Attachment X - BID SCHEDULE FINAL.docx

DOCX document 17 KB Posted

Attached to
Z1DA--Paint Exterior of Various Buildings 610-24-214
Solicitation number
36C25023B0023
Issued by

About this file

This document outlines a bid schedule for exterior painting services at various buildings for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The bid schedule includes a base bid and six alternates that propose completing the work in progressively fewer buildings and shorter timeframes. The base bid involves painting 18 listed buildings over 180 calendar days, while Alternate 6 involves only 4 buildings over 30 calendar days. Building groupings and the buildings included in each alternate are defined. Pricing must be provided for each proposal.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID-SCHEDULE:

BASE BID ITEM 1: This is to include all of the work that is outlined in the bid documents and is limited to the buildings listed in the groups below. (Bid on Group 1 + Group 2 + Group 3 + Group 4 + Group 5+ Group 6). This includes buildings 8, 9, 51, 52, 53, 54, 55, 58, 76, 79, 137, 153, 165, 170, 173, 190, T504, and T516, based on the contract Scope of Work.

Construction completion time:180 calendar days from notice to proceed.

ALTERNATE NO.2: All work included in BASE BID ITEM 1 Minus all buildings in Group 6. (Bid on Group 1 + Group 2 + Group 3 + Group 4 + Group 5 only) This includes buildings 51, 52, 53, 54, 58, 76, 79, 137, 153, 165, 190, T504, and T516, based on the contract Scope of Work.

Construction completion time: 150 calendar days from notice to proceed.

ALTERNATE NO. 3: All work included in Alternate No. 2 Minus all buildings in Group 5. (Bid on Group 1 + Group 2 + Group 3 + Group 4 only) This includes buildings 51, 52, 53, 54, 58, 76, 79, 137, 153, and 165, based on the contract Scope of Work.

Construction completion time: 120 calendar days from notice to proceed.

ALTERNATE NO. 4: All work included in Alternate No. 3 Minus all buildings in Group 4. (Bid on Group 1 + Group 2 + Group 3 only) This includes buildings 51, 52, 53, 54, 58, 76, and 79, based on the contract Scope of Work.

Construction completion time: 90 calendar days from notice to proceed.

ALTERNATE NO. 5: All work included in Alternate No. 4 Minus all buildings in Group 3. (Bid on Group 1 + Group 2 only) This includes buildings 51, 52, 53, 54, and 58, based on the contract Scope of Work.

Construction completion time: 60 calendar days from notice to proceed.

ALTERNATE NO. 6: All work included in Alternate No. 5 Minus all buildings in Group 2. (Bid on Group 1 only). This includes buildings 51, 52, 53, and 54, based on the contract Scope of Work.

Construction completion time: 30 calendar days from notice to proceed.

A description of the Groupings of buildings as outlined in contract documents.

Group 1Buildings: 51, 52, 53, 54
Group 2Buildings: 58
Group 3Buildings: 76, 79
Group 4Buildings: 137, 153,165
Group 5Buildings: 190, T504, T516
Group 6Buildings: 8, 9, 55, 170, 173