Attachment SELF-PERFORMED CALCULATIONS.pdf

PDF 119 KB Posted

Attached to
Y1DA--504-19-102 - UPGRADE FIRE SYSTEMS AND DOORS (VA-22-00019557)
Solicitation number
36C25722B0015
Issued by

About this file

This document contains instructions for calculating self-performed work for a federal contract opportunity to upgrade fire systems and doors at the Thomas E. Creek VA Medical Center in Amarillo, Texas. The solicitation seeks a contractor to remove and replace designated smoke and fire doors, frames and hardware in five buildings, and includes four add alternates to upgrade fire pumps, replace a clapper valve, provide optional fire and smoke doors, and replace all exit signs. Offerors must complete calculations showing the percentage of work projected to be paid to non-VIP SDVOSBs and the resulting percentage of self-performed work, with limitations of 50% for services, 85% for general construction, and 75% for special trade contractors. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 17.

View the file

Other files

File Type Posted
Pre-Bid Sign In Sheet.pdf PDF
36C25722B0015 0001.docx DOCX document
Attachment OSHA - EMR Requirement.pdf PDF
36C25722B0015_1.docx DOCX document
504-19-102 Drawings Upgrade Fire Systems and Doors.pdf PDF
504-19-102 SPECS Upgrade Fire Systems and Doors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW

“Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)

File details come from the government source that posted it. Updated .