Attachment VII - Drawings.pdf
PDF 547 KB Posted
- Solicitation number
- 36C25023B0023
About this file
This document package includes construction drawings and specifications for a federal solicitation to paint the exterior of various buildings at the Veterans Affairs Medical Center in Marion, Indiana. The solicitation number is 36C25023B0023 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The work involves preparing building surfaces, priming and applying two coats of exterior paint to over 20 structures on the medical center campus including buildings, structures, doors, windows, and roofs. The contractor will be responsible for providing all labor, equipment, materials and supervision to complete the work according to the drawings and specifications, which include preparation requirements, color matching, treatment of different material surfaces, coordination with the contracting officer, safety protocols, and procedures for repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25023B0023 0005.docx | DOCX document | |
| Attachment XII - FINAL CORRECTED Combined Specifications_ (003).pdf | ||
| 36C25023B0023 0004.docx | DOCX document | |
| Attachment XI - CORRECTED Combined Specifications_.pdf | ||
| 36C25023B0023 0003.docx | DOCX document | |
| Attachment VIII - Pre-Bid RFI QUESTIONS and ANSWERS.docx | DOCX document | |
| Attachment IX - Site Walk Sign In Sheet.pdf | ||
| Attachment X - BID SCHEDULE FINAL.docx | DOCX document | |
| 36C25023B0023 0002.docx | DOCX document | |
| 36C25023B0023 0001.docx | DOCX document | |
| Attachment VI - Combined Specifications .pdf | ||
| Attachment III - DBA WD.pdf | ||
| Attachment V - VHA Directive 1192-01.pdf | ||
| Attachment II - EMR.pdf | ||
| Attachment IV - Limitations on Subcontracting - Certificate of Compliance.pdf | ||
| ATTACHMENT I - RFI.pdf | ||
| 36C25023B0023_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Medical Center Director
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date on e ei gh th in ch o ne fo ot
B
A
C
D
E th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
D
U N
I T E D S TAT ES OF A M ERIC
A
SR
IA
FF
A
SNARETEVFOTNEMTRAPE
Approved: Medical Center Assoc. Director
Approved: Engineering Department Zachary I. McDaniel
Drawing Title
F
610-24-214
Various
22-105M 107/15/2022
Marion, IN
Z.McDaniel C.Hatfield
Cover Sheet & General Notes
Anthony Colon
NORTHERN INDIANA HEALTH CARE SYSTEMS,
VETERANS ADMINISTRATION
1700 E. 38TH. STREET MARION, INDIANA 46953
PROJECT # 610-24-214
PAINT EXTEROIR OF VARIOUS BUILDINGS
Paint Exterior of Various Buildings
Michael E. Hershman
M
IS
SI
SS
IN
EW
A
RI
VE
R
NATIO
NAL CEM
ETARY
NATIONAL CEMETARY
N
ATIO
N
AL C
EM
ETAR
Y
65 114
N
ATIO
N
AL C
EM
ETAR
Y
COMPOUND
MATERIAL
COMPOUND
51 52
(2) 30,000
GAL. U.S.T.
T516
9 8
1301 / 733002 / 72
3001 / 69
ES / 3004
MB / 3
G01
3003 / 83
T504
E 38TH ST.
E 38TH ST. E 38TH ST. E 38TH ST.
S LIN
C
O
LN
BLVD
41 97
177 49
HA7
HA8
R.T.
HA9
HA1
DIESEL
HA6
HA3
HA4
WATER ST.
WATER ST.
M
CM
AH
O
N
AV
E.
CO
TT
AG
E
RD
CO
TT
AG
E
RD
BLACK RD.
WATER ST.
RAILROAD AVE.
BL
AC
K
RD
BL
AC
K
RD
EA
RTH
FI
LL
HA2 HA5
HA10
HA11
GRAY
R
D.
G R
AY
R
D
. STEELE CIRCLE
MCMAHON AVE.
MAIN ENTRANCE
MCMAHON AVE.
IN
DIA
NA
AV
E.
INDIANA AVE.
INDIANA AVE.
STEELE CIRCLE
BLACK RD.
BLACK RD. BLACK RD.
BLACK RD.
BL
AC
K R
D
BLACK RD.
G R
AY
R
D
ORCHARD AVE.
ORCHARD AVE.
ORCHARD AVE.
RIVER RD.
O
RCHARD AVE.
NELSON ST.
NELSON ST.
S LIN
C
O
LN
BLVD
S LIN
C
O
LN
BLVD
CHAPMAN AVE.
CHAPMAN AVE.
CHAPMAN AVE.
M
ISSISSIN
EW
A R
D
KUDER PL. KUDER PL.
NATIONAL CEMETERY
MAIN ENTRANCE
HYDE RD.
H
YD
E R D
H
YD
E R D
M
AR
IO
N
R D
M
AR
IO
N
R D
HYD
E
RD.
IR
W
IN
D
R
IR
W
IN
D
R
CHAPMAN AVE.
CHAPMAN AVE.
CHAPM
AN AVE.
STEELE C
IR
C
LE
NELSON ST.
SHORT ST.
M
EC
H
AN
IC
S AVE.
WATER ST.
SH
O
RT
S
T.
FLO
W
ER ST.
FLO
W
ER
ST.
RIVER RD.
RAILROAD AVE.
M
EC
H
AN
IC
S AVE.
VINE RD.
VINE RD.
DOCTOR'S RD.
D O
C
TO
R 'S R
D
D
IX R
D
D
IX R
D
1. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL LABOR, MATERIALS,
EQUIPMENT, AND SUPERVISION NECESSARY FOR FURNISHING AND INSTALLING NEW
PAINT IN CONFORMANCE WITH THE DETAILS AS SHOWN.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND PERFORMING
ANY AND ALL REQUIRED MEASUREMENTS USED IN PREPARATION OF BIDDING
DOCUMENTS.
3. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR BLOCKING OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY
BARRICADES, SIGNS, ECT...
4. TOOLS AND EQUIPMENT SHALL BE SECURED ANY TIME WORKERS ARE NOT IN THE
IMMEDIATE AREA. THE WORK SITE SHALL BE CLEANED UP AT THE CONCLUSION OF EACH
DAYS WORK.
5. UPON FINAL CLEAN-UP, THE CONTRACTOR SHALL REMOVE ANY DEBRIS, RUBBISH, AND
EXCESS MATERIAL FROM THE STATION.
6. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VA REGULATIONS, OSHA
STANDARDS AND INTERIM LIFE SAFETY MEASURES.
7. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGING ADJACENT
PAVING, SIDEWALKS, SHRUBBERY, ECT...IF DAMAGE OCCURS IT MUST BE REPAIRED AT
CONTRACTORS OWN EXPENSE PER PROJECT ENGINEERS APPROVAL.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED REPAIRS TO DAMAGED SOD.
COMPLETED REPAIRS MADE BY EXPERIENCED PERSONNEL SHALL MATCH THE EXISTING.
9. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH
THE PROJECT ENGINEER/COR AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE
CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. DEMOLISHED
AREAS SHALL BE REPAIRED WITHIN 7 WORKING DAYS OF THEIR REMOVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR A SCHEDULE ALLOWING A MINIMUM OF TEN
(10) DAYS ADVANCE NOTICE OF THE PLANNED START OF WORK/CONSTRUCTION
ACTIVITIES.
10. THE CONTRACTOR WILL BE ALLOWED TO WORK AFTER THE CLOSE OF REGULAR
BUSINESS HOURS IF HE CHOOSES. THIS SHALL BE SCHEDULED WITH THE PROJECT
ENGINEER/COR AND THE CONTRACTOR SHALL REPORT IN AND OUT WITH THE VA POLICE
WHEN WORKING AFTER HOURS.
11. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A
FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM
ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS NAME IS TO BE CERTIFIED TO THE VA
AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE
AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A
RESPONSIBLE PERSON CAN BE REACHED AFTER HOURS IN CASE OF PROBLEMS
ECT...SHALL BE PROVIDED ALSO.
12. ALL BUILDINGS SHALL BE POWER WASHED AND ALL GUTTERS AND DOWNSPOUTS SHALL
BE CLEANED OUT BEFORE ANY PAINT IS APPLIED. ANY LOOSE GUTTERS OR
DOWNSPOUTS SHALL BE REFASTENED. LOOSE GUTTER NAILS SHALL BE SECURED WITH
ADHESIVE.
13. IN SPEC SECTION 09 91 00 PAINTING SECTION (F) NO SPRAY, EXCEPT AS OTHERWISE
SPECIFIED, HAS BEEN APPROVED FOR SPRAYING FOR BUILDING #'S 165 AND 190.
SPRAYING WILL BE DONE AT CONTRACTOR'S OWN RISK FOR OVER SPRAY. ANY OVER
SPRAY THAT OCCURS SHALL BE PROPERLY CLEANED AT THE CONTRACTORS OWN
EXPENSE.
14. ANY METAL ROOFS ON THE INCLUDED BUILDINGS SHALL BE COMPLETELY PRIMED WITH
A RUST INHIBITED PRIMER AND PAINTED WITH "TWO COATS" OF PAINT. ALL COPPER IS
EXCLUDED FROM BEING PAINTED.
15. ALL SCREENED IN PORCH AREAS, STORM WINDOWS, LINTELS, CONDUIT AND OVER HEAD
DOORS SHALL ALSO BE PRIMED AND PAINTED "TWO COATS". ALSO INCLUDE ANY AND
ALL ROOF VENTS, STACKS, PIPES, AIR HANDLERS, ECT...
16. ALL LINTELS SHALL BE PRIMED AND PAINTED "TWO COATS".
17. FOR ALL EXTERIOR DOORS PAINT ENTIRE DOOR AND FRAME INCLUDING INTERIOR SIDE.
18. ALL ROTTED OR DAMAGED WOOD SHALL BE REPLACED. THE CONTRACTOR SHALL
INSTALL NEW GLAZING PUTTY WHERE NEEDED AND USE 60 YEAR ACRYLIC LATEX
PAINTABLE CAULKING TO FILL GAPS AND CRACKS.
19. PAINT COLORS SHALL MATCH EXISTING PAINT, SEE SPECIFICATION FOR OTHER DETAILS.
GENERAL NOTES:BUILDING GROUPS:
Group 1 Buildings: 51, 52, 53, 54 Group 2 Buildings: 58 Group 3 Buildings: 76, 79 Group 4 Buildings: 137, 153,165 Group 5 Buildings: 190, T504, T516
Group 6 Buildings: 8, 9, 55, 170, 173
AutoCAD SHX Text N
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .