Attachment Two CMRD Routine Road Maintenance Schedule of Items.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Road Maintenance for Forest System Roads Federal contract opportunity
- Solicitation number
- 12445221Q0035
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment Two A001 Base Schedule of Items.pdf | ||
| Attachment Three A001 Optional Schedule of Items.pdf | ||
| Apalachicola Road Maintenance and Repair Base SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| 12445221Q0035 Amendment.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Apalachicola Road Maintenance and Repair SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Attachment Five- Wage Determination.pdf | ||
| 12445221Q0035 RFQ.pdf | ||
| Attachment Four- DrawingsRoad Maintenance_Drawings.pdf | ||
| Attachment Three CMK2 Recurrent Road Maintenance Schedule of Items .xlsx | XLSX spreadsheet | |
| Attachment One- Statement of Work _.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021_CMRD_WO_1
| Apalachicola Road Maintenance and Repair | |||||||||||||
| Schedule of Items | |||||||||||||
| CMRD Routine Road Maintenance | |||||||||||||
| ROAD | FROM/TO (TERMINI) | LENGTH | ROAD MATERIAL | Notes | BLADE & COMPACT | DISC, BLADE & COMPACT | SPOT SURFACE "SAND/CLAY" | SPOT SURFACE "AGGREGATE BASE" | EQUIPMENT RENTAL | ROAD DITCHES | CMP INSTALL/ REPLACE, GOV'T FURNISHED | CMP INSTALL/ REPLACE, 36-INCH | ROCK CROSSING INSTALL/ REPLACE |
| CRITICAL SUBTASK NUMBER: | 5.1.2 | 5.1.3 | 5.2.1(a) | 5.2.2 | 5.3.3 | 5.4.1 | 5.6.1 | 5.6.2 | 5.6.5 | ||||
| UNITS: | MI | MI | CY | TON | HR | MI | LF | LF | LF | ||||
| FH-13 | Hwy 65/Hwy 67 | 17.00 | LR | Replace culvert | 17 | 160 | 540 | 20.25 | 50 | ||||
| 305 | Hwy 267/358 | 8.00 | Road reconditioning | 8 | 200 | 8 | |||||||
| 309 | Hwy 267/Hwy 375 | 19.80 | Road reconditioning | 19.8 | 100 | 19.8 | |||||||
| 313 | 359/Hwy 267 | 7.60 | Road reconditioning post bridge removal | 7.6 | 200 | 7.6 | |||||||
| 314 | Hwy 375/309 | 13.50 | Road reconditioning | 13.5 | |||||||||
| 348 | 365/309 | 10.8 | Replace culverts | 10.8 | 160 | 560 | 9.2 | 40 | 50 | ||||
| 350 | FH-13/309 | 5.60 | Erosion repair | 5.6 | 60 | 5.6 | 150 | ||||||
| 360 | 309/301 | 8.10 | Road reconditioning | 8.1 | 8.1 | ||||||||
| 367 | 360/Hwy 267 | 8.20 | Road reconditioning | 8.2 | 8.2 | ||||||||
| 374 | 360/367 | 3.10 | Road reconditioning | 3.1 | 3.1 | ||||||||
| 101 | Hwy 65/EOC | 2.00 | Road reconditioning | 2 | 2 | ||||||||
| 103 | 105/Hwy 65 | 5.90 | Road reconditioning | 3.97 | 3.97 | ||||||||
| 103E | 103/128 | 0.96 | Road reconditioning | 0.96 | 0.96 | ||||||||
| 105 | Hwy 65/Hwy 12 | 12.30 | Road reconditioning | 12.3 | 12.3 | ||||||||
| 109 | Hwy 379/Hwy 12 | 5.90 | Road reconditioning | 5.9 | 463.78 | 5.9 | |||||||
| 122 | 107/187 | 4.30 | Road reconditioning | 4.3 | 4.3 | ||||||||
| 128 | Hwy 65/103 | 5.60 | Road reconditioning | 5.6 | |||||||||
| 132 | Hwy 65/103 | 2.30 | Road reconditioning | 2.3 | 2.3 | ||||||||
| 150 | Hwy 12/EOC | 1.80 | Road reconditioning | 1.8 | 1.8 | ||||||||
| 173 | 109/113 | 2.50 | Road reconditioning | 2.5 | 2.5 | ||||||||
| 180 | Hwy 379/Hwy 65 | 5.00 | Road reconditioning | 5 | 5 |
| Quantity Totals: | 0 | 148.33 | 320 | 2123.78 | 29.45 | 101.43 | 40 | 40 | 200 |
| Unit Price: | |||||||||
| Dollar Total (per activity): | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Dollar Total (Contract): $0.00