Attachment Two A001 Base Schedule of Items.pdf
PDF 128 KB Posted
- Attached to
- Road Maintenance for Forest System Roads Federal contract opportunity
- Solicitation number
- 12445221Q0035
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment Three A001 Optional Schedule of Items.pdf | ||
| Apalachicola Road Maintenance and Repair Base SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| 12445221Q0035 Amendment.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Apalachicola Road Maintenance and Repair SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Attachment Five- Wage Determination.pdf | ||
| 12445221Q0035 RFQ.pdf | ||
| Attachment Four- DrawingsRoad Maintenance_Drawings.pdf | ||
| Attachment Three CMK2 Recurrent Road Maintenance Schedule of Items .xlsx | XLSX spreadsheet | |
| Attachment One- Statement of Work _.docx | DOCX document | |
| Attachment Two CMRD Routine Road Maintenance Schedule of Items.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROAD
FROM/TO
(TERMINI)
LENGTH
ROAD
MATERIAL
Notes
BLADE &
COMPACT
DISC, BLADE
& COMPACT
SPOT SURFACE
"SAND/CLAY"
SPOT SURFACE
"AGGREGATE
BASE" EQUIPMENT
RENTAL
ROAD
DITCHES
CMP INSTALL/
REPLACE,
GOV'T
FURNISHED
CMP INSTALL/
REPLACE, 36-
INCH
ROCK CROSSING
INSTALL/ REPLACE
5.1.2 5.1.3 5.2.1(a) 5.2.2 5.3.3 5.4.1 5.6.1 5.6.2 5.6.5
MI MI CY TON HR MI LF LF LF
309 Hwy 267/Hwy 375 19.80 Road reconditioning 19.8 100 19.8 313 359/Hwy 267 7.60 Road reconditioning 7.6 314 Hwy 375/309 13.50 Road reconditioning 13.5 360 309/301 8.10 Road reconditioning 8.1 8.1 367 360/Hwy 267 8.20 Road reconditioning 8.2 8.2 374 360/367 3.10 Road reconditioning 3.1 3.1 101 Hwy 65/EOC 2.00 Road reconditioning 2 2 103 105/Hwy 65 5.90 Road reconditioning 4.00 4.00 105 Hwy 65/Hwy 12 12.30 Road reconditioning 12.3 12.3 122 107/187 4.30 Road reconditioning 4.3 4.3 50 128 Hwy 65/103 5.60 Road reconditioning 5.6 132 Hwy 65/103 2.30 Road reconditioning 2.3 2.3 150 Hwy 12/EOC 1.80 Road reconditioning 1.8 1.8 173 109/113 2.50 Road reconditioning 2.5 2.5 180 Hwy 379/Hwy 65 5.00 Road reconditioning 5 5
0 100.10 0.00 100.00 0.00 73.40 0.00 0.00 50.00
CONTRACT BASE Schedule of Items Apalachicola Road Maintenance and Repair
CRITICAL SUBTASK NUMBER:
UNITS:
Quantity Totals:
Unit Price: Dollar Total (per activity):
Dollar Total (Contract):
Table 1