Attachment_Technical Exhibit.pdf

PDF 113 KB Posted

Attached to
Document Shredding at CCAD
Solicitation number
W912NW-26-Q-A010
Issued by

About this file

These are two Technical Exhibits (Attachment 1 and Attachment 2) from a federal contract for document shredding services at Corpus Christi Army Depot (CCAD). The Performance Requirements Summary (Attachment 1) outlines that the contractor must provide on-site document shredding at indoor and outdoor locations at least every two weeks, with a performance standard of shredding 98% of containers during each service visit. The Contracting Officer's Representative (COR) will conduct periodic inspections and document any performance failures in monthly reports.

The Deliverables Schedule (Attachment 2) specifies two key deliverables: a Certificate of Destruction within five business days of each shredding service visit, and training certificates to be submitted within thirty days of contract award and annually thereafter. Both documents are to be submitted in paper or electronic format to the CCAD Shredding Contract COR. The documentation emphasizes regular service, high performance standards, and consistent reporting to ensure compliance with government requirements.

View the file

Other files

File Type Posted
Questions Document Shredding.pdf PDF
WAGE DETERMINATIONS UNDER REV 28.pdf PDF
W912NW26QA010 Document Shredding.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 / TECHNICAL EXHIBIT 1

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

PWS Paragraph Task Performance Standard Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

Step 1:

1.3

Step 2:

The Contractor shall provide man-power, set-up and on-site shredding at designated indoor and outdoor locations. The Contractor shall accomplish CCAD Document shredding services at a minimum of every two weeks or as required by the Government.

Step 3:

The Contractor shall shred 98% of the containers every two weeks or as required by the government.

Step 4:

Failure to follow direction and therefore be annotated in the COR monthly report.

Step 5:

Periodic Inspection – COR or representative will examine 10 % of the designated bins

ATTACHMENT 2 / TECHNICAL EXHIBIT 2

Deliverables Schedule

Deliverable Frequency Number of Copies Medium/Format Submit To

Certificate of Destruction, as required in paragraph 5.3

Step 2:

Within five business days of each shredding service visit.

Step 3:

One copy, sent to the COR

Paper or electronic

Corpus Christi Army Depot Shredding Contract

COR

Certificate of completion for required training

Step 2:

Within thirty of award and annually thereafter provide training certificates

Step 3:

Copy sent to the

Paper or electronic

Corpus Christi Army Depot Shredding Contract