Attachment - Quote Pricing Breakdown RFQ No. 36C26127Q0072.docx
DOCX document 36 KB Posted
- Attached to
- Z1DZ--Replace Dental Vacuum Piping
- Solicitation number
- 36C26127Q0072
About this file
This is a Quote Price Breakdown template for RFQ No. 36C26127Q0072, a construction project to replace dental vacuum piping at the VA Las Vegas Medical Center in North Las Vegas, Nevada. The template is organized by construction divisions and requires contractors to provide detailed pricing across multiple cost categories including labor (number of personnel, hourly rates, and total hours), materials (quantity and unit costs), and overhead and profit margins. The breakdown covers eight major divisions: General Requirements (including project management, superintendence, mobilization, infection control, and equipment rental), Existing Conditions, Thermal and Moisture Protection, Openings, Finishes, Special Construction, Plumbing, and Electrical work. Contractors must populate each line item with costs and arrive at a subtotal for each division, then calculate a final total offer that includes overhead, profit, bonds, and insurance.
This solicitation is a set-aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors and is being conducted as a price-only procurement. Quotes must be submitted by email to David Rovner (Contract Specialist) and copied to Charee Harris (Contracting Officer) by 12:00 PM PDT on November 17, 2026. Only certified SDVOSB contractors registered in SAM.GOV and the SBA's VETCERT database at the time of submission are eligible. The project has an estimated value between $1,000,000 and $5,000,000 with an approximate 180-calendar-day performance period from the Notice to Proceed. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN
RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN
QUOTE PRICE BREAKDOWN
Replace Dental Vacuum Piping, Las Vegas, NV
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
01. General Requirements (Division 01)
A. Project Manager
| $ |
| $ |
B. Superintendent
| $ |
| $ |
C. General Requirements
| $ |
| $ |
D. Mobilization
| $ |
| $ |
E. Premium After Hours Work
| $ |
| $ |
F. Infection Control (ICRA)
| $ |
| $ |
G. Storage Container/Office (rent)
| $ |
| $ |
H. Dumpster (rent)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
01. General Requirements Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
02. Existing Conditions (Division 02)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
02. Existing Conditions Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
03. Thermal and Moisture Protection (Division 07)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
03. Thermal and Moisture Protection Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
04. Openings (Division 08)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
04. Openings Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
05. Finishes (Division 09)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
05. Finishes Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
06. Special Construction (Division 13)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
06. Special Construction Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
07. Plumbing (Division 22)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
07. Plumbing Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
08. Electrical (Division 26)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
08. Electrical Subtotal
| $ |
| $ |
SUB TOTAL (Items 1 – 08)
Overhead
| $ |
| $ |
Profit
| $ |
| $ |
Bonds and Insurance
| $ |
| $ |
Total
| $ |
| $ |
TOTAL OFFER
Note: All other costs may be included as a separate item and shall be specified in this breakdown.