Attachment - Quote Pricing Breakdown RFQ No. 36C26127Q0072.docx

DOCX document 36 KB Posted

Attached to
Z1DZ--Replace Dental Vacuum Piping
Solicitation number
36C26127Q0072
Issued by

About this file

This is a Quote Price Breakdown template for RFQ No. 36C26127Q0072, a construction project to replace dental vacuum piping at the VA Las Vegas Medical Center in North Las Vegas, Nevada. The template is organized by construction divisions and requires contractors to provide detailed pricing across multiple cost categories including labor (number of personnel, hourly rates, and total hours), materials (quantity and unit costs), and overhead and profit margins. The breakdown covers eight major divisions: General Requirements (including project management, superintendence, mobilization, infection control, and equipment rental), Existing Conditions, Thermal and Moisture Protection, Openings, Finishes, Special Construction, Plumbing, and Electrical work. Contractors must populate each line item with costs and arrive at a subtotal for each division, then calculate a final total offer that includes overhead, profit, bonds, and insurance.

This solicitation is a set-aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors and is being conducted as a price-only procurement. Quotes must be submitted by email to David Rovner (Contract Specialist) and copied to Charee Harris (Contracting Officer) by 12:00 PM PDT on November 17, 2026. Only certified SDVOSB contractors registered in SAM.GOV and the SBA's VETCERT database at the time of submission are eligible. The project has an estimated value between $1,000,000 and $5,000,000 with an approximate 180-calendar-day performance period from the Notice to Proceed. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN

RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN

QUOTE PRICE BREAKDOWN

Replace Dental Vacuum Piping, Las Vegas, NV

DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

01. General Requirements (Division 01)

A. Project Manager

$
$

B. Superintendent

$
$

C. General Requirements

$
$

D. Mobilization

$
$

E. Premium After Hours Work

$
$

F. Infection Control (ICRA)

$
$

G. Storage Container/Office (rent)

$
$

H. Dumpster (rent)

$
$
$
$
$
$
$
$
$
$
$
$
$
$

01. General Requirements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$

02. Existing Conditions Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

03. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$

03. Thermal and Moisture Protection Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

04. Openings (Division 08)

$
$
$
$
$
$
$
$

04. Openings Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

05. Finishes (Division 09)

$
$
$
$
$
$
$
$

05. Finishes Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

06. Special Construction (Division 13)

$
$
$
$
$
$
$
$

06. Special Construction Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

07. Plumbing (Division 22)

$
$
$
$
$
$
$
$

07. Plumbing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Electrical (Division 26)

$
$
$
$
$
$
$
$

08. Electrical Subtotal

$
$

SUB TOTAL (Items 1 – 08)

Overhead

$
$

Profit

$
$

Bonds and Insurance

$
$

Total

$
$

TOTAL OFFER

Note: All other costs may be included as a separate item and shall be specified in this breakdown.