This document includes a federal contract opportunity solicitation for generator maintenance services. The United States Department of Agriculture seeks to award a contract to provide on-site maintenance, emergency repair services, and fuel system maintenance for sixteen generators located in Kansas City and St. Louis, Missouri. Services include monthly, quarterly, annual, and multi-year maintenance for Cummins and Baldor generators. The contractor must also clean fuel tanks and recondition fuel within fifteen days of the notice to proceed. The period of performance is one base year with four option years. Interested firms must be registered in SAM.GOV and include business information in responses, which are due by May 22, 2020 to Emily Strunk at the specified email address. Pricing details and maintenance checklist samples are provided in the attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment V - Pricing Submittal Spreadsheets Annual (12 Months)
(9) Cummins Generators and Generator Fuel Storage Tanks (Kansas City)
See Attachment One
Item No. Description Quantity /
Frequency Base Year
Opt Yr
Opt Yr
Opt Yr
Opt Yr
01 On-call maintenance 24 hours per day 7 days per week and Miscellaneous Repairs as needed.
Lump Sum
02 Monthly Maintenance 12 Times (Monthly)
03 Semi-Annual Maintenance (Due in First and Third Quarters of Contract).
Two Times (First and
Third Quarters)
04 Annual Maintenance (Due in Third Quarter of Contract).
Once (Third Quarter)
05 Three-Year Maintenance (Due in Third Quarter of Contract) (Due in FY2020).
Once (Third Quarter
06 Provide Fuel Tank Cleaning, Fuel Polishing, and Fuel Treatment.
Once (First
07 Provide a total of 3,000 Gallons of Diesel Fuel for (2) Existing Bulk Diesel Fuel Storage Tanks
Once (First
08 Service and maintenance of fuel pumps, supply and return piping, and controls.
Lump Sum
Sub-Total
Pricing Schedule Annual (12 Months)
(3) Baldor Generators and Generator Fuel Storage Tanks (St. Louis)
See Attachment Two Item No. Description Quantity /
Frequency Base Year
Opt Yr
Opt Yr
Opt Yr
Opt Yr
09 On-call maintenance 24 hours per day 7 days per week and Miscellaneous Repairs as needed.
Lump Sum $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00
10 Monthly Maintenance. 12 Times (Monthly)
$8,878.00 $9,233.00 $9,600.00 $9,984.00 $10,383.00
11 Semi-annual Maintenance (Due in First and Third Quarters of Contract)
Two Times (First and Third Quarter)
$5,073.00 $5,276.00 $5,487.00 $5,706.00 $5,934.00
12 Annual Maintenance (Due in Third Quarter of Contract).
Once (Third Quarter)
$32,224.00 $27,793.00 $34,905.00 $30,061.00 $37,563.00
13 Provide Fuel Tank Cleaning, Fuel Polishing, and Fuel Treatment.
Once (October) $17,270.00 $19,000.00 $21,000.00 $23,100.00 $25,410.00
14 On-Call Diesel Fuel Deliveries for (1) Existing Bulk Diesel Fuel Storage Tank as needed.
Lump Sum $12,000.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00
15 Service and maintenance of fuel pumps, supply and return piping, and controls.
Lump Sum $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00
Sub-Total
Base Year Opt Yr 1 Opt Yr 2 Opt Yr 3 Opt Yr 4 Total
Attachment One (1) Kansas City, MO Cummins Monthly Maintenance Checklist
Cummins Generators MONTHLY GENERATOR MAINTENANCE LOG PAGE 1 OF 3
WORK TO BE PERFORMED OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
MONTHLY
HOURS OF OPERATION
BEFORE GENERATOR START-UP:
WALK AROUND INSPECTION
CHECK ALL BATTERY CONNECTIONS
CHECK ELECTROLYTE LEVELS
CHECK COOLANT LEVEL FOR OIL
RECORD ANTI-FREEZE STRENGTH
CHECK ALL FUEL LINES FOR LEAKS
CHECK & CLEAN DAY FUEL TANK
PUMPS & AREA
CHECK MSA FUEL SENSOR
RECORD FUEL READING ON FUEL
LOG (LOCATED BY GAUGE)
CHECK FOR H2O IN ALL FUEL TANKS
CHECK ENGINE OIL
CHECK ALL BELTS; REPAIR IF NEEDED
IF DIESEL TANK < 1/2 FULL NOTIFY COR
CLEAN DIRT & DUST FROM EXTERIOR
OF UNIT
CLEAN INTERIOR OF GENERATOR
SHELTER
BLOW-OUT GENERATOR WINDINGS
WHILE GENERATOR IS RUNNING
RECORD OIL PRESSURE (psi) RECORD FUEL PRESSURE (psi) RECORD FREQUENCY (rpm)
RECORD GENERATED VOLTAGE
RECORD CHARGING AMPERAGE
CHECK GOVERNOR OPERATION
INSPECT PARALELLING GEAR FOR
PROPER OPERATION ADJUST
SETTINGS AS NECESSARY
MANUALLY STICK UNDERGROUND FUEL
TANK AND RECORD READINGS ON LOG
Attachment Two (2) St. Louis, MO Baldor Monthly Maintenance Checklist
1250 KW BALDOR GENERATORS MONTHLY GENERATOR MAINTENANCE LOG PAGE 1 OF 3
MONTHLY
RECORD HOURS OF OPERATION
BEFORE GENERATOR START-UP:
CONDUCT EXTERNAL INSPECTION (CHECK FOR LEAKAGE OF FUEL, OIL, COOLANT)
CHECK FUEL LEVEL AND RECORD READINGS IN LOG. NOTIFY COR IF 1/2 TANK
OR BELOW.
