Attachment VII - Drawings.pdf

PDF 547 KB Posted

Attached to
Z1DA--Paint Exterior of Various Buildings 610-24-214
Solicitation number
36C25023B0023
Issued by

About this file

This document package includes construction drawings and specifications for a federal solicitation to paint the exterior of various buildings at the Veterans Affairs Medical Center in Marion, Indiana. The solicitation number is 36C25023B0023 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The work involves preparing building surfaces, priming and applying two coats of exterior paint to over 20 structures on the medical center campus including buildings, structures, doors, windows, and roofs. The contractor will be responsible for providing all labor, equipment, materials and supervision to complete the work according to the drawings and specifications, which include preparation requirements, color matching, treatment of different material surfaces, coordination with the contracting officer, safety protocols, and procedures for repairs.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved: Medical Center Director

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N

I T E D S TAT ES OF A M ERIC

A

SR

IA

FF

A

SNARETEVFOTNEMTRAPE

Approved: Medical Center Assoc. Director

Approved: Engineering Department Zachary I. McDaniel

Drawing Title

F

610-24-214

Various

22-105M 107/15/2022

Marion, IN

Z.McDaniel C.Hatfield

Cover Sheet & General Notes

Anthony Colon

NORTHERN INDIANA HEALTH CARE SYSTEMS,

VETERANS ADMINISTRATION

1700 E. 38TH. STREET MARION, INDIANA 46953

PROJECT # 610-24-214

PAINT EXTEROIR OF VARIOUS BUILDINGS

Paint Exterior of Various Buildings

Michael E. Hershman

M

IS

SI

SS

IN

EW

A

RI

VE

R

NATIO

NAL CEM

ETARY

NATIONAL CEMETARY

N

ATIO

N

AL C

EM

ETAR

Y

65 114

N

ATIO

N

AL C

EM

ETAR

Y

COMPOUND

MATERIAL

COMPOUND

51 52

(2) 30,000

GAL. U.S.T.

T516

9 8

1301 / 733002 / 72

3001 / 69

ES / 3004

MB / 3

G01

3003 / 83

T504

E 38TH ST.

E 38TH ST. E 38TH ST. E 38TH ST.

S LIN

C

O

LN

BLVD

41 97

177 49

HA7

HA8

R.T.

HA9

HA1

DIESEL

HA6

HA3

HA4

WATER ST.

WATER ST.

M

CM

AH

O

N

AV

E.

CO

TT

AG

E

RD

CO

TT

AG

E

RD

BLACK RD.

WATER ST.

RAILROAD AVE.

BL

AC

K

RD

BL

AC

K

RD

EA

RTH

FI

LL

HA2 HA5

HA10

HA11

GRAY

R

D.

G R

AY

R

D

. STEELE CIRCLE

MCMAHON AVE.

MAIN ENTRANCE

MCMAHON AVE.

IN

DIA

NA

AV

E.

INDIANA AVE.

INDIANA AVE.

STEELE CIRCLE

BLACK RD.

BLACK RD. BLACK RD.

BLACK RD.

BL

AC

K R

D

BLACK RD.

G R

AY

R

D

ORCHARD AVE.

ORCHARD AVE.

ORCHARD AVE.

RIVER RD.

O

RCHARD AVE.

NELSON ST.

NELSON ST.

S LIN

C

O

LN

BLVD

S LIN

C

O

LN

BLVD

CHAPMAN AVE.

CHAPMAN AVE.

CHAPMAN AVE.

M

ISSISSIN

EW

A R

D

KUDER PL. KUDER PL.

NATIONAL CEMETERY

MAIN ENTRANCE

HYDE RD.

H

YD

E R D

H

YD

E R D

M

AR

IO

N

R D

M

AR

IO

N

R D

HYD

E

RD.

IR

W

IN

D

R

IR

W

IN

D

R

CHAPMAN AVE.

CHAPMAN AVE.

CHAPM

AN AVE.

STEELE C

IR

C

LE

NELSON ST.

SHORT ST.

M

EC

H

AN

IC

S AVE.

WATER ST.

SH

O

RT

S

T.

FLO

W

ER ST.

FLO

W

ER

ST.

RIVER RD.

RAILROAD AVE.

M

EC

H

AN

IC

S AVE.

VINE RD.

VINE RD.

DOCTOR'S RD.

D O

C

TO

R 'S R

D

D

IX R

D

D

IX R

D

1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIALS,

EQUIPMENT, AND SUPERVISION NECESSARY FOR FURNISHING AND INSTALLING NEW

PAINT IN CONFORMANCE WITH THE DETAILS AS SHOWN.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND PERFORMING

ANY AND ALL REQUIRED MEASUREMENTS USED IN PREPARATION OF BIDDING

DOCUMENTS.

3. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR BLOCKING OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY

BARRICADES, SIGNS, ECT...

4. TOOLS AND EQUIPMENT SHALL BE SECURED ANY TIME WORKERS ARE NOT IN THE

IMMEDIATE AREA. THE WORK SITE SHALL BE CLEANED UP AT THE CONCLUSION OF EACH

DAYS WORK.

5. UPON FINAL CLEAN-UP, THE CONTRACTOR SHALL REMOVE ANY DEBRIS, RUBBISH, AND

EXCESS MATERIAL FROM THE STATION.

6. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VA REGULATIONS, OSHA

STANDARDS AND INTERIM LIFE SAFETY MEASURES.

7. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGING ADJACENT

PAVING, SIDEWALKS, SHRUBBERY, ECT...IF DAMAGE OCCURS IT MUST BE REPAIRED AT

CONTRACTORS OWN EXPENSE PER PROJECT ENGINEERS APPROVAL.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED REPAIRS TO DAMAGED SOD.

COMPLETED REPAIRS MADE BY EXPERIENCED PERSONNEL SHALL MATCH THE EXISTING.

9. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH

THE PROJECT ENGINEER/COR AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE

CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. DEMOLISHED

AREAS SHALL BE REPAIRED WITHIN 7 WORKING DAYS OF THEIR REMOVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR A SCHEDULE ALLOWING A MINIMUM OF TEN

(10) DAYS ADVANCE NOTICE OF THE PLANNED START OF WORK/CONSTRUCTION

ACTIVITIES.

10. THE CONTRACTOR WILL BE ALLOWED TO WORK AFTER THE CLOSE OF REGULAR

BUSINESS HOURS IF HE CHOOSES. THIS SHALL BE SCHEDULED WITH THE PROJECT

ENGINEER/COR AND THE CONTRACTOR SHALL REPORT IN AND OUT WITH THE VA POLICE

WHEN WORKING AFTER HOURS.

11. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A

FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM

ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS NAME IS TO BE CERTIFIED TO THE VA

AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE

AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A

RESPONSIBLE PERSON CAN BE REACHED AFTER HOURS IN CASE OF PROBLEMS

ECT...SHALL BE PROVIDED ALSO.

12. ALL BUILDINGS SHALL BE POWER WASHED AND ALL GUTTERS AND DOWNSPOUTS SHALL

BE CLEANED OUT BEFORE ANY PAINT IS APPLIED. ANY LOOSE GUTTERS OR

DOWNSPOUTS SHALL BE REFASTENED. LOOSE GUTTER NAILS SHALL BE SECURED WITH

ADHESIVE.

13. IN SPEC SECTION 09 91 00 PAINTING SECTION (F) NO SPRAY, EXCEPT AS OTHERWISE

SPECIFIED, HAS BEEN APPROVED FOR SPRAYING FOR BUILDING #'S 165 AND 190.

SPRAYING WILL BE DONE AT CONTRACTOR'S OWN RISK FOR OVER SPRAY. ANY OVER

SPRAY THAT OCCURS SHALL BE PROPERLY CLEANED AT THE CONTRACTORS OWN

EXPENSE.

14. ANY METAL ROOFS ON THE INCLUDED BUILDINGS SHALL BE COMPLETELY PRIMED WITH

A RUST INHIBITED PRIMER AND PAINTED WITH "TWO COATS" OF PAINT. ALL COPPER IS

EXCLUDED FROM BEING PAINTED.

15. ALL SCREENED IN PORCH AREAS, STORM WINDOWS, LINTELS, CONDUIT AND OVER HEAD

DOORS SHALL ALSO BE PRIMED AND PAINTED "TWO COATS". ALSO INCLUDE ANY AND

ALL ROOF VENTS, STACKS, PIPES, AIR HANDLERS, ECT...

16. ALL LINTELS SHALL BE PRIMED AND PAINTED "TWO COATS".

17. FOR ALL EXTERIOR DOORS PAINT ENTIRE DOOR AND FRAME INCLUDING INTERIOR SIDE.

18. ALL ROTTED OR DAMAGED WOOD SHALL BE REPLACED. THE CONTRACTOR SHALL

INSTALL NEW GLAZING PUTTY WHERE NEEDED AND USE 60 YEAR ACRYLIC LATEX

PAINTABLE CAULKING TO FILL GAPS AND CRACKS.

19. PAINT COLORS SHALL MATCH EXISTING PAINT, SEE SPECIFICATION FOR OTHER DETAILS.

GENERAL NOTES:BUILDING GROUPS:

Group 1 Buildings: 51, 52, 53, 54 Group 2 Buildings: 58 Group 3 Buildings: 76, 79 Group 4 Buildings: 137, 153,165 Group 5 Buildings: 190, T504, T516

Group 6 Buildings: 8, 9, 55, 170, 173

AutoCAD SHX Text N

Sheets and Views
Model

File details come from the government source that posted it. Updated .