Attachment_Technical Exhibit.pdf
PDF 113 KB Posted
- Attached to
- Document Shredding at CCAD
- Solicitation number
- W912NW-26-Q-A010
About this file
These are two Technical Exhibits (Attachment 1 and Attachment 2) from a federal contract for document shredding services at Corpus Christi Army Depot (CCAD). The Performance Requirements Summary (Attachment 1) outlines that the contractor must provide on-site document shredding at indoor and outdoor locations at least every two weeks, with a performance standard of shredding 98% of containers during each service visit. The Contracting Officer's Representative (COR) will conduct periodic inspections and document any performance failures in monthly reports.
The Deliverables Schedule (Attachment 2) specifies two key deliverables: a Certificate of Destruction within five business days of each shredding service visit, and training certificates to be submitted within thirty days of contract award and annually thereafter. Both documents are to be submitted in paper or electronic format to the CCAD Shredding Contract COR. The documentation emphasizes regular service, high performance standards, and consistent reporting to ensure compliance with government requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions Document Shredding.pdf | ||
| WAGE DETERMINATIONS UNDER REV 28.pdf | ||
| W912NW26QA010 Document Shredding.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 / TECHNICAL EXHIBIT 1
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph Task Performance Standard Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
Step 1:
1.3
Step 2:
The Contractor shall provide man-power, set-up and on-site shredding at designated indoor and outdoor locations. The Contractor shall accomplish CCAD Document shredding services at a minimum of every two weeks or as required by the Government.
Step 3:
The Contractor shall shred 98% of the containers every two weeks or as required by the government.
Step 4:
Failure to follow direction and therefore be annotated in the COR monthly report.
Step 5:
Periodic Inspection – COR or representative will examine 10 % of the designated bins
ATTACHMENT 2 / TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency Number of Copies Medium/Format Submit To
Certificate of Destruction, as required in paragraph 5.3
Step 2:
Within five business days of each shredding service visit.
Step 3:
One copy, sent to the COR
Paper or electronic
Corpus Christi Army Depot Shredding Contract
COR
Certificate of completion for required training
Step 2:
Within thirty of award and annually thereafter provide training certificates
Step 3:
Copy sent to the
Paper or electronic
Corpus Christi Army Depot Shredding Contract
File details come from the government source that posted it. Updated .