CHECK ENGINE OIL LEVEL (CHECK FOR MIXING OF OIL AND WATER)
CHECK AIR COOLER FOR LEAKS
CHECK ALL BATTERY CONNECTIONS AND ELECTROLYTE LEVELS
RECORD ANTI-FREEZE STRENGTH (CHECK FOR OIL IN COOLANT)
INSPECT FUEL CONTROL LINKAGES AND BALL JOINTS
CLEAN FUEL FILTER (WIRE ELEMENT TYPE) TURN HANDLE ONE OR TWO TIMES
CHECK BELTS FOR WEAR AND REPLACE AS NEEDED
CLEAN INTERIOR OF GENERATOR ENCLOSURE
BLOW OUT GENERATOR WINDINGS
CHECK ALL FUEL LINES FOR LEAKS
CHECK FUEL PUMPS FOR LEAKS AND TEST RUN FOR PROPER OPERATION
CHECK FOR WATER IN ALL FUEL TANKS
WHILE GENERATOR IS RUNNING FOR 1/2 HOUR UNDER LOAD
CHECK FOR EASE OF STARTING, COLOR OF EXHAUST SMOKE, ABNORMAL
VIBRATION, NOISE, SMELL, ETC., AND GAUGE INDICATION OF A PROBLEM
RECORD EXHAUST TEMPERATURE GAUGE, IF PRESENT
RECORD TACHOMETER
RECORD OIL PRESSURE (psi) RECORD FUEL PRESSURE (psi) RECORD FREQUENCY (rpm)
RECORD GENERATED VOLTAGE
RECORD CHARGING AMPERAGE
CHECK GOVERNOR OPERATION
RECORD OUTPUT POWER (KW)
CHECK FUEL INJECTION PUMP AND HYDRAULIC AND ELECTRONIC GOVERNOR
RACK MOVEMENT
INSPECT PARALELLING GEAR FOR PROPER OPERATION; ADJUST AS NEEDED
MANUALLY STICK ABOVEGROUND FUEL TANK AND RECORD READINGS IN LOG
TANK AND RECORD READINGS ON LOG
Attachment Three (3) DISC Generator Monthly Maintenance Requirements for Emergency Standby situations
Purpose The below lists the specific monthly maintenance requirements for the thirteen (13) emergency standby generators supporting DISC data center operations in both Kansas City and Saint Louis Missouri:
Monthly A. Generator Units – Before Engine Start
1) RECORD HOURS OF OPERATION
2) CONDUCT EXTERNAL INSPECTION (CHECK FOR LEAKAGE OF FUEL, OIL, COOLANT)
3) CHECK FUEL LEVEL IN DAY TANK
4) CHECK FOR WATER IN DAY TANK
5) CHECK BELTS FOR WEAR
6) CHECK ALL BATTERY CONNECTIONS AND ELECTROLYTE LEVELS
7) INSPECT FUEL CONTROL LINKAGES AND BALL JOINTS
8) VERIFY PROPER OPERATION OF BLOCK HEATERS
9) RECORD ANTI-FREEZE STRENGTH (CHECK FOR OIL IN COOLANT)
B. Generator Units – 15 Minutes After Engine Start
1) CHECK FOR EASE OF STARTING, COLOR OF EXHAUST SMOKE, ABNORMAL VIBRATION, NOISE, SMELL, ETC. AND
GAUGE INDICATION OF A PROBLEM
2) CHECK FUEL PUMPS FOR LEAKS AND TEST RUN FOR PROPER OPERATION
3) CHECK ALL FUEL LINES FOR LEAKS
4) RECORD EXHAUST TEMPERATURE GAUGE, IF PRESENT
5) RECORD TACHOMETER
6) RECORD OIL PRESSURE (psi)
7) RECORD FUEL PRESSURE (psi)
8) RECORD FREQUENCY (rpm)
9) RECORD GENERATED VOLTAGE
10) RECORD CHARGING AMPERAGE
11) CHECK GOVERNOR OPERATION
12) RECORD OUTPUT POWER (KW)
13) CHECK FUEL INJECTION PUMP AND HYDRAULIC AND ELECTRONIC GOVERNOR
C. Post Operation Fuel System Checks and Cleaning
1) CLEAN FUEL FILTER (WIRE ELEMENT TYPE)
2) BLOW OUT GENERATOR WINDINGS
3) CLEAN INTERIOR OF GENERATOR ENCLOSURE
4) MANUALLY STICK ABOVEGROUND FUEL TANK AND RECORD READINGS IN LOG
5) INSPECT PARALELLING GEAR FOR PROPER OPERATION; ADJUST AS NEEDED
Attachment Four (4) Kansas City, MO Cummins Semi-Annual Maintenance Checklist
Cummins Generators
SEMI-ANNUAL & ANNUAL
GENERATOR MAINTENANCE LOG
WORK TO BE
PERFORMED OCT
N O V
D E C
J A N
F E B
M A R
A P R
M
AY
JU
N
J U L
A U G
S E P
SEMI-ANNUAL
PERFORM MONTHLY
MAINTENANCE
REPLACE AIR FILTERS IF
NEEDED
CHECK CONTROL PANEL
FOR LOOSE
WIRING
CHECK INTAKE/EXHAUST
AREAS
CHECK HOLD DOWN
BOLTS
YEARLY (THIRD
QUARTER)
PERFORM MONTHLY &
QUARTERLY
MAINTENANCE
BEFORE ENGINE START-
UP:
CHECK COOLANT (ADD
CONDITIONER
IF NEEDED)
DRAIN WATER &
SEDIMENT FROM FUEL
TANK
CHANGE FUEL/WATER
FILTERS
REPLACE ALL AIR FILTERS
INCLUDING DAY AND
BELLY TANKS
CHANGE ENGINE OIL &
FILTER
TAKE OIL SAMPLE FOR
ANALYSIS
CLEAN/CHANGE
CRANKCASE BREATHERS
CHECK VALVE LASH,
VALVE BRIDGE &
INJECTOR TIMING
CHECK ADJUST &
LUBRICATE LINKAGES
LUBRICATE GENERATOR
BEARINGS
CHECK FAN FOR HUB
BEARING PLAY
CLEAN RADIATOR & FAN
ASSEMBLY
REPLACE BATTERIES
EVERY 2 YEARS
2013, 2015, 2017, 2020, WHILE GENERATORS
RUN:
PERFORM MONTHLY &
SEMI-ANNUAL
MAINTENANCE
LOAD TEST OF AT LEAST
30% FOR
MINIMUM OF 2 HOURS
WITH LOAD BANK
RECORD SERVICE METER
RECORD ENGINE JACKET
WATER
TEMPERATURE
RECORD EXHAUST
TEMPERATURE
MAKE ANY REPAIRS OR
ADJUSTMENTS AS
NEEDED
AFTER GENERATORS
RUN:
CHECK OIL LEVEL
CHECK FOR LEAKS-
WATER, FUEL, OIL
CHECK TO INSURE
STATUS IN AUTO-START
MODE & BREAKERS SET
First and Third Quarters take fuel samples of all tanks
Attachment Five (5) St. Louis, MO Baldor Semi-Annual Maintenance Checklist
1250 KW BALDOR GENERATORS SEMI-ANNUAL & ANNUAL GENERATOR MAINTENANCE LOG PAGE 2 OF 3
SEMI-ANNUALLY (First and Third Quarters)
PERFORM MONTHLY MAINTENANCE
REPLACE AIR FILTERS IF NEEDED
CHECK CONTROL PANEL FOR LOOSE WIRING
CHECK INTAKE/EXHAUST AREAS
CHECK HOLD DOWN BOLTS
CHECK LLC CONCENTRATION IN THE COOLANT
CLEAN THE INSIDE OF THE COOLANT TANK
ANNUALLY (THIRD QUARTER)
PERFORM MONTHLY & SEMI-ANNUAL MAINTENANCE
INSPECT V BELT. ADJUST TENSION AS NEEDED. REPLACE BELTS
AS NEEDED.
INSPECT AND TIGHTEN EXTERNAL NUTS, BOLTS.
INSPECT AND ADJUST VALVE CLEARANCE AND RELATED PARTS
INSPECT VIBRATION ISOLATING RUBBER COMPONENTS
INSPECT FOUNDATION ANCHOR NUTS, BOLTS
INSPECT COUPLINGS. REPLACE COUPLINGS AS NEEDED
DRAIN WATER AND SEDIMENT FROM ALL FUEL TANKS
DRAIN WATER FROM WIRE ELEMENT-TYPE FUEL FILTERS
INSPECT AND ADJUST FUEL INJECTION NOZZLE SPRAY CONDITION
AND SPRAY PRESSURE
INSPECT AND ADJUST FUEL INJECTION TIMING
PERFORM ENGINE OIL SAMPLING AND ANALYSIS
INSPECT AND ADJUST ENGINE OIL PRESSURE
INSPECT WATER PUMP
INSPECT AND CLEAN STRAINER FOR COOLANT
ANALYZE COOLANT PROPERTIES AND REPLACE AS NEEDED
INSPECT AIR FILTER. REPLACE AIR FILTER AS NEEDED.
INSPECT STARTER(S)
INSPECT ALTERNATOR
CHECK SPECIFIC GRAVITY OF BATTERY ELECTROLYTE
INSPECT AIR HEATER
CHECK FOR ANY LOOSE WIRES OR LOOSE CONNECTIONS
CHECK DEVICES FOR PROPER OPERATION: HIGH TEMP, LOW OIL
PRESSURE, OVERSPEED, START FAILURE, WATER SUPPLY FAILURE,
UNDERVOLTAGE, OVERVOLTAGE, OVERCURRENT, LOW COOLANT
LEVEL, LOW FUEL LEVEL, ETC.
CHECK AUXILIARY DEVICES FOR PROPER OPERATION: FUEL
CONTROL SOLENOIDS, FUEL SUPPLY PUMPS, UNIT HEATERS,
WATER JACKET HEATERS, BATTERY CHARGERS, ETC.
AFTER GENERATORS RUN:
CHECK OIL LEVEL
CHECK FOR LEAKS-WATER, FUEL, OIL
CHECK TO INSURE STATUS IN AUTO-START MODE & BREAKERS SET
RECORD SERVICE METER
MAKE ANY REPAIRS OR ADJUSTMENTS AS
NEEDED
TAKE FUEL SAMPLES OF ALL TANKS
IN FIRST AND THIRD QUARTERS
Attachment Six (6) St. Louis, MO Baldor Two and Four Year Maintenance Checklist
1250 KW BALDOR GENERATORS TWO-YEAR AND FOUR-YEAR GENERATOR MAINTENANCE LOG
WORK TO BE PERFORMED DURING TWO-YEAR MAINTENANCE
(THIRD QUARTER): 2020 2022 2024 2026 2028 2030
PERFORM MONTHLY, SEMI-ANNUAL, AND ANNUAL
MAINTENANCE
CHANGE ENGINE OIL, OIL FILTERS, AND BYPASS OIL
SAMPLE AND ANALYZE ENGINE OIL PROPERTIES
CLEAN WIRE ELEMENT FUEL FILTERS
CHANGE NON-WIRE ELEMENT FUEL FILTERS
DRAIN & CLEAN COOLING SYSTEM
REPLACE THERMOSTATS, GASKETS, AND SEALS
REFILL COOLING SYSTEM
REPLACE RUBBER BELTS & HOSES
REPLACE BATTERIES
CHECK/INSPECT TURBOCHARGERS
WORK TO BE PERFORMED DURING FOUR-YEAR MAINTENANCE
(THIRD QUARTER): 2020 2024 2028
PERFORM MONTHLY, SEMI-ANNUAL, ANNUAL, AND TWO-YEAR
MAINTENANCE
CHECK OIL COOLER FOR SOILING, CLOGGING, AND LEAKAGE
CHECK OIL PUMP FOR DISCOLORATION AND OTHER EXTERNAL
DEFECTS
INSPECT AND TEST GOVERNOR. REPAIR AS NEEDED.
INSPECT AND CLEAN FUEL TANK
INSPECT AND TEST FUEL INJECTION PUMP. REPAIR AS NEEDED.
REPLACE RUBBER HOSES.
INSPECT AND CLEAN AIR CLEANER ELEMENT
INSPECT AND CLEAN PRE-CLEANER
INSPECT ALL GAUGES. REPAIR AS NEEDED.