Attachment SELF-PERFORMED CALCULATIONS.pdf
PDF 119 KB Posted
- Solicitation number
- 36C25722B0015
About this file
This document contains instructions for calculating self-performed work for a federal contract opportunity to upgrade fire systems and doors at the Thomas E. Creek VA Medical Center in Amarillo, Texas. The solicitation seeks a contractor to remove and replace designated smoke and fire doors, frames and hardware in five buildings, and includes four add alternates to upgrade fire pumps, replace a clapper valve, provide optional fire and smoke doors, and replace all exit signs. Offerors must complete calculations showing the percentage of work projected to be paid to non-VIP SDVOSBs and the resulting percentage of self-performed work, with limitations of 50% for services, 85% for general construction, and 75% for special trade contractors. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Sign In Sheet.pdf | ||
| 36C25722B0015 0001.docx | DOCX document | |
| Attachment OSHA - EMR Requirement.pdf | ||
| 36C25722B0015_1.docx | DOCX document | |
| 504-19-102 Drawings Upgrade Fire Systems and Doors.pdf | ||
| 504-19-102 SPECS Upgrade Fire Systems and Doors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW
“Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________
c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)
File details come from the government source that posted it. Updated .