2

E-4060 E4LN1

Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23

File details come from the government source that posted it. Updated .