Attachment Three CMK2 Recurrent Road Maintenance Schedule of Items .xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Road Maintenance for Forest System Roads Federal contract opportunity
- Solicitation number
- 12445221Q0035
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment Two A001 Base Schedule of Items.pdf | ||
| Attachment Three A001 Optional Schedule of Items.pdf | ||
| Apalachicola Road Maintenance and Repair Base SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| 12445221Q0035 Amendment.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Apalachicola Road Maintenance and Repair SOI.pdf | ||
| APA ROAD MAINTENCE OPTIONAL SOI.pdf | ||
| Attachment Five- Wage Determination.pdf | ||
| 12445221Q0035 RFQ.pdf | ||
| Attachment Four- DrawingsRoad Maintenance_Drawings.pdf | ||
| Attachment One- Statement of Work _.docx | DOCX document | |
| Attachment Two CMRD Routine Road Maintenance Schedule of Items.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021_CMRD_WO_1
| Apalachicola Road Maintenance and Repair | |||||||||||||
| Schedule of Items | |||||||||||||
| CMK2 Recurrent Road Maintenance | |||||||||||||
| ROAD | FROM/TO (TERMINI) | LENGTH | ROAD MATERIAL | Notes | BLADE & COMPACT | DISC, BLADE & COMPACT | SPOT SURFACE "SAND/CLAY" | SPOT SURFACE "AGGREGATE BASE" | EQUIPMENT RENTAL | ROAD DITCHES | CMP INSTALL/ REPLACE, GOV'T FURNISHED | CMP INSTALL/ REPLACE, 36-INCH | CMP INSTALL/ REPLACE, 24-INCH |
| CRITICAL SUBTASK NUMBER: | 5.1.2 | 5.1.3 | 5.2.1(a) | 5.2.2 | 5.3.3 | 5.4.1 | 5.6.1 | 5.6.2 | 5.6.3 | ||||
| UNITS: | MI | MI | CY | TON | HR | MI | LF | LF | LF | ||||
| FH-13 | Hwy 65/Hwy 67 | 17.00 | LR | Road reconditioning | 17 | 540 | |||||||
| 305 | Hwy 267/358 | 8.00 | Road reconditioning | 8 | 200 | 8 | |||||||
| 309 | Hwy 267/Hwy 375 | 19.80 | Road reconditioning | 19.8 | 100 | 19.8 | |||||||
| 313 | 359/Hwy 267 | 7.60 | Road reconditioning post bridge removal | 7.6 | 200 | ||||||||
| 348 | 365/309 | 10.8 | Road reconditioning | 10.8 | 560 | ||||||||
| 350 | FH-13/309 | 5.60 | Road reconditioning | 5.6 | 155 | 10.256 | |||||||
| 314 | Hwy 375/309 | 13.50 | Road reconditioning | 13.5 |
| Quantity Totals: | 0 | 82.3 | 0 | 1755 | 10.256 | 27.8 | 0 | 0 | 0 |
| Unit Price: | |||||||||
| Dollar Total (per activity): | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Dollar Total (Contract): $0.00
File details come from the government source that posted it. Updated